— increased flooding is destroying property, causing hundreds of millions of euros of damage, and putting lives at risk;
— communities are waiting, in some cases for decades, for flood defences, protection and amelioration projects to be built;
— the delivery of flood defences is dangerously slow or grinding to a complete halt, with planning, licensing, permitting, tendering and the delivery of judicial reviews being slower in Ireland than in most of the European Union;
— flood forecasting has been available in the State for the last 10 years, but has not been made available to the public; and
— flood campaigners who have sought flood forecasts have had to contact county councils in order to get key life-saving information; and
calls on the Government to:
— immediately make flood forecasts available to the public through Met Éireann;
— introduce push notifications for flood warnings in local areas that have a significant threat of flooding;
— set up weather stations in mountain areas where the level of rainfall has a significant impact on river catchments;
— adequately staff planning departments in city and county councils;
— adequately staff An Coimisiún Pleanála;
— reform the planning process by ensuring that vexatious planning objections are no longer allowed, and objectors who do not have a geographic or a material interest in a project should not be allowed to object to a planning application for a flood defence or flood alleviation plan where life and livelihoods are under threat;
— take planning applications for flood defences and flood amelioration projects, where life and livelihoods are threatened, out of local authorities where blockages exist, and create a fast-tracked national planning process for these projects, and this will help flood defence schemes that affect numerous counties;
— simplify planning applications and ensure that only one standardised planning application is necessary for all planning, permitting, licensing and regulatory authorities;
— rebalance the planning process where habitat and Special Areas of Conservation planning conditions exist, in favour of protecting human life and livelihoods that are threatened by flooding;
— expedite public consultations where life and livelihoods are threatened by flooding;
— roll out nature-based solutions and compensate farmers upstream on river catchments to reduce flooding;
— end construction on flood plains;
— properly staff the court system, so that judicial reviews are dealt with in a speedy fashion;
— streamline the judicial review process by removing time-consuming procedures; and
— review the lack of financial supports for those who cannot get insurance for cars and other costly possessions with a view to supporting these families.
There is an anger building throughout many regions in the country at the lack of the ability of the Government to build flood defences. The dysfunction of this Government when it comes to the construction of infrastructure is putting life, limb and livelihood in severe danger across the Twenty-six Counties. It is not just about money. At the heart of this problem is gross Government incompetency to build infrastructure.
Much of the country was flooded last week. The Government cannot control the weather but it can control the forecasting that happens and the flood defences that are allowed to be put in place to protect communities. Two years ago, I asked the Minister for public expenditure for a timeframe for the delivery of flood schemes throughout the country. The Minister refused to give me a timeframe. Why? This Government is allergic to accountability and measurables. It does not want a situation whereby it can be held to account on this particular issue.
Let us consider some of the projects. Midleton was devastated by Storm Frank in 2015. Houses and businesses were trashed and lives were put at risk. That community was promised that flood defences would be built but nothing happened. Storm Babet hit in 2023. Some 600 homes and 300 businesses were damaged by the floods. The cost of those particular floods was €200 million. Storm Babet nearly took human life. So fast was the influx of water in some locations that people were caught in their houses and barely able to get out. Cars were floating down driveways and through estates.
It is now 2026. What happens in the likes of Midleton at the moment is that an elderly gentleman stays awake in the middle of the night to watch river levels to see if the banks are going to break so he can tell the families living next to the river that their lives are in danger. In 2026 in Midleton, a human water gauge is the difference between a person losing his or her life and not. That is an incredible situation. In 2026, a planning application has not even been put into Cork County Council for flood defences for Midleton. A planning application has not even been written.
Enniscorthy has been waiting for a project for 25 years. In 2014, €55 million was allocated to the flood defence scheme in Enniscorthy. The town was a lake last week. There have been 12 floods in those 25 years. A planning application has not even been written for that project. That is an absolute disgrace. There is a direct responsibility in the administration of this country for that problem.
In Clontarf, it has taken 30 years from concept to completion for flood defences. In Sandymount, it has taken 20 years from concept to completion for flood defences. Flood defences were promised in Galway in 2019 but there is no word of them happening before 2034. For all those projects, the timelines will only apply if everything works perfectly. We know there are plenty of slips between the cup and the lip in these particular projects.
In every single area of infrastructure, this Government is failing in delivery. We heard from Uisce Éireann at a committee recently. Its representatives said it is going to take until 2050 before the gaps in water infrastructure, which are holding back the building of houses, are filled. We know that right now, the M50 is a car park. People are paying €200 million per year in tolls on the M50 to sit in a car park. We know that the housing crisis is going into reverse due to the lack of an ability of the Government to build.
Planning, licensing, permitting, tendering and judicial reviews in this country are slower than anywhere else in the European Union. These are all areas for which the Government is responsible. These are all areas in the gift of the Government.
The area of flood forecasting is even more frustrating. I listened to the news last week about what happened in Rathfarnham. People said they simply did not know it was going to happen. The first they knew of it was when they were inundated with water coming through their front doors at 5 a.m. In 2016, the Government created a flood defence weather forecasting system. It sounded fantastic. It looked at river catchment areas and river height levels. It looked at saturation levels on the ground. That information has been available since 2016 to everybody but the taxpayers who are paying for it. Incredibly, the information is not given to the general public. It is given to the local authorities and if you are that poor, unfortunate fellow who is the water gauge in Midleton, you have to go onto the county council's website on a regular basis to get the updates. Other countries provide push notifications. People get a text to tell them that serious rainfall is likely in the local area, there is a good chance the river will overflow and they should protect life and property. That does not happen in this country. It is not that a big investment is needed to make this service available to the public. It is not even that there is a technical problem with making the information available to the public. All that is needed is a bloody decision to be taken by the Government. It is incredible that the service is not available. The fact that we do not have weather stations on top of mountains in river catchment areas means we are dependent on radar to tell us the level of rain that is likely to fall in a particular area.
Aontú has put forward this motion. One of the big problems in the political system is that everybody is focused on the media cycle. Flooding is going to drop off the media cycle as soon as the weather gets better and everybody here will forget about flooding for the next two or three years until there is another massive flooding crisis. Everybody will then be shocked, annoyed and stressed. Let us not do that to the people. Let us put in the work now to ensure that in two years' time this crisis does not happen again.
We are looking for simple things. We want to make sure that those weather forecasts are made directly available to the people and that push notifications are put in place. We want weather stations in mountainous areas for river catchments. With regard to the planning aspects of the issue, we must ensure that Departments, county councils and An Coimisiún Pleanála are properly staffed. I know of builders whose applications for hundreds of houses have been in An Coimisiún Pleanála for 18 or 20 months. Decisions are yet to be made on those applications. The organisations that are making the planning decisions do not currently have the necessary staff. We need to reform the planning system to exclude vexatious planning objections. If you are building a slatted shed in Cork, people in Donegal can put in objections, despite the fact that they have no material or geographical interest. They can submit vexatious objections that can total the whole process forever. That needs to come to an end.
We also need to ensure that we have a balance in this situation. Right now, we have special areas of conservation, SACs, and habitat directives. They are important and fulfil a particular role. The pearl mussel in Enniscorthy is an important part of biodiversity. However, human life is also important. Livelihoods are important. We need to completely rebalance the hierarchy of priorities when it comes to planning applications in favour of human beings in the context of projects where life is under threat. That needs to happen.
We also need to simplify planning applications. I know of planning applications that need a van to be brought to the location. There are 30,000 pages in some planning applications. Surely something will go wrong in those planning applications that will allow for a judicial review. A smart solicitor only needs to find one line on one page that is out of kilter to be able to hold a judicial review to slow the whole process. I also know that there are three or four different varieties of planning application. One variety is required for licensing or a particular permitting organisation. Another variety is required for the Department and another still may be required for the council.
We need one planning application to suit every single State body. An enormous layer of bureaucracy and red tape has been built up and we are drowning in it. Real people will drown in real floods as a result if it is not sorted out. It is so frustrating.
We need nature-based solutions and to help those suffering from the costs of this. A lot of the supports for floods and storms sound great when they are launched but after Storm Éowyn, people waited months and only got a third of the income they were promised at the start. Many people who own cars in flood areas do not have insurance. We see cars floating down the road but the Government will not support the costs arising from that. We need the State to step in in terms of those insurance policies for people who live on flood plains where the State provided the planning permission for the housing to be built. I hope the Government will support and implement this motion.