The major building project referred to by the Deputy will be delivered under the Department’s ADAPT Programme. The ADAPT Programme uses a professional external Project Manager to co-ordinate and drive the Design Team to achieve the best possible timeframe for the project through the stages of Architectural Planning to Tender and Construction.
The Brief for this project is the development of a 32 Classroom Primary School with 4 classrooms for pupils with Special Educational Needs including Pyrite Remediation, the Refurbishment of Existing Buildings and the construction of a New Build Extension and all associated site works, including associated play areas.
The major building project is currently at an early stage of architectural planning – Stage 1 – Preliminary Design, where the design team assess the site and current buildings, and prepare their initial sketch schemes.
A preferred design option, including the scope and extent of works to be carried out will be established during this early stage, to be then further detailed and developed and fully cost-planned, before seeking statutory approvals, including planning permission.
Interim Stage 1 architectural workshops were held between the Design Team and the Department in Q4 2023, and the Design Team submitted their Stage 1 report to the Department in late Q4 2023.
Upon review of the report, a further detailed architectural workshop was held between the School Authorities, the Project Manager, Design Team and the department in February 2024.
Following that meeting, the Design Team were requested to consider the department’s comments in relation to the site and design options presented.
Department Officials and Design Team members have met on site at St. Patrick’s National School in attempts to develop appropriate design solutions that will best meet the needs of the school, and being cognisant of the 3rd party occupiers at the same site.
The Design Team are to prepare a revised Stage 1 submission, which upon receipt, will be reviewed, and a Stage 1 Stakeholders meeting will then be arranged.
Since 2020, my department has invested over €6.9 billion in our schools throughout the country under the National Development Plan, involving the completion of over 1,400 school building projects along with over 4,000 small-scale improvement works to meet priority maintenance needs and advance energy efficiency and climate goal.
In addition, repurposing and optimisation of existing accommodation capacity across the school estate has been a key enabler of timely, local provision of special class capacity in a way that supports best practice in inclusion and integration. Circa 80% of new special classes in 2025/26 are being facilitated in repurposed classroom accommodation.
This investment has delivered real benefits for school communities.
A total capital allocation of €7.55 billion for the Department of Education and Youth has been confirmed for the period 2026-2030 under the National Development Plan. As part of this NDP allocation my department will place a strong emphasis on provision for children with special educational needs, with a particular focus on meeting annual school place needs. In relation to project rollout for Large-Scale projects and Additional School Accommodation scheme projects, the approach will be to continue to maximise the capacity of the existing school estate as much as possible in the first instance and provide necessary additional capacity through targeted and prioritised project rollout over the course of 2026 to 2030 period to meet the most urgent and prioritised needs.
As part of the NDP Implementation Plan for the education and youth sector, a first tranche of projects to progress to tender and/or construction during 2026 and 2027 was published in January 2026.
Prioritisation will continue to identify further tranches of projects to proceed to tender and construction over the NDP period, with stakeholder consultation to commence in June 2026.
Our NDP Implementation Plan will optimise outputs from the NDP allocations, with a strong focus on maximising existing school capacity, progressing priority projects where local capacity across schools in the area is insufficient, and ensuring delivery that is affordable, offers value for money, and meets functional needs.
I would like to advise the Deputy, over this period, my Department has provided €1,906.47 million in capital funding for Dublin schools. A total of 261 schools have been upgraded either through provision of a new school building, a large-scale extension or provision of modular accommodation. 20 school projects were included in the NDP Implementation Plan to go to tender or construction in 2026 and 2027.
There are currently 54 school projects in Dublin under construction. This summer, 53 schools are approved to undergo works as part of the Climate Action Summer Works Scheme.
In addition, since 2020 a total of 529 special classes have been sanctioned in Dublin, of which 128 were sanctioned for September 2026.