Skip to main content
Normal View

Tuesday, 19 May 2026

Written Answers Nos. 405-424

Departmental Schemes

Questions (405)

Erin McGreehan

Question:

405. Deputy Erin McGreehan asked the Tánaiste and Minister for Finance if applications to the disabled drivers and disabled passengers scheme will continue to be accepted and processed in full pending the introduction of the new grant-based vehicle adaptation scheme; if any interim changes will be made to the existing scheme, including to the eligibility criteria for the primary medical certificate; and when the report prepared under the National Disability Inclusion Strategy on reform of vehicle adaptation supports will be published. [37551/26]

View answer

Written answers

The Deputy should note that my Department and I share concerns that the Disabled Drivers and Disabled Passengers Scheme or DDS is no longer fit-for-purpose and believe it should be replaced with a needs-based, grant-led approach for necessary vehicle adaptations that could serve to improve the functional mobility of the individual.

Under the aegis of the Department of the Taoiseach, the sub-group convened to progress the National Disability Inclusion Strategy proposals for a needs-based, grant-aided, modern vehicle adaptation supports to replace the DDS, generated a report that was submitted to the Department of the Taoiseach. In considering this report, it has been proposed that a new grant-based scheme be developed and led by the Department of Transport. The NDIS Report was published in February 2023.

The Department of Transport is beginning the development of this new scheme. The existing DDS remains with the Department of Finance and will continue to be reviewed in the context of new scheme developments by the Department of Transport.

As the Deputy will be aware, when this government took office, we committed to a step change in the delivery of supports and services for people with disability and their families.

Budget 2026 is the first step in delivering on this ambition, providing some €3.83 billion to specialist disability services next year, an unprecedented increase of €618 million, or almost 20%.

This funding will be vital in delivering the National Human Rights Strategy for Disabled People. The commitment to develop a new scheme by the Department of Transport, and in this context review the Disabled Drivers and Disabled Passengers Scheme, are strong commitments in this strategy.

Tax Data

Questions (406)

Shane Moynihan

Question:

406. Deputy Shane Moynihan asked the Tánaiste and Minister for Finance his views on the application of a 0% VAT rate to laptops and tablets required for educational purposes; if he has engaged with the European Commission regarding the possibility of same; and if he will make a statement on the matter. [37609/26]

View answer

Written answers

As the Deputy may be aware, the EU VAT Directive, which Irish VAT law must comply, generally holds that all goods and services are liable for VAT at the standard rate for which Member States of the EU must set at a minimum of 15%.

If a good or service is included in a list of categories of goods and services under Annex III of the Directive, a reduced or zero rate may be applied. The supply of laptops and tablets are not included under Annex III and therefore cannot be charged below the standard rate.

The VAT Directive does provide for an exemption for, inter alia, the provision of children's or young people's education, school or university education, vocational training or retraining, However this exemption cannot be applied to the supply of laptops and tablets for educational purposes.

Any changes to the VAT Directive would require an amendment to be proposed by the European Commission which would then have to be agreed unanimously by all EU Member States. The last change to Annex III of the Directive was in 2022 and was the result of four years of negotiations. No further changes to VAT rates are anticipated at this time.

Departmental Data

Questions (407)

Claire Kerrane

Question:

407. Deputy Claire Kerrane asked the Tánaiste and Minister for Finance if his attention has been drawn to a new proposal from an organisation (details supplied); his response to same; if it will be considered ahead of Budget 2027; and if he will make a statement on the matter. [37676/26]

View answer

Written answers

My Department receives pre-Budget submissions from a wide range of stakeholders in advance of each Budget and all are given consideration as part of the annual policy cycle. The Deputy’s question refers to a proposal for a payable tax credit for pubs, linked to the number of draught product kegs purchased by the business, subject to a cap.

Proposals for new tax expenditures are examined by reference to my Department’s Tax Expenditure Guidelines, which outline the Government’s approach to when tax expenditures are best used, noting that these narrow the tax base, and how they should be evaluated.

In the case of a proposal for a targeted tax incentive, such as the one referred to by the Deputy, consideration of European State aid approval would also be required.

There are a number of existing tax supports available to all businesses, including the on-trade. These are intended to encourage investment in the economy and in particular in indigenous SMEs. These measures provided for by Part 16 of the Taxes Consolidation Act 1997 (TCA) include the Employment Investment Incentive (EII) the Start-Up Relief for Entrepreneurs (SURE) and the Start-Up Capital Investment (SCI).

It is worth noting that there has been no general increase in excise duty rates for alcohol since in 2014. While the retail price of beer has risen over that period, the excise duty has remained unchanged and, therefore, the total tax as a percentage of the retail price of each pint is now lower than it was more than a decade ago.

A range of direct expenditure supports are also available to businesses, and details can be found on the National Enterprise Hub at www.neh.gov.ie.

Notwithstanding the above, the matters raised in the submission will continue to inform ongoing policy considerations in the context of the budgetary process.

Departmental Inquiries

Questions (408)

Pearse Doherty

Question:

408. Deputy Pearse Doherty asked the Tánaiste and Minister for Finance if his predecessor met with a person (details supplied) in 2025; if so, if this was recorded on the lobby register; and if he will make a statement on the matter. [37733/26]

View answer

Written answers

The former Minister for Finance Paschal Donohoe met with the person that the Deputy has asked about on 3 April 2025. The Department of Finance is not responsible for recording the meeting on the lobbying register; this obligation falls to the lobbying party.

Departmental Programmes

Questions (409)

Barry Ward

Question:

409. Deputy Barry Ward asked the Tánaiste and Minister for Finance the position of the Government regarding the proposed AgoraEU programme within negotiations on the European Union Multiannual Financial Framework 2028–2034; whether Ireland supports an increase in the overall budget allocation proposed for AgoraEU by the European Parliament; whether Ireland has made submissions or representations within the Council of the European Union or the ad hoc Working Party on the Multiannual Financial Framework in relation to the programme; and if he will make a statement on the matter. [37753/26]

View answer

Written answers

The Department of Finance and the Department of Foreign Affairs and Trade jointly coordinate Ireland's overarching positions on the proposed EU Multiannual Framework 2028-2034 (MFF). The Government’s key priorities for the next Multiannual Financial Framework (MFF) include but are not limited to a strong Common Agricultural Policy and Common Fisheries Policy; continued support for the PEACE PLUS programme in Northern Ireland and the border counties of Ireland; funding for competitiveness and excellent research; sustained support for Ukraine; continued development and humanitarian assistance; and a revenue system that is fair, equitable, simple and transparent, primarily based on Gross National Income.

As regards AgoraEU specifically, Ireland, led by the Department of Culture, Communications and Sport (DCCS), has been closely engaged in negotiations in the Council of the European Union, at Council and working party levels, on the Commission’s proposal for a Regulation establishing the AgoraEU programme.

In general, Ireland has welcomed the proposal for AgoraEU, in particular that culture, media and civil society actions will retain their status as part of standalone programmes under the next MFF, and that funding will be allocated to the sectors on a competitive basis. More broadly, Ireland considers that programmes under the next MFF should continue to contribute towards sustaining and further developing rights-based, democratic, equal and inclusive societies.

The Education, Youth, Culture and Sport (EYCS) Council agreed a partial general approach on the proposed Regulation at its most recent meeting on 12 May 2026, which Ireland supported.

Negotiations on budgetary allocations are expected to intensify as the year progresses, including under Ireland's Presidency of the Council of the EU in the second half of 2026. As Presidency, Ireland will act as an honest broker and lead negotiations in a manner that protects the interests of the EU.

Insurance Industry

Questions (410)

Seamus Healy

Question:

410. Deputy Seamus Healy asked the Tánaiste and Minister for Finance if he will stop insurance companies loading house insurance premiums for homes in areas which have never flooded and areas which are now protected by flood defences; and if he will make a statement on the matter. [37777/26]

View answer

Written answers

The Government recognises that the cost of flood insurance can be challenging for affected households. Insurance companies operate independently when determining the availability and pricing of their products, and neither I, as Tánaiste and Minister for Finance, nor the Central Bank of Ireland has the legal authority to compel insurers to offer cover for specific risks. These restrictions derive from the EU’s Solvency II Directive, which expressly prevents Member States from intervening in insurers’ pricing or underwriting decisions. The most recent CSO Consumer Price Index data from April 2026 shows that the cost of home insurance has decreased by almost 3% in the past year.

Insurers rely on their own claims’ histories, risk assessments, and cost projections when deciding whether to provide cover. Factors such as inflation in building materials and labour are also influencing premium levels across the sector.

However, the Government is taking a comprehensive and proactive approach to improving competition in the Irish insurance sector, through the efforts of the Office for the Promotion of Competition in the Insurance Market (OPCIM). The OPCIM continues to prioritise increased competition and capacity across the insurance sector and plays a key role in engaging with insurers, brokers, and a wide range of sectoral representatives to address gaps in insurance availability and encourage new market entrants.

A total of €1.3 billion has been committed to the delivery of flood relief schemes over the lifetime of the National Development Plan (NDP) to 2030. This will protect approximately 23,000 properties across various communities from river and coastal flood risk.

The Action Plan for Insurance Reform 2025-2029 also includes 4 specific actions on flood and climate protection. With respect to Action 17 of the Action Plan, the Department of Finance is currently engaging with multiple stakeholders on the development of a long-term strategic approach to the provision of flood insurance, to consider potential solutions, specific to Ireland, to increase the availability and affordability of flood insurance. This work will build on the extensive research undertaken by the Central Bank of Ireland into the nature and scale of the Flood Protection Gap in Ireland, which identified that approximately 5% of buildings in Ireland that have limited access to flood insurance.

Where Government has invested in flood defences, the expectation is that industry should improve the level of cover in areas where completed flood defences exist. In order to address the issue of flood coverage levels in areas with demountable defences, continued engagement with all relevant stakeholders is key. Officials in my Department, the OPW, and the Department of Housing, Local Government and Heritage, along with other stakeholders, engage constructively with this process on how the levels of insurance cover might be improved in areas where flood defence works have been completed.

Homeowners having difficulty obtaining insurance, flood or otherwise, should note that assistance is available through Insurance Ireland’s Information Service and Brokers Ireland. Brokers Ireland has access to a wide range of providers and products and offers advice for customers in sourcing various types of cover. Additionally, Insurance Ireland operate an Insurance Information Service for those who have queries, complaints, or difficulties in relation to obtaining insurance.

The Government is firmly committed to addressing the cost and availability of insurance, including home insurance, through its insurance reform agenda and will continue to engage with industry to encourage a responsive approach.

An Garda Síochána

Questions (411, 412)

Natasha Newsome Drennan

Question:

411. Deputy Natasha Newsome Drennan asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the number of kennels built on private dwellings for canines used in canine units of An Garda Síochána, the Irish Prison Service and the Revenue Commissioners since 2020; and if he will make a statement on the matter. [37143/26]

View answer

Natasha Newsome Drennan

Question:

412. Deputy Natasha Newsome Drennan asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the cost of building kennels on private dwellings for canines used in Canine Units of An Garda Síochána, the Irish Prison Service and the Revenue Commissioners since 2020; and if he will make a statement on the matter. [37144/26]

View answer

Written answers

I propose to take Questions Nos. 411 and 412 together.

The OPW can confirm that works were requested by An Garda Síochána and the Revenue Commissioners, relating to building kennels at private dwellings for canines used in their respective Canine Units.

From 2020 to 2023 the OPW carried out works to the value of €109,932 (incl VAT) at 5 private locations throughout the country.

Since 2023, the OPW are no longer involved in installing dog kennels in private residences.

Question No. 412 answered with Question No. 411.

An Garda Síochána

Questions (413)

Robert O'Donoghue

Question:

413. Deputy Robert O'Donoghue asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the nature of refurbishment works that the OPW carried out at Balbriggan Garda station in the years of 2025 and to-date in 2026, in tabular form; and if he will make a statement on the matter. [36613/26]

View answer

Written answers

The Office of Public Works (OPW) can confirm that there were no refurbishment works carried out at Balbriggan Garda Station, County Dublin, in 2025, or, to date in 2026.

An Garda Síochána

Questions (414, 415, 416, 417, 418, 419, 420, 423, 424, 425)

Ken O'Flynn

Question:

414. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether a nationally defined custodial window performance standard exists for Garda detention-cell environments used in Garda station capital projects delivered by the Office of Public Works; and if he will provide details of the standards, testing methodologies, certification requirements and equivalence criteria applied. [36629/26]

View answer

Ken O'Flynn

Question:

415. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether custodial window assemblies installed in Garda detention-cell environments are assessed and certified on a full system-performance basis, including deliberate attack resistance, anti-ligature performance, containment capability, ventilation safety, fire performance and detention suitability; and if he will make a statement on the matter. [36630/26]

View answer

Ken O'Flynn

Question:

416. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the standards, technical guidance documents and certification frameworks relied upon by the Office of Public Works in assessing custodial window systems for Garda detention environments; and if he will make a statement on the matter. [36631/26]

View answer

Ken O'Flynn

Question:

417. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether standards primarily designed for curtain walling, façade impact assessment or general construction products, including EN 14019 or related harmonised standards, are relied upon in the assessment or acceptance of custodial cell window assemblies within Garda station projects; and if he will make a statement on the matter. [36632/26]

View answer

Ken O'Flynn

Question:

418. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether the Office of Public Works maintains a formal equivalence-assessment framework governing substitution or alternative proposals for custodial window assemblies in Garda detention environments; and if he will provide details of the evidential requirements applied. [36633/26]

View answer

Ken O'Flynn

Question:

419. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation the number of Garda station projects since 2010 involving installation, replacement or refurbishment of custodial cell window systems under Office of Public Works management; the total associated capital expenditure; and whether remedial or corrective works have subsequently been required in any such projects. [36634/26]

View answer

Ken O'Flynn

Question:

420. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether any internal review, engineering assessment, protected disclosure process or external examination is ongoing concerning custodial window assemblies installed in Garda station projects delivered by the Office of Public Works; and if he will make a statement on the matter. [36635/26]

View answer

Ken O'Flynn

Question:

423. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether the Office of Public Works maintains a central register of custodial security systems and associated certification documentation used within Garda detention-cell environments nationwide; and if he will make a statement on the matter. [36638/26]

View answer

Ken O'Flynn

Question:

424. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether the Office of Public Works has carried out any review of the long-term maintenance, replacement or remedial liability exposure associated with custodial window systems installed in Garda station projects; and if he will make a statement on the matter. [36639/26]

View answer

Ken O'Flynn

Question:

425. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether any Garda station projects currently under construction or active delivery contain custodial window assemblies subject to ongoing technical review, dispute, assessment or protected disclosure processes; and if he will make a statement on the matter. [36640/26]

View answer

Written answers

I propose to take Questions Nos. 414, 415, 416, 417, 418, 419, 420, 423, 424 and 425 together.

There are no Garda Station projects which are currently under construction or active delivery and which contain custodial window assemblies which are currently subject to ongoing technical review, dispute, or assessment.

Protected Disclosures are subject to specific processes, bound by confidentiality; therefore, it is not appropriate to provide any comment in relation to this.

The custodial window assemblies used in Garda station capital projects delivered by the Office of Public Works meet the requirement for impact performance in accordance with the standard ‘EN14019’, and specific anti-ligature performance, ventilation safety and fire performance standards.

Custodial window assemblies comprise a composite of three individual elements; glass block, concrete, and laminate. Each of the three elements can vary when compared with each other. Combined, these elements comply with the standard EN 14019. Currently there are two approved suppliers. Each of the two approved suppliers have provided all relevant technical submissions, along with detailed methodology for the manufacture and installation of their windows.

The Office of Public Works has undertaken general detention area upgrades in Garda stations over the last number of years. The aim of this programme of works is to meet contemporary standards of prisoner care by upgrading heating, ventilation, cell doors and ablution facilities. In many instances, the Garda stations within this programme date back to the nineteenth century and so in some cases old custodial window assemblies have been upgraded.

In 2016, the Office of Public Works carried out a comprehensive technical review in respect of custodial window assemblies. There is no current internal review, engineering assessment, or external examination ongoing concerning custodial window assemblies installed in Garda station projects delivered by the Office of Public Works.

All relevant certification documentation and associated information is included within the Safety File of each project.

As a Contracting Authority, the Office of Public Works carries out a continuous programme of maintenance work in Garda Stations on behalf of An Garda Síochána. The Office of Public Works has not carried out any specific review of the long-term maintenance, replacement or remedial liability exposure associated with custodial window systems installed in Garda station projects.

Question No. 415 answered with Question No. 414.
Question No. 416 answered with Question No. 414.
Question No. 417 answered with Question No. 414.
Question No. 418 answered with Question No. 414.
Question No. 419 answered with Question No. 414.
Question No. 420 answered with Question No. 414.

An Garda Síochána

Questions (421, 422)

Ken O'Flynn

Question:

421. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether An Garda Síochána maintains operational, technical or safety standards governing detention-cell window systems used within Garda custody environments; and if so, to provide details of the standards and assessment procedures applied. [36636/26]

View answer

Ken O'Flynn

Question:

422. Deputy Ken O'Flynn asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation whether An Garda Síochána has raised any operational, safety, ligature-risk, containment or fire-performance concerns regarding custodial window assemblies installed within Garda detention facilities since 2010; and if he will make a statement on the matter. [36637/26]

View answer

Written answers

I propose to take Questions Nos. 421 and 422 together.

As Contracting Authority, the Office of Public Works specifies all technical detail in relation to custodial window assemblies for installation in Garda Stations. These works requirements form part of the tendering and subsequent contract award process, with the successful contractor being responsible for ensuring that the works are completed, as specified.

The custodial window assemblies used in Garda station capital projects delivered by the Office of Public Works meet the requirement for impact performance in accordance with the standard ‘EN14019’, and specific anti-ligature performance, ventilation safety and fire performance standards.

Once works are complete, all relevant technical information is included in the project Safety File. The Safety File is a record of information for the end user, which focuses on safety and health.

An Garda Síochána has not raised any operational, safety, ligature-risk, containment or fire-performance concerns with the Office of Public Works regarding custodial window assemblies installed within Garda detention facilities since 2010.

Question No. 422 answered with Question No. 421.
Question No. 423 answered with Question No. 414.
Question No. 424 answered with Question No. 414.
Share