Ports Policy

Dáil Éireann Debate, Tuesday - 27 January 2026

Tuesday, 27 January 2026

Questions (272)

Malcolm Byrne

Question:

272. Deputy Malcolm Byrne asked the Minister for Transport to provide an update on the development of facilities for the offshore renewable sector at Irish ports. [6160/26]

View answer

Written answers

My department is committed to facilitating the development of port facilities to enable Offshore Renewable Energy (ORE) development from Irish ports. Developers currently have 3.8GW of ORE capacity currently in the planning system. The Irish ports are in prime position to enable the construction of these Offshore Wind Farms once developers begin to require the use of port facilities for the Marshalling and Assembly (M&A) phase of construction. The ports can also be ready to service the projects from an Operations and Maintenance (O&M) perspective.

In 2021, my department published a policy statement on the facilitation of ORE by Commercial State ports in recognition of the need for additional port capacity to service the ORE industry. The policy statement endorses a multiport approach as the most optimal policy, facilitating a strong response from the ports sector and private entities within ports.

My department has actively encouraged the Commercial State ports to consider the commercial opportunities associated with ORE. To this end, the ports have made significant progress developing ORE-based port projects to a mature stage.

In this regard, the Port of Cork is progressing the construction of the multi-modal berth 'CORE 1' at Ringaskiddy East. The berth represents Phase One of a multi-phase development planned at Ringaskiddy. The development consists of a single berth with depth of 13m, quay length of 200m, laydown/quayside area and a new storage yard.

Having received renewed planning permission in December 2025, the Port of Cork is exploring plans to progress the construction of the second berth at Ringaskiddy.

The Ringaskiddy development presently under construction will be the first port in Ireland with a facility for ORE deployment and will allow the port to facilitate Marshalling and Assembly (M&A) in time for the phase 1 ORE projects in Irish waters. The facility will also be well placed to service future development projects which will come from the South Coast Designated Marine Area Plan (DMAP).

In 2025, Rosslare Europort and the Port of Waterford Company both received Maritime Area Consents (MACs) for their planned projects and both have taken the critical step of submitting planning applications to An Coimisiún Pleanála (ACP). Each of these ports are also well placed to support Phase One ORE projects as well as the South Coast DMAP projects.

Rosslare Europort specifically has plans to develop:

• Two ORE purpose-built quays and berth of at least 200m length,

• A 20 ha (200,000m2) reclamation area for ORE quayside storage and preconstruction, and

• Capital dredging will be conducted on the fairway approaches to Rosslare Europort, increasing the depth to 10m.

It is envisaged by Rosslare Europort that construction could commence in 2027 with a two-year construction period. These dates are subject to a final grant of planning permission and confirmation of finance.

Port of Waterford specifically has plans to develop:

• A 250-metre extension to the existing wharves at Belview,

• extensive land reclamation, new quayside operator support facilities with workshops and warehouses, and

• berthing pontoons, and two separate three-storey office and staff buildings for ORE operators.

Furthermore, Shannon Foynes Port Company (SFPC) has submitted a maritime area consent (MAC) application to the Maritime Area Regulatory Authority for their large-scale development at Foynes Island in 2025. The port is planning to service the development of the future floating industry on Ireland’s West Coast. Shannon Foynes is also stepping up international collaboration, creating the first global Floating Offshore Wind (FLOW) Alliance with Port Talbot and the Port of Brest.

Certain local authority-owned ports also envisage a role in the ORE industry. The Department is aware of plans by:

• The Port of Galway and

• Drogheda Port Company (in collaboration with Ronan Group for the Bremore Port Project).

My Department is aware that ESB has plans to develop their power station at Moneypoint in the Shannon Estuary to service Floating Offshore Wind.

My Department is also aware that the following privately-owned ports are planning port projects to enable ORE development, including:

• Greenore Port, owned by Doyle Shipping Group, based in County Louth,

• Leahill Quarry Port in Bantry Bay, and

• Bremore Port project (a collaboration between Drogheda Port Company and Ronan Group).