I appreciate the constructive manner in which the Deputy has raised the questions, particularly in the context of her question as to how she can work with us. I appreciate that response. She has not attempted to name-call anybody or misrepresent people. I appreciate that.
What I was endeavouring to say is that the commission did examine the site extensively, including in the context of cartographic and archival research and site surveys. It concluded that while it is likely that some children are buried on the grounds, that is, somewhere within the 60 acres, it found no physical or documentary evidence locating burial sites. When I spoke to survivors early on - not this year but, certainly, two to three years ago - there were differing perspectives in terms of how we deal with the 60 acres and with the site itself. It is not just on this specific one that An Coimisiún Pleanála has made an adjudication.
One of the difficulties is, I am advised, that excavation without evidence of location is neither feasible nor lawful. That is a problem. Under the Institutional Burials Act 2022, the Government can only appoint a director of authorised intervention where it is satisfied that burials have taken place and there is evidence that those burials are manifestly inappropriate. In the case of Bessborough, I am advised that the legal threshold cannot currently be met because the location of many burials remains unknown. However, there are significant and meaningful planning protections in respect of the specific application at Bessborough, namely: a forensic archaeological monitoring strategy is mandatory; a forensic archaeologist must be present throughout excavation works; and, as the Deputy said, all works must cease immediately if human remains are discovered. That is obviously designed to ensure dignity, protection and accountability.
CPOs just do not happen automatically even if people apply for them. There are huge legal thresholds to be overcome in respect of a CPO of a site like this, particularly given that the council has designated it as appropriate for housing in its city development plan and, in the context of its executive functions, gave planning permission to the development of housing there. That has now been endorsed by An Bord Pleanála. Therefore, a CPO is not a straightforward, simplistic thing the Government can do by just pressing a button. That also needs to be acknowledged.
This matter does need reflection and examination. I fully accept the disquiet that is out there.
We have done everything we possibly can over the last number of years in fulfilling the action plan that was outlined by the last Government in all of the areas that were covered at that time, in relation, as I said, to access to records, in terms of a redress scheme and much more than just that. We passed the Institutional Burials Act, which is now operational in Tuam and yielding an outcome there. Up to now, to be blunt about it, there was no real push or pressure to excavate the entire 60 acres at Bessborough.