278. Deputy Paul Lawless asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the list of all flood relief and flood risk management projects in County Mayo since 2020, by each project: the name and location of the project; the total approved budget and amount spent to date, including maintenance and ongoing operational costs; whether the project is in planning, under construction, or completed; the number of properties and key infrastructure protected or expected to be protected; whether any nature-based solutions have been included in the design, implementation, or evaluation including but not limited to natural water retention measures, wetland restoration, riparian planting, or sustainable urban drainage systems; the details of those measures the scale of investment in any nature-based solutions; how the effectiveness of any nature-based solutions in reducing flood risk is being evaluated, in tabular form; and if he will make a statement on the matter. [13726/26]

View answer

Written answers

Since 2020, three flood relief schemes have commenced or been completed in county Mayo - Westport (Cois Abhainn & Ashwood) FRS, Crossmolina FRS and Ballina FRS.

The details of each are set out in the table under.

Flood Relief and Flood Risk Management Projects in Co. Mayo since 2020

Name

Location

Total Project Budget

Spend to Date

Project Stage

Properties Protected

Westport (Cois Abhainn & Ashwood) FRS

Westport

€2 million

€1.7 million

Complete

36

Crossmolina FRS

Crossmolina

€34 million

€10.4 million

Stage IV: Construction

116

Ballina FRS

Ballina

€55 million

€2.2 million

Stage III: Detailed Design

297

The Westport (Cois Abhainn and Ashwood) scheme is complete, the Crossmolina scheme is at construction and planning consent for the Ballina scheme has been granted.

Since 2018, the development of flood relief schemes involves a specific requirement for consultant engineers to assess the potential for nature-based solutions as part of the overall design of a flood relief scheme for a community. Where feasible, these measures will be implemented to reduce flood risk and contribute to achieving other benefits including water quality, biodiversity, carbon sequestration and public amenity.