Skip to main content
Normal View

Thursday, 18 Jun 2026

Written Answers Nos. 296-308

Departmental Schemes

Questions (296)

Michael Cahill

Question:

296. Deputy Michael Cahill asked the Minister for Culture, Communications and Sport if grant schemes or funding supports are available to assist businesses, community groups or local organisations who wish to develop visual art murals that promote local heritage, tourism, amenities and community identity; if particular supports exist for projects highlighting local attractions such as greenways, natural amenities and cultural heritage; the application process and eligibility criteria for same; and if he will make a statement on the matter. [46569/26]

View answer

Written answers

The Creative Ireland Programme is an all of government initiative in my department set up 8 years ago with the ambition to transform our lives, society and economy by increasing the connection to our collective creativity.

Within the Creative Ireland Programme, Creative Communities is a partnership between my Department and Ireland’s 31 local authorities, supported by the Department of Culture, Communications and Sport, and the Department of Housing, Local Government and Heritage.

Each local authority has a locally developed Culture and Creativity Strategy 2023-2027 and receives funding to deliver local strategic priorities that deliver on the principles and values of Creative Communities, including broadening access to and participation in, cultural and creative activities locally. This can include the delivery of a mural programme at local level.

Each local authority has the autonomy to use their Creative Ireland funding in line with the priorities of their Culture and Creativity Strategy. Individuals and organisations should liaise directly with their local authority around application processes.

Commemorative Events

Questions (297)

John Paul O'Shea

Question:

297. Deputy John Paul O'Shea asked the Minister for Culture, Communications and Sport if his Department intends to celebrate the 150th anniversary of the birth of Hanna Sheehy-Skeffington in May 2027; and if he will make a statement on the matter. [46457/26]

View answer

Written answers

The Commemorations Unit in my Department has responsibility for coordinating commemorative programming and ensuring that key historical events, themes and personalities are honoured and commemorated appropriately.

Commemorations are delivered through collaboration between the State, key project partners and stakeholders. This is always guided by expert and independent advice. Previously, this was from the Expert Advisory Group and now it comes from the Commemorations Advisory Committee, chaired by Bryan Dobson.

The 150th anniversary of the birth of Hanna Sheehy-Skeffington has been identified by the Commemorations Advisory Committee and other stakeholders as an important one and worthy of recognition. Her life is significant across a number of key areas in our history – the fight for independence, the history of Irish labour, the history of Irish women and their fight for rights and recognition.

The centenary of Hannah Sheehy-Skeffington’s birth is contained within the Programme for Government as a key anniversary for commemoration next year. My Department will work with our project partners to explore options for ensuring that this anniversary is remembered appropriately, within the established commemorations framework.

Our partners in the National Library plan a public engagement on the anniversary, based on their collection of her personal papers, although the exact form of this engagement is still to be finalised.

I would encourage interested individuals or groups who have ideas for the appropriate commemoration of her life to reach out to the commemoration’s coordinator of their local authority who develop and deliver commemorative programming with support from my Department.

Broadband Infrastructure

Questions (298)

John Paul O'Shea

Question:

298. Deputy John Paul O'Shea asked the Minister for Culture, Communications and Sport if he can outline the deployment areas that remain to be upgraded in Cork as part of the National Broadband Plan; if all areas will be completed by the end of 2026 as per the contract; and if he will make a statement on the matter. [46458/26]

View answer

Written answers

The National Broadband Plan (NBP) is the Government initiative to deliver high-speed broadband to all premises in Ireland. In addition, Ireland's Digital Connectivity Strategy published in December 2022, sets out a number of targets including that all Irish households and businesses will be covered by a Gigabit network no later than 2028.

In the Deputy’s own county of Cork, a significant investment of €314 million is being made under the NBP. There are 62,575 premises passed with a high-speed fibre broadband network and 72,435 premises available to order/pre-order, with over 21,430 premises now connected. A further circa 20,425 premises in County Cork will be passed by National Broadband Ireland’s (NBI) high speed fibre broadband by the end of the network deployment.

NBI have advised that County Cork comprises of 28 Deployment Area’s (D.A) of which 25 are now available to order/pre-order. The D.A. of Dunmanway (4,195 premises will be made available to order/pre-order in the period July 2026 to September 2026 and the D.A.’s of Ballingeary (963 premises) and Carriganimmy (3,974 premises) will be made available to order/pre-order in the period October 2026 to December 2026.

Further details are available on specific areas within County Cork which can be monitored via the National Broadband Ireland website. This website is regularly updated providing the expected timeline for delivery and status of any works that are initiated at any point in time. National Broadband Ireland also has a dedicated email address, reps@nbi.ie, which can be used by Oireachtas members for specific queries.

Along with the NBP intervention plan, progress is being made by commercial operators in expanding their next generation networks throughout the country including the deputy’s own county of Cork ensuring the targets set out in the Digital Connectivity Strategy are achieved. These plans will see improved high speed broadband access across County Cork.

Broadcasting Sector

Questions (299)

Aengus Ó Snodaigh

Question:

299. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the additional expenditure which would be required to provide TG4 with the additional annual funding it sought as part of its Post-Covid Vision document for the 2022-2025 period and which has not yet been provided in funding increases since its publication in 2021; the additional expenditure which would be required to provide TG4 with the outstanding portion of additional annual funding it sought in its 2026 pre-budget submission and did not receive; the estimated cost of increasing TG4 funding by 5%, by 10%, by 15%, by 20%, and by the cost of inflation since Budget 2026. [46639/26]

View answer

Written answers

In accordance with Section 99 of the Broadcasting Act 2009 (as amended), TG4 is required every five years to prepare a statement of strategy, which together with its statutory objects, in turn informs the preparation of an annual statement of performance commitments. Coimisiún na Meán is required to review the extent to which these commitments have been met annually and, as provided for in Section 124 of the Act, to make recommendations to me as Minister in relation to the adequacy of funding for TG4 each year.

While TG4 did publish a post-Covid vision document, it was not a statement of strategy or annual statement of performance commitments as provided for under the legislation and on which consideration of funding requirements is based. Since publication of the post-Covid vision, TG4 has published its 2023-2027 Statement of Strategy.

In its most recent review of public funding allocations, An Coimisiún recommended a funding level of €66.34m for TG4 in 2026. TG4 was allocated €65.376m in Budget 2026 which is a large proportion of what was recommended by An Coimisiún. It is also 75% greater than the amount allocated in 2020 which is indicative of successive Governments' commitment to ensuring stable, sufficient funding for public service broadcasters to maintain quality programming and public trust.

The 2026 current and capital allocations to TG4 are published in the Revised Estimates Volume. These figures are shown in the table below along with the amounts resulting from increases of 5%, 10%, 15% and 20%.

The Central Statistics Office publishes the Consumer Price Index (CPI). The change in the CPI between October 2025 and May 2026 is shown as a cumulative increase of 2.3%. The calculation of the allocations to TG4 increased by 2.3% is also shown in the table.

TG4

2026 REV Allocation

2.3% increase

5% Increase

10% Increase

15% Increase

20% Increase

€'000

€'000

€'000

€'000

€'000

€'000

Current

58,676

1,350

2,934

5,868

8,801

11,735

Capital

6,700

154

335

670

1,005

1,340

Details of An Coimisiún's most recent review and the Government's response is available at www.gov.ie/en/department-of-culture-communications-and-sport/publications/coimisi%C3%BAn-na-me%C3%A1n-funding-five-year-reviews/#2025-review Multi-Annual Reviews of RTÉ and TG4.

Coimisiún na Meán is due to report to me shortly in relation to their funding recommendations for next year and I shall consider this once I receive it in the context of negotiations for the 2027 Budget.

Broadcasting Sector

Questions (300)

Aengus Ó Snodaigh

Question:

300. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the annual expenditure spent to fund TG4 news and current programming; and the additional costs or savings expected to result from the transfer of editorial control of this programming from RTÉ to TG4 based on his discussions with RTÉ and TG4. [46640/26]

View answer

Written answers

The Future of Media Commission (FOMC) recommended that TG4 should have independent editorial control over its news services. This is to allow for greater plurality in news coverage and allow TG4 to provide an enhanced service to its audiences. The recommendation was accepted in principle in Government subject to consideration of the financial and operational implications of its implementation.

As part of the FOMC's implementation plan, Coimisiún na Meán has been working with both broadcasters to consider the implications of the recommendation, the possible options to deliver greater editorial control for TG4 in a cost effective manner that can deliver for audiences, and how this might be achieved on an incremental basis. There are many issues which have to be addressed as part of this process, from financial to human resources and operational impacts.

As part of this process, both TG4 and RTÉ continue to engage to progress TG4 achieving editorial control of Nuacht TG4. I understand that An Coimisiún and the broadcasters are working towards developing an agreed plan which is cost effective, sustainable, and serves audience needs.

The Department continues to monitor the situation and is being advised of progress by Coimisiún na Meán. The aim is for an agreed proposal which is practical and cost effective, and which provides value for money and best serves Irish audiences. The Deputy would appreciate, given the independence of both broadcasters, that my Department would not have the detailed financial information sought in his question.

I hope that good progress will be made on this and expect to hear more from Coimisiún na Meán and the broadcasters later in 2026.

Media Sector

Questions (301)

Aengus Ó Snodaigh

Question:

301. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the different estimated revenues which would be accrued annually by adopting the different launch rates proposed in Recommendation 2 of the Feasibility Study of a European Works Levy in Ireland prepared by a company (details supplied) and submitted to him by Coimisiún na Meán; and if he will make a statement on the matter. [46641/26]

View answer

Written answers

Article 13(2) of the revised Audiovisual Media Services Directive ('AVMSD') provides that Member States may require media service providers under their jurisdiction to make a financial contribution to the production of European works.

To exercise this option under the AVMSD, section 159E of the Broadcasting Act 2009 (as amended) currently provides the independent media regulator, Coimisiún na Meán, with the option to impose a content production levy on media service providers (i.e. providers of broadcasting and video on demand services) to fund a scheme (termed ‘the European works scheme’) to support the production of European works, including Irish works. Any such scheme funded from the levy receipts would require Ministerial approval.

Coimisiún na Meán appointed consultants Nordicity & Saffrey LLP to undertake research and make recommendations in relation to the feasibility of an audiovisual content levy and fund. Stakeholders were consulted throughout the feasibility report process. The report was received by my Department on 29th January 2025 and was published by Coimisiún na Meán on 8th May 2025.

Recommendation 2 of the report proposes that Ireland adopt a variable rate levy combined with a gradual increase mechanism, whereby launch rates would be set at 0.5% of gross turnover on ad revenue earned, 0.5% of pay-TV subscription revenue, and 3% of VOD revenue, with these rates gradually increasing to 1%, 1% and 5%, respectively.

The consultants set out estimates in their report that the implementation of such a mechanism would likely yield an initial €12.7m annually in levy proceeds at the launch rates. If the rates were ultimately increased to the ceiling rates proposed by the consultants, they estimated that it could potentially yield €22.5m annually in levy proceeds.

The report in full can be accessed here: www.cnam.ie/read-the-feasibility-study-on-the-audiovisual-content-levy/

I consider that the introduction of a content levy risks placing an additional financial burden on Irish households already experiencing cost-of-living pressures, particularly in the context of recent international developments. It is for that reason the Broadcasting (Amendment) Bill includes an added layer of protection for the Irish consumer by providing that Coimisiún na Meán may only impose a content production levy on broadcasters and video-on-demand providers following a direction of the Minister. I have no intention of issuing such a direction until I am satisfied that a content levy would not impose an undue burden on Irish households.

The Broadcasting (Amendment) Bill provides that RTÉ will be required to spend at least 25% of its public funding on content commissioned from the independent production sector. RTÉ and TG4 will also be excluded from receiving direct public funding from the Media Fund, in order to ensure that all funds go to independent producers and commercial media outlets.

As Minister, I fundamentally believe in supporting the Irish independent production sector, as is reflected by the many ongoing supports provided to the sector through grant funding from Screen Ireland and Coimisiún na Meán’s Sound and Vision Scheme, as well as the Section 481 film tax relief.

I will continue to engage with all relevant stakeholders to ensure that the independent production sector continues to be appropriately supported in the longer term.

Broadcasting Sector

Questions (302)

Aengus Ó Snodaigh

Question:

302. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the estimated cost of increasing Screen Ireland current funding and capital funding by 5%, by 10%, by 15%, by 20%, and by the cost of inflation since Budget 2026. [46642/26]

View answer

Written answers

The 2026 current and capital allocations to Screen Ireland are published in the Revised Estimates Volume. These figures are shown in the table below along with the amounts resulting from increases of 5%, 10%, 15% and 20%.

The Central Statistics Office publishes the Consumer Price Index (CPI). The change in the CPI between October 2025 and May 2026 is shown as a cumulative increase of 2.3%. The calculation of the allocations to Screen Ireland increased by 2.3% is also shown in the table.

Screen Ireland

2026 REV Allocation

2.3% increase

5% Increase

10% Increase

15% Increase

20% Increase

€000

€000

€000

€000

€000

€000

Current

7,000

161

350

700

1,050

1,400

Capital

36,400

837

1,820

3,640

5,460

7,280

Commemorative Events

Questions (303)

Aengus Ó Snodaigh

Question:

303. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport his Department’s annual expenditure on commemorations for each of the past ten years. [46643/26]

View answer

Written answers

It should be noted that my Department was reconfigured as the Department of Culture, Communications and Sport in June 2025. Prior to this, responsibility for commemorations fell within predecessor Departments.

The total expenditure incurred by the Department and its predecessor bodies on commemorative programmes and initiatives from 2016 to date amounts to €60,534,443.18

The expenditure figures comprise both current and capital expenditure associated with the development and delivery of commemorative programmes and initiatives during the period concerned.

The expenditure incurred in each year for which figures are available is set out in the table below:

Current (€)

Capital (€)

Total (€)

2016

16,600,068.92

11,773,946.71

28,374,015.63

2017

1,159,355.43

4,550,748.06

5,710,103.49

2018

843,076.99

2,175.00

845,251.99

2019

1,099,998.34

318,158.00

1,418,156.34

2020

1,330,442.14

675,314.00

2,005,756.14

2021

4,002,297.42

1,162,173.00

5,164,470.42

2022

4,962,991.42

1,712,850.00

6,675,841.42

2023

5,000,000.00

1,677,684.18

6,677,684.18

2024

1,353,044.16

1,308,276.05

2,661,320.21

2025

1,000,630.58

1,212.78

1,001,843.36

2026

33,103.57*

Nil*

33,103.57*

To date*

Arts Funding

Questions (304)

Aengus Ó Snodaigh

Question:

304. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the estimated cost of increasing Culture Ireland funding and Arts Council funding by 5%, by 10%, by 15%, by 20%, and by the cost of inflation since Budget 2026, and the total additional expenditure which would be required for the Arts Council to meet the demand of 50% of applications and of all applications for funding by artists and arts organisations in 2025. [46644/26]

View answer

Written answers

Culture Ireland is a unit of my department with responsibility for the promotion of Irish arts internationally. In doing so, they work with international presenting partners and annually funded bodies to bring high quality Irish arts, across all artforms, to global audiences.

In 2026 Culture Ireland's allocation is €8.8m. The table below shows the impact of increases of 5%, 10%, 15% and 20% on this figure:

Increase

5%

10%

15%

20%

€440,000

€880,000

€1.32m

€1.76m

The Arts Council is the national agency for funding, developing and promoting the arts in Ireland. Under the Arts Act 2003, the Arts Council has primary responsibility for the development of the arts in Ireland and Budget 2026 has maintained the record funding of €140 million for the Arts Council from my Department. The table below shows the impact of increases of 5%, 10%, 15% and 20% on this figure:

Increase

5%

10%

15%

20%

€7m

€14m

€21m

€28m

The Central Statistics Office have a Consumer Price Index Inflation Calculator which can be used to "update" a sum of money and can be found at the following link; visual.cso.ie/?body=entity/cpicalculator. The latest CSO data is up to May 2026 and the percentage change from October 2025 (budget) to May 2026 is 2.3%. The table below shows the impact of this increase on both Culture Ireland and the Arts Council:

Agency

2.3% Increase

Culture Ireland

€202,400

The Arts Council

€3.22m

I have asked the Arts Council to make direct contact and provide the Deputy with further information in relation to the total additional expenditure which would be required for the Arts Council to meet the demand of 50% of applications and of all applications for funding by artists and arts organisations in 2025. Please contact my private office if you do not hear from the Council within the next ten working days.

Sports Funding

Questions (305)

Aengus Ó Snodaigh

Question:

305. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the annual capital expenditure for each of the past ten years on the Sports Capital and Equipment Programme; and the annual capital expenditure for each of the past ten years on arts or culture spaces and venues, in tabular form. [46645/26]

View answer

Written answers

Expenditure over the past 10 years for the Community Sports Facility Fund (CSFF) [formerly the Sports Capital and Equipment Programme], and Cultural Infrastructure and Development is set out in Tables 1 and 2 below.

Table 1: Community Sports Facility Fund (€), (formerly the Sports Capital and Equipment Programme), 2016 - 2025

Year

€

2025

70,516,470

2024

47,510,950

2023

52,855,291

2022

35,970,396

2021

21,596,679

2020

25,446,441

2019

30,937,995

2018

22,254,413

2017

19,879,353

2016

24,565,710

Table 2: Cultural Infrastructure and Development (€), 2016 - 2025

Year

€

2025

36,034,583

2024

27,516,178

2023

25,782,762

2022

24,588,206

2021

14,069,934

2020

22,455,401

2019

8,399,580

2018

7,448,755

2017

7,406,615

2016

13,552,744

Arts Policy

Questions (306)

Aengus Ó Snodaigh

Question:

306. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the estimated annual increased cost of expanding the basic income for the arts scheme to cover 1,000 additional recipients; to cover twice as many participants; to cover 50% of all eligible applicants; and to cover all eligible applicants. [46646/26]

View answer

Written answers

Basic income for the arts is currently paid at €325 per week. Please see an overview below:

Number of recipients

Cost per year (million €)

Cost for a 3-year cycle (million €)

1,000

18

54

2,000

35

105*

3,000

52

156

4,000

69

207

5,000

86

258

6,000

103

309

7,000

120

360

8,000

137

411

9,000

154

462

10,000

171

513

*cost of the pilot.

Please note that my Department is currently assessing applications for the new scheme. It is yet to be determined how many of the received applications are eligible.

Arts Funding

Questions (307)

Aengus Ó Snodaigh

Question:

307. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the estimated cost of expanding the after-hours funding strand for national cultural institutions on a phased basis over five years to allow for the extension of opening hours to 10pm. [46647/26]

View answer

Written answers

The potential expansion of opening hours for National Cultural Institutions is primarily a question for each National Cultural Institution itself, and decisions regarding opening hours cannot be made by my Department on their behalf.

The Night-Time Economy encompasses a broad range of social, cultural, and economic activities that occur between approximately 6pm and 6am. It is an important component in the development of towns and cities, playing a crucial role in economic growth, cultural vibrancy, social vitality, and urban regeneration. The Night-Time Economy pilots are a priority project for the Department to support the development of the Night-Time Economy in Ireland, and would be the main avenue of support, should later opening hours come into force in the Institutions.

For the purpose of giving an estimate based on a phased introduction of the change, it is assumed that the NCIs would remain open until 10PM on one day per week in 2026, two days per week in 2027, and so on. I would ask the Deputy to note that these figures may be affected by further increases in pay and other costs during the period in question.

The National Concert Hall and the Abbey Theatre already remain open to 10PM or later on numerous occasions during the year to facilitate the holding of concerts, plays and similar events.

The National Archives is also National Cultural Institution but is a functional division of my Department and the staff costs are borne from within my Department's overall allocation for pay.

It should be noted that there are numerous factors which can impact on the costs of extending the opening hours of a National Cultural Institution, including, for example, additional staff costs in the form of overtime payments or the necessity to increase overall staff numbers to maintain an equal level of service to evening visitors to a National Cultural Institutions. There are also additional non-pay costs that may be incurred as a result of longer opening hours, such as cleaning and maintenance, energy consumption, and other ancillary costs.

National Cultural Institution

2026

2027

2028

2029

2030

Total over 5 years

National Museum of Ireland

€6,564,641

€14,300,100

€22,740,396

€32,407,368

€43,345,390

€119,357,895

Crawford Art Gallery

The Crawford Art Gallery is closed for renovations and has been excluded from this exercise

Irish Museum of Modern Art

€209,253

€439,432

€692,106

€968,948

€1,271,745

€3,581,484

National Gallery of Ireland

€448,321

€916,058

€1,403,940

€1,912,716

€2,443,170

€7,124,205

Chester Beatty

Figures are not available at this time and will be provided to the Deputy directly

National Library of Ireland (staff & security)

€74,377

€153,218

€236,721

€325,096

€418,560

€1,207,972

Arts Funding

Questions (308)

Aengus Ó Snodaigh

Question:

308. Deputy Aengus Ó Snodaigh asked the Minister for Culture, Communications and Sport the estimated cost of relaunching the noise mitigation grant scheme at its previous rate; the estimated cost of increasing funding for the night-time economy grassroots venue support scheme by 5%, 10%, 15%, 20%, and by the cost of inflation since Budget 2026; and to cover the total number of applicants in 2025. [46648/26]

View answer

Written answers

The Noise Mitigation Grant Scheme (NMGS) was launched in 2023 with an allocation of €2m. The scheme was targeted at late night venues, such as nightclubs, late bars and late-night venues to implement noise emission mitigation measures to reduce noise emanating from late night entertainment associated with the premises. The scheme awarded 32 grants totalling just over €1.5m to late-night venues across the country.

There are no plans to relaunch the Noise Mitigation Capital Grant Scheme, however the Department was allocated €6m in Budget 2026 for a new programme of capital funding for arts and culture organisations across the country. This will see much needed capital supports for arts and culture organisations and support community and voluntary groups in increasing participation in arts and culture. The Department is in the process of designing the specifications of the scheme and it is hoped it will be launched in the coming weeks.

The Grassroots Venue Support Scheme was first launched in 2025 with an allocation of €500k and grants of up to €15,000 were awarded to 34 venues to host events showcasing the talent of emerging and grassroots artists.

The cost of increasing funding for the Night-Time Economy Grassroots Venue Support Scheme by 5%, 10%, 15%, 20%, and by the cost of inflation since Budget 2026 is listed below.

Allocation in 2025

5% increase

10% increase

15% increase

20% increase

3.6%* increase

€500,000

€525,000

€550,000

€575,000

€600,000

€518,000

*Cost of Inflation is based on figures released from the Central Statistics Office covering the period of March 2025 to March 2026

There were 45 eligible applications for the 2025 Grassroots Venue Support Scheme, which would have required a budget totalling €675,000.

Following the introduction of the support in 2025, increased funding of €1 million, double the level of last year, has been provided in 2026 to support grassroots live performance venues. I recently announced that 60 venues have been offered funding of up to €20,000 from the 2026 Scheme. This is an increase in funding and an increase from the 34 venues supported in 2025.