Aodhán Ó Ríordáin
Ceist:327. Deputy Aodhán Ó Ríordáin asked the Minister for Education when funding for a school (details supplied) will be approved. [40129/23]
Amharc ar fhreagraDáil Éireann Debate, Wednesday - 20 September 2023
327. Deputy Aodhán Ó Ríordáin asked the Minister for Education when funding for a school (details supplied) will be approved. [40129/23]
Amharc ar fhreagraThe application referred to has been examined by the Department's Professional & Technical team.
As full roof replacements are not funded under the Emergency Works Scheme, the school are being requested to appoint a leak detection specialist to identify the leaks within the existing roof.
Following this examination, the school must submit a revised Itemised Cost Breakdown (ICB) and a leak detection test report including results. The ICB must set out a complete breakdown of costs. No lump sums are acceptable.
Itemised Cost Breakdown of proposed work s to address the Emergency
|
Item |
Description |
Quantity |
Unit |
Rate |
Total € |
|
1 |
|||||
|
2 |
|||||
|
3 |
|||||
|
4 |
|||||
|
5 |
|||||
|
6 |
|||||
|
7 |
|||||
|
8 |
|||||
|
9 |
|||||
|
10 |
|||||
|
11 |
|||||
|
12 |
|||||
|
13 |
|||||
|
14 |
|||||
|
15 |
|||||
|
Construction Sub Total |
|||||
|
VAT @ 13.5% |
|||||
|
Total Construction Cost |
|||||
|
Professional Fees |
|||||
|
VAT @ 23% |
|||||
|
Total Professional Fees |
|||||
|
Overall Total (Construction & Fees) |