Skip to main content
Normal View

Thursday, 16 Jul 2026

Written Answers Nos. 614-625

EU Presidency

Questions (614)

Robert O'Donoghue

Question:

614. Deputy Robert O'Donoghue asked the Minister for Further and Higher Education, Research, Innovation and Science the number of EU Presidency policy and administrative officers now employed on temporary contracts across his Department, in Ireland and abroad; if these individuals can apply to internal civil service competitions for these temporary contracts; the plans being developed to retain these individuals once their contracts cease, given they will have extensive and intimate knowledge of EU and Irish institutional operations; and if he will make a statement on the matter. [54595/26]

View answer

Written answers

The Department of Further and Higher Education, Research, Innovation and Science currently employs three Presidency Policy Officers at its headquarters in Dublin on fixed-term contracts. These appointments were made to support the planning, preparation and delivery of Ireland's forthcoming Presidency of the Council of the European Union.

In relation to opportunities for permanent employment within the Department or the wider Civil Service, all appointments must be made in accordance with established Civil Service recruitment policies and procedures. Individuals seeking permanent positions are required to compete through open recruitment processes. Public Jobs is the principal recruitment service provider for the Department and the wider Civil Service. Details of open competitions are published on the Public Jobs website.

Climate Action Plan

Questions (615)

Pa Daly

Question:

615. Deputy Pa Daly asked the Minister for Further and Higher Education, Research, Innovation and Science the position regarding all actions in each of the Climate Action Plans 2021 to 2025 under the remit of his Department; to provide a breakdown of the legacy actions remaining, broken down by the year of the climate action plan they were initially included in; and the estimated timelines for completion, in tabular form. [54630/26]

View answer

Written answers

Four Climate Action Plans have been published since the introduction of the Climate Action and Low Carbon Development (Amendment) Act 2021 - Climate Action Plan 2021, Climate Action 2023, Climate Action 2024 and Climate Action Plan 2025.

My Department has successfully completed all agreed actions within its remit in Climate Action Plans 2021 - 2024. With regards to Climate Action Plan 2025, one legacy action remains to be completed by my Department and the table below illustrates the current position: -

Action

Year

Timeline for completion

Develop three new programmes in sustainable agriculture at QQI Levels 5 and 6.

2025

Q3/Q4 2026

My officials are working closely with SOLAS to complete this action with 3 QQI minor awards programmes currently progressing through validation. Subject to validation, delivery of all 3 courses is planned to commence in Q3/Q4 2026. The Deputy should note that a Climate Action Plan action is deemed complete by D/Taoiseach and not the lead Department.

My Department will continue to lead the response of the tertiary education sector to the requirements of the green transition, including through relevant high impact actions, as appropriate, in future iterations of Climate Action Plans.

Departmental Strategies

Questions (616)

William Aird

Question:

616. Deputy William Aird asked the Minister for Rural and Community Development and the Gaeltacht the progress made to date in implementing Embracing Ireland’s Outdoors: National Outdoor Recreation Strategy 2023–2027; the actions undertaken to support the development of outdoor recreation infrastructure, trails and amenities nationwide; the funding allocated to support delivery of the strategy; and if he will make a statement on the matter. [54556/26]

View answer

Written answers

Embracing Ireland’s Outdoors, the National Outdoor Recreation Strategy 2023 – 2027 was published in November 2022. This Strategy was developed in collaboration with Comhairle na Tuaithe and is a cross-Government, stakeholder-led strategy. The Strategy contains 95 agreed actions for implementation across a wide range of Government departments and agencies, to be delivered over the 5-year life span of the strategy. The implementation of the strategy is being jointly led by my department and Sport Ireland.

Progress in delivering the strategy is being monitored through a strategy oversight group and quarterly meetings of Comhairle na Tuaithe. The 1st and 2nd progress reports on the implementation of the strategy are available on my department’s website. The 3rd progress report which will cover the period of July 2025 to June 2026 will be published in the coming months.

As part of the strategy, new county structures that are being put in place to support outdoor recreation throughout each county. This includes the establishment of new County Outdoor Recreation Committees, Stakeholder Forums and the development of an Outdoor Recreation Plan in each county. These plans will guide the development of outdoor recreation over the next 5 years. My department is providing funding to support the development of these plans and, so far, 24 counties have commenced work on their plans. As part of the new county structure, County Outdoor Recreation Committees are also being established to deliver these plans.

Funding has also been provided for 6 County Outdoor Recreation Officer positions on a pilot basis for 3 years to co-ordinate the development and delivery of the county outdoor recreation plans in the selected counties. The pilot is currently being evaluated to consider if these positions should be rolled out further.

The Outdoor Recreation Infrastructure Scheme (ORIS), which is funded by my department, continues to be an important contributor to Embracing Ireland’s Outdoors. The scheme provides funding for the development and enhancement of outdoor recreational infrastructure such as walking trails, cycleways, blue ways, mountain access routes and open water facilities at rivers, lakes and beaches. Since the scheme was established, funding of almost €154 million has supported 2,060 outdoor amenities across the country. The level of funding provided in the estimates process for ORIS has increased from €12 million in 2021 to €17 million this year.

There continues to be significant investment in outdoor recreation facilities and infrastructure through other sources, including in our greenway network and the National Transport Authority's Active Travel Programme. Other examples include the development of the midlands trail network that is being supported through €30m of funding by the EU Just Transition Fund, as well as 19 accessible water sports facilities that are being supported by Fáilte Ireland through an investment of over €19m.

Another key action in the strategy was the commitment to expand the number of trails on my department’s Walks Scheme to 150. This is in recognition of the value of outdoor recreation amenities, not just for individual and community wellbeing, but also for the tourism impact these trails have on a local economy.

164 trails have now been approved in principle to join the Scheme, which exceeds the commitment in the strategy. To date, 138 of these trails have been fully brought onto the Scheme with 2,873 participant landowners now signed up. Work is ongoing to bring on the rest of the trails as soon as possible.

Stakeholder engagement and collaboration is essential to the delivery of the strategy. To support this my department, on behalf of Comhairle na Tuaithe, welcomed over 220 delegates from national and county organisations involved in the outdoor recreation sector to the third National Outdoor Recreation Conference in Co. Cavan on 25 June 2026. The conference is integral to the delivery of the strategy by providing opportunities to share best practice and inform policy implementation and development.

This is only a snapshot of some of the progress on the strategy to date. Progress on each action in the strategy will be reported on in the 3rd progress report which will be published in the coming months. My department, in conjunction with Sport Ireland, continues to implement the remaining strategy actions to address the challenges and opportunities of this exciting and growing sector.

In addition, my department recently commissioned an independent midterm review of the strategy to assess the impact of it to date and to inform the design of the next iteration of Embracing Ireland’s Outdoors. The review will be completed by the end of the year.

Broadband Infrastructure

Questions (617)

William Aird

Question:

617. Deputy William Aird asked the Minister for Rural and Community Development and the Gaeltacht the progress made in the delivery and expansion of the Broadband Connection Points initiative; the number of Broadband Connection Points currently operational in each county; the supports and thematic programmes being provided through these locations to improve digital skills, education, remote working and community connectivity; and if he will make a statement on the matter. [54557/26]

View answer

Written answers

Broadband Connection Points (BCP) were an initiative under the National Broadband Plan (NBP) in collaboration with the Department of Rural and Community Development and the Gaeltacht.

They provide high-speed broadband connectivity in some of the most isolated and rural communities throughout the country. 300 BCP's have been installed in publicly accessible buildings such as community centres, libraries, sports facilities, tourist locations and other public spaces. A breakdown by county is provided below.

My department has funded several projects in BCP's which demonstrate the opportunities that connectivity and remote delivery offers, and provide solutions to challenges or address gaps in service that have been identified by the Department, local authorities or other stakeholders. Projects in thematic areas such as Digital Skills and Education, Arts and Culture and Remote Working have been developed in partnership with key stakeholders and rolled out to suitable BCP's across the network.

BCP's by county:

COUNTY

BCP Count

CARLOW

7

CAVAN

13

CLARE

8

CORK

25

DONEGAL

12

DUB / DLR

1

DUB / FINGAL

7

DUB / SDCC

1

GALWAY

23

KERRY

10

KILDARE

3

KILKENNY

8

LAOIS

6

LEITRIM

12

LIMERICK

16

LONGFORD

9

LOUTH

9

MAYO

16

MEATH

16

MONAGHAN

17

OFFALY

10

ROSCOMMON

10

SLIGO

9

TIPPERARY

21

WATERFORD

4

WESTMEATH

8

WEXFORD

10

WICKLOW

9

Total

300

Rural Schemes

Questions (618)

William Aird

Question:

618. Deputy William Aird asked the Minister for Rural and Community Development and the Gaeltacht the progress made in delivering the LEADER programme 2023–2027; the level of funding allocated to date to support rural enterprise development, job creation, social inclusion and environmental projects; the steps being taken to ensure that communities in all regions can access and benefit from this funding; and if he will make a statement on the matter. [54558/26]

View answer

Written answers

The LEADER Programme is a key intervention of Our Rural Future, the Government’s national rural development policy development. It supports a broad range of activities which respond to the diversity of the local needs of our rural areas.

LEADER is co-funded by the EU and is delivered through Local Action Groups (LAGs) across rural Ireland. A feature of the LEADER programme is that it is based on a community-led, bottom-up approach to rural development.

The 2023-2027 LEADER programme has total funding of €180 million, with 75% or €135 million available to support projects being completed by rural groups and businesses.

Using this allocation, to date LEADER LAGs have approved funding of over €66 million for some 1,350 LEADER projects countrywide.

This includes:

• over €32 million approved for 625 projects under theme 1 of the programme covering Economic Development and Job Creation,

• some €26 million approved for 503 projects under theme 2 of the programme covering Rural Infrastructure & Social Inclusion, and,

• over €7.8 million approved for 228 projects under theme 3 of the programme covering Sustainable Development of the Rural Environment and Climate Change Mitigation and Adaptation.

Of these, 420 projects have been completed to date, with the remainder due to be be completed over the coming months and years.

The €180 million also includes €45 million (or 25%) which is available to support the administration and animation costs of the LAGs involved in running the programme. This allows LEADER LAGs to engage with local community groups and enterprises through a bottom up approach to identify, develop and deliver projects. This direct support in communities is a central feature of the LEADER programme and helps to ensure that projects are approved in all areas, including within hard to reach communities, allowing communities in all regions to access and benefit from LEADER funding.

Rural Schemes

Questions (619)

William Aird

Question:

619. Deputy William Aird asked the Minister for Rural and Community Development and the Gaeltacht the measures being taken to support the continued regeneration of rural towns and villages through the Town and Village Renewal Scheme; the number of projects approved in the current funding cycle; the criteria used to assess applications; and if he will make a statement on the matter. [54559/26]

View answer

Written answers

The Town and Village Renewal Scheme (TVRS) was introduced in 2016 and is one of a number of measures designed to rejuvenate rural towns and villages throughout Ireland. This is achieved through projects which support town centre resilience and regeneration, enhancement of our streetscapes, and the bringing of vacant and derelict buildings or lands back into use as multi-use community spaces.

TVRS is administered by local authorities, who work closely with local communities and businesses to develop proposals to respond to the needs of our rural towns and villages.

Since the launch of the scheme over €210 million has been allocated to over 1,900 projects. Funding is allocated based on project suitability against the scheme criteria, geographical spread, the quality of the proposed projects and the available budget. Details of all projects funded under the TVRS are available on my department's website.

The 2025 TVRS had three funding streams for project applications, the Building and Land Acquisition Measure (BLAM), the Main Scheme and the Project Development Measure (PDM). In August of 2025, funding of €6.73 was allocated to 33 acquisitions under BLAM. In December last, funding of €26.2 million was allocated to 116 projects under the Main Scheme and PDM.

In April 2026, I announced a new call for proposals under BLAM. Assessment of these applications is currently ongoing, and local authorities will be informed of the outcome of this process shortly.

TVRS priorities are reviewed and updated in advance of each Call for Proposals, and details of the next iteration of the Main Scheme and Project Development Measure are currently being developed, with a view to seeking further applications for funding later this year.

Rural Schemes

Questions (620)

William Aird

Question:

620. Deputy William Aird asked the Minister for Rural and Community Development and the Gaeltacht the progress made to date in allocating the €1 billion Rural Regeneration and Development Fund commitment under Project Ireland 2040; the total funding allocated, the number of projects supported, and the impact assessments undertaken in relation to the regeneration of rural towns and villages, addressing population decline and strengthening rural economies; and if he will make a statement on the matter. [54560/26]

View answer

Written answers

The Rural Regeneration and Development Fund (RRDF) is a major capital investment programme, which seeks to support large-scale, ambitious projects that can achieve sustainable economic and social development in rural areas. RRDF provides funding for the development and construction of capital projects in towns and villages in rural areas across Ireland.

Funding is allocated to local authorities and other State-funded bodies, who take the lead role in individual projects. To date, the RRDF has allocated over €610 million for 270 projects across Ireland, including over €11.8 million to nine projects in County Laois. Details of all projects approved for RRDF funding is available on my Department’s website.

A focused policy assessment of the RRDF was undertaken in co-operation with the Irish Government Economic and Evaluation Service (IGEES) and was published in December 2022. The findings and recommendations arising from this review, which are available on my Department’s website, were then used to develop the RRDF scheme parameters and the provision of wider supports from that point.

More broadly, the selection of individual projects for funding under the RRDF is by way of a competitive application basis and is a placed-based and demand-led Fund. This is reflected in the assessment criteria applied to each Call for Proposals. In consultation with those organisations delivering RRDF projects including our local authorities, these criteria are reviewed prior to each Call. This is to ensure that funding is targeted effectively to ensure RRDF projects will deliver vibrant and liveable town centres and ensure that rural towns, villages and communities can prosper in the years ahead. Examples of previous criteria under which applications have been assessed include the proposed projects’ social and economic impact, regenerative potential, financial sustainability, and policy coherence.

Once approved, ongoing monitoring and evaluation of the RRDF project outputs and outcomes takes place in the context of assessing the impact of the intervention. Each Lead Body is required to submit appropriate data to facilitate this process on an on-going basis and make this data available to my department.

I am committed to ensuring that the RRDF can continue to support high quality and transformational projects across rural Ireland in line with the objectives of Our Rural Future and the Town Centre First policy.

EU Presidency

Questions (621)

Robert O'Donoghue

Question:

621. Deputy Robert O'Donoghue asked the Minister for Rural and Community Development and the Gaeltacht the number of EU Presidency policy and administrative officers now employed on temporary contracts across his Department, in Ireland and abroad; if these individuals can apply to internal civil service competitions for these temporary contracts; the plans being developed to retain these individuals once their contracts cease, given they will have extensive and intimate knowledge of EU and Irish institutional operations; and if he will make a statement on the matter. [54600/26]

View answer

Written answers

My Department will host a range of events with an EU focus during the Presidency, encompassing various themes including rural and regional development, social inclusion and minority languages.

My Department currently has two employees who have moved to new temporary roles within the Department to carry out EU Presidency related work, one Administrative Officer and one Assistant Principal Officer. Both are existing permanent employees of this Department and will return to their previous roles following the EU Presidency.

My Department is also waiting for an additional bilingual Administrative Officer to be assigned to DRCDG to carry out EU Presidency related work. My Department currently has no staff based abroad as part of the EU Presidency.

Climate Action Plan

Questions (622)

Pa Daly

Question:

622. Deputy Pa Daly asked the Minister for Rural and Community Development and the Gaeltacht the position regarding all actions in each of the Climate Action Plans 2021 to 2025 under the remit of his Department; to provide a breakdown of the legacy actions remaining, broken down by the year of the climate action plan they were initially included in; and the estimated timelines for completion, in tabular form. [54635/26]

View answer

Written answers

Neither my Department nor the bodies under the aegis of my Department have any specific actions assigned to them under the Climate Action Plan. My Department is committed to meeting its obligations under the Public Sector Climate Action Mandate. Central to this is the development of my Department’s annual Climate Action Roadmaps, which are available at [DRCDG Climate Action Roadmap]. The most recent Roadmap was published in October 2025, and it includes information on both measures taken with regard to reduce energy use within Departmental buildings, and how the Departments programmes are, for example, helping to engage communities with regard to climate action.

My Department was formed in 2017, and on 1 June 2025, following a transfer of functions, responsibility for the Gaeltacht was also transferred to my Department. As a result, there are now eight bodies under the aegis of my Department; the Western Development Commission, the Charities Regulator, Pobal, Water Safety Ireland, Foras na Gaeilge, the Ulster-Scots Agency, Údarás na Gaeltachta and An Coimisinéir Teanga. I can confirm that all agencies are aware of the requirement to prepare Climate Action Roadmaps.

Community Development Projects

Questions (623)

Brendan Smith

Question:

623. Deputy Brendan Smith asked the Minister for Rural and Community Development and the Gaeltacht if consideration will be given to the allocation of additional funding for the local improvement scheme for Cavan and Monaghan in 2026, given the urgent need to reduce waiting times for such essential road improvement works; and if he will make a statement on the matter. [54675/26]

View answer

Written answers

The Local Improvement Scheme funds the upgrade of non-public rural roads and laneways, which are usually not maintained by local authorities. My Department reinstated the Scheme in 2017, and it currently serves as a central element of the overall Rural Development Investment Programme.

The LIS scheme remains highly popular nationwide and, since 2017, more than €201 million has been allocated to local authorities, resulting in over 5,500 roads being improved under this program.

I was pleased to launch the 2026 Local Improvement in February, supported by increased funding of €17.55 million. Cavan County Council was allocated €527,400 within this overall funding, and Monaghan County Council received €385,880.

While the Department provides funding, local authorities administer the scheme and are responsible for the selection and prioritisation of roads. This includes handling applications, scheduling works, and maintaining waiting lists. Local authorities decide if they work from existing lists or open the scheme to new applications each year.

My officials have engaged with local authorities, who have submitted their priority road lists for 2026. All eligible authorities have been authorised to proceed with LIS works.

My officials will closely monitor scheme spending to ensure that funding is fully utilised and that as many road improvements as possible are completed under the scheme this year. I will also seek to ensure, via the annual budgetary process, that this important scheme continues to be well funded in the years to come.

Community Development Projects

Questions (624)

Colm Burke

Question:

624. Deputy Colm Burke asked the Minister for Rural and Community Development and the Gaeltacht if the €20 million fund to support outdoor recreation in rural areas is open to communities under the authority of city councils; if not, when similar funds that will be made available; and if he will make a statement on the matter. [54691/26]

View answer

Written answers

The Outdoor Recreation Infrastructure Scheme (ORIS) provides funding under several measures for the development of new outdoor recreational infrastructure and for the necessary repair, enhancement or promotion of existing outdoor recreation infrastructure in countryside areas across Ireland. This includes walking trails, cycleways, mountain access routes and facilities at rivers, lakes and beaches.

While the funding is for countryside areas, funding is also available for projects in towns that connect with significant outdoor recreation facilities such as a greenway or forest trail. Projects located within any of the five main city boundaries are not eligible under the scheme. I have no plans to expand the scheme into city areas at this time.

Details of ORIS and funded projects can be found on my Department's website.

Community Development Projects

Questions (625)

Colm Burke

Question:

625. Deputy Colm Burke asked the Minister for Rural and Community Development and the Gaeltacht the supports outside of the CCIF that are available to community groups under the authority of city councils who wish to build new community facilities rather than refurbish existing ones; and if he will make a statement on the matter. [54692/26]

View answer

Written answers

I am acutely aware of the importance of community infrastructure across the country.

While my department has a number of supports that are available to support the development of community facilities, many of these are targeted towards rural areas. These include the LEADER programme, the Rural Regeneration and Development Fund, the Town and Village Renewal Scheme, CLÁR, and the Outdoor Rural Infrastructure Scheme.

The programmes that are available to community groups under the authority of city councils are:

• as referenced by the Deputy, the Community Centre Investment Fund was introduced to provide high quality, accessible, community spaces that are available to all groups in all communities in both rural and urban areas. Some €112 million has been allocated since 2022 under that programme.

• The SÍOL Programme 2026 was launched on 8 July and will provide funding of €5 million to support eligible projects that develop community facilities and amenities in the 15 areas designated for inclusion in the programme. This includes 4 areas in Dublin city and suburbs, 2 areas in Cork City and one area in each of Limerick City, Galway City and Waterford City.

In addition to the above schemes, it is also of note that under the Town Centre First policy, funding is available to local authorities to support larger and more urban settlements through schemes provided by the Department for Housing, Local Government and Heritage. This includes the Thrive scheme and the Towns and Cities Regeneration Investment Fund.

Full details of all funding programmes administered by my department, are available on my department’s website.

Share