Written Answers Nos. 286-305

Road Projects

Ceisteanna (286)

Brendan Griffin

Ceist:

286. Deputy Brendan Griffin asked the Minister for Transport to provide a record of all specific grant applications from Kerry County Council to his Department for any works in respect of a bridge in Kerry (details supplied) in the past five years; to provide a record of all funding granted in that period in respect of the bridge; to provide a record of all funding drawn down in respect of the bridge; to provide the most recent correspondence between his Department and Kerry County Council; the precise stage the project is at; and if he will make a statement on the matter. [35421/24]

Amharc ar fhreagra

Freagraí scríofa

In accordance with the provisions of Section 13 of the Roads Act 1993, each local authority has statutory responsibility for the improvement and maintenance of their regional and local roads. Works on those roads are funded from local authorities' own resources and are supplemented by State Road grants. Of these grants, the vast majority (approximately 90%) are targeted at the maintenance and renewal of the network with c. 10% of the remaining funding invested in new roads/bridges or for road realignments.

Any new road projects that seek funding are assessed by the Department on a case-by-case basis. Kerry County Council have a number of new roads projects in construction and planning.  All projects proposed by local authorities for consideration must comply with the requirements of the Infrastructure Guidelines (formerly the Public Spending Code) and the Department's Transport Appraisal Framework. Given the limited funding available for regional and local road improvement works it is important for local authorities to prioritise projects within their overall area of responsibility with these requirements in mind.

In this regard, it is my understanding that Kerry County Council are currently examining options for Listry Bridge, considering the needs and objectives, and deciding how best to progress to ensure value for money within existing budgets. 

Please see below table with the requested records of funds.

 -

2019

2020

2021

2022

2023

2024

Allocation

 € 200,000.00

 € 80,000.00

 € 30,000.00

 € 50,000.00

 € 75,000.00

 € 30,000.00

Expenditure

 € 20,603.00

 €             -  

€                -  

 €                -  

€                -  

 € 422.00 to date

Road Projects

Ceisteanna (287)

Michael Healy-Rae

Ceist:

287. Deputy Michael Healy-Rae asked the Minister for Transport the reason there is no funding available for the N70 road from Sneem to Blackwater Bridge (details supplied); and if he will make a statement on the matter. [35424/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Once funding arrangements have been put in place with Transport Infrastructure Ireland (TII), under the Roads Acts 1993-2015, and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for TII, in conjunction with the local authorities concerned. TII ultimately delivers the National Roads Programme in line with Project Ireland 2040, the National Planning Framework and the NDP. 

In the new National Development Plan launched in October 2021, approximately €5.1 billion is earmarked for new national road projects to 2030. This funding will enable improved regional accessibility across the country as well as compact growth, which are key National Strategic Outcomes. The funding will provide for the development of numerous national road projects, including the completion of projects which are already at construction stage and those close to it, as well as the development of a number of others.   

As the greater portion of this funding becomes available in the second half of the decade, this means that there is a constraint on the funding available for new projects this year – however many national road projects will continue to be progressed in 2024.  

The N70 Blackwater Bridge to Sneem project did not receive an allocation in 2024, however, the delivery programme for this project will be kept under review for funding in future years and considered in terms of the overall funding envelope available to TII.

Rail Network

Ceisteanna (288)

Seán Fleming

Ceist:

288. Deputy Sean Fleming asked the Minister for Transport when a Leap card facility will be available at a train station (details supplied); the future plans, in view of the growing rail traffic at this location; and if he will make a statement on the matter. [35426/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport.  The National Transport Authority (NTA) has responsibility for the provision of integrated ticketing and information systems for public transport, including the Leap card.

Given the NTA's responsibility in the matter, I have referred the Deputy's question to the NTA for a direct reply. Please contact my private office if you do not receive a reply within 10 days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Traffic Management

Ceisteanna (289)

Brendan Griffin

Ceist:

289. Deputy Brendan Griffin asked the Minister for Transport if Transport Infrastructure Ireland will provide funding on safety grounds to progress a traffic calming measures outside a school in County Kerry (details supplied); and if he will make a statement on the matter. [35443/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Under the Roads Acts 1993-2015 and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals. In this context, TII is best placed to advise you.

Noting the above position, I have referred your question to TII for a direct reply.  Please advise my private office if you do not receive a reply within 10 working days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Bus Services

Ceisteanna (290)

Brendan Griffin

Ceist:

290. Deputy Brendan Griffin asked the Minister for Transport if the National Transport Authority will provide funding for a bus shelter at a location in County Kerry (details supplied); and if he will make a statement on the matter. [35457/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport. The National Transport Authority (NTA) has responsibility for the planning and development of public transport infrastructure, including the provision of bus stops/shelters nationally.

Noting the NTA's responsibility in the matter, I have referred the Deputy's question to the NTA for a direct reply. Please contact my private office if you do not receive a reply within 10 days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Active Travel

Ceisteanna (291)

Paul McAuliffe

Ceist:

291. Deputy Paul McAuliffe asked the Minister for Transport the total funding allocation made by his Department for active travel projects to Dublin City Council since 2020. [35460/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to Active Travel. Funding is administered through the National Transport Authority (NTA), who, in partnership with local authorities, have responsibility for the selection and development of specific projects in each local authority area.

Noting the role of the NTA in the matter, I have referred your question to that agency for a more detailed answer. If you do not receive a reply within 10 working days, please contact my private office.

A referred reply was forwarded to the Deputy under Standing Order 51.

Transport Costs

Ceisteanna (292)

Paul McAuliffe

Ceist:

292. Deputy Paul McAuliffe asked the Minister for Transport his plans to address the cost of travel for students and young adults; and the number of student Leap cards issued since 2019, in tabular form. [35461/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport. However, I am not involved in the day-to-day operations of public transport. The National Transport Authority (NTA) has responsibility for the regulation of fares charged to passengers in respect of public transport services provided under public service obligation (PSO) contracts. 

As the Deputy will be aware, the Young Adult Card was launched on PSO services on the 9th of May 2022, and was extended to participating commercial services in September 2022. The YAC provides young adults aged 19-23, and full-time third students aged 16 and upwards with a 50% discounted fare on such services. A further 20% average fare reduction on PSO services was introduced in 2022 as part of a suite of Government measures to help combat the rising cost of living. Funding was provided under Budget 2023 for the continuation of both of these fare initiatives

I am pleased to advise that under Budget 2024 I secured the continuation of the 20% average fare reduction on PSO services, and for an extension of the upper limit of the YAC from 23 to 25 years of age. 

In light of the NTA's responsibility in this area, I have forwarded the Deputy's request to the NTA for direct reply. Please advise my private office if you do not receive a response within ten working days.

Electric Vehicles

Ceisteanna (293)

Paul McAuliffe

Ceist:

293. Deputy Paul McAuliffe asked the Minister for Transport for an update on the EV charging grant programme; and the total number of grants issued in the Dublin 9 and Dublin 11 area in each of the years 2019 to 2024, in tabular form. [35462/24]

Amharc ar fhreagra

Freagraí scríofa

The Government is fully committed to supporting a significant expansion of the electric vehicle charging network over the coming years. Having an effective and reliable charging network is an essential part of enabling drivers to make the switch to electric vehicles.

Zero Emission Vehicles Ireland (ZEVI), a dedicated Office which oversees and accelerate Ireland’s transition to zero emission vehicles, has significant funding available in 2024 for the installation of EV charging across Ireland.

Home charging is the primary charging method for most Irish EV owners as it’s convenient and cheaper for the consumer as well as assisting in the overall management of the national grid. Over 80% of charging is expected to happen at home.

A grant of up to €300 is available towards the installation cost of a domestic charge point for new and second-hand EVs. The scheme is open to homeowners whether they own an electric vehicle or not. This charging point can also be used for visitor use or at rented accommodation. The EV Home Charger Grant Scheme supports smart chargers registered on Triple E.

The apartment charger grant assists residents and owners of apartments and other multi-unit developments who want to install a home charger for their EV and which are not covered by the pre-existing grants. The grant is designed for bulk installation of chargers at a single location. Owners’ management companies, housing bodies, local authorities, commercial and private landlords can apply.

The EV Home Charger and Apartment Charger Grant Schemes are funded by ZEVI and operated by Sustainable Energy Authority of Ireland (SEAI).

As grants are tracked by county as opposed to by area, it would not be possible to provide total number of grants issued in Dublin 9 and Dublin 11 specifically.

21,475 applicants in Dublin have been paid to the value of €12,283,062, since January 2018.

Transport Infrastructure Ireland

Ceisteanna (294)

David Stanton

Ceist:

294. Deputy David Stanton asked the Minister for Transport if he will consider the introduction of a multi-annual funding model to Transport Infrastructure Ireland for large-scale road infrastructure projects such as the M20 Cork-Limerick motorway and the N72 Mallow relief road; and if he will make a statement on the matter. [35474/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for overall policy and exchequer funding in relation to Transport Infrastructure Ireland as set out in the Roads Acts 1993 to 2015.

The key element of TII’s funding structure for National Roads is the provision of Exchequer grants by the Minister toward both TII's current and capital expenditure as set out in section 24 of the Act. Capital expenditure grants are provided from my Department’s National Development Plan allocations.

The National Development Plan sets out a detailed list of National Road projects. Those projects are subject to further approvals and prioritisation in accordance with relevant commitments, policies and strategies.

Section 19(2) of the Roads Act, 1993 requires that TII to work closely with the relevant road authority. Therefore, upon receipt of its overall allocation, TII in turn provides allocations to the local authorities in their role as the relevant road authority.

In terms of the Infrastructure Guidelines, TII is the ‘Approving Authority’ and the local authority is the designated ‘Sponsoring Agency’. As part of their role as ‘Approving Authority’, TII monitors project delivery programmes and expenditures during the year in question, in order to maximise delivery and spend across the programme.

Once funding is put in place as part of the annual budget process, Exchequer funding is drawn down by TII through the submission of invoices to the Department of Transport on a regular basis. Robust procedures are in place to ensure that expenditure can be attributed to individual projects and there are regular meetings between the Department and TII in relation to the roads programme throughout the year.

Rail Network

Ceisteanna (295)

Éamon Ó Cuív

Ceist:

295. Deputy Éamon Ó Cuív asked the Minister for Transport the names of the consultants asked to review the All-Island Rail Strategy and recommend priorities; the terms of reference of the review; if it is intended to publish the results of the review before decisions are made on its implementation by the Government; and if he will make a statement on the matter. [35481/24]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, the All-Island Strategic Rail Review has been undertaken in co-operation with the Department for Infrastructure in Northern Ireland. The Review will inform the development of rail on the Island of Ireland in the coming decades to 2050, in line with net zero targets in both jurisdictions. 

The Review’s Final Report was published on the 31st of July 2024 and is available on www.gov.ie/en/publication/cc8fc-all-island-strategic-rail-review/.

The Report sets out 32 strategic recommendations to enhance and expand the rail system in Ireland and Northern Ireland up to 2050, aligning with net carbon zero commitments in both jurisdictions. The recommendations seek to transform the quality of the rail system to the benefit of passengers and wider society on the island, through additional track capacity, electrification, increased speeds, higher service frequencies and new routes.

It should be noted that individual programmes and projects referred to within the final Review Report will be advanced subject to funding and relevant approvals, as required under the Infrastructure Guidelines in Ireland.

Work on the Review was carried out by the engineering consultancy Arup, with extensive engagement from both Departments, the National Transport Authority, Iarnród Éireann and Translink. The work was reviewed by a High Level Steering Group, which in addition to representatives from both Departments, both rail companies and the NTA, included the Commission for Railway Regulation and the Department of Housing, Local Government and Heritage. JASPERS, a European Investment Bank (EIB) agency, also provided independent advice during the Review.

Assisted by the EIB Advisory Services, my Department and Department for Infrastructure, and agencies north and south, are working to progress the Report’s recommendations for the years ahead. This includes a more detailed identification of rail priorities to pursue over the next decade. A consortium of consultancies led by SUEZ have been appointed by the EIB to undertake this work. Decisions on publication timing have not yet been made. Progress in following-up on the Rail Review will be reported on as appropriate through the North South Ministerial Council.

Transport Infrastructure Ireland

Ceisteanna (296)

Michael Lowry

Ceist:

296. Deputy Michael Lowry asked the Minister for Transport to provide clarity on the recent decision by Transport Infrastructure Ireland (TII) to instruct local authorities to withhold planned road improvement tenders unless explicitly approved by TII; the rationale behind this decision and specifically; if he will address the impact of this decision on t projects (details supplied) in Tipperary, which have either been withdrawn after tender or have not yet been tendered. [35521/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Under the Roads Acts 1993-2015 and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals. In this context, TII is best placed to advise you regarding the named projects.

There has been no reduction to the overall capital funding available for national roads in 2024, which was announced at the start of the year. A number of new road projects are facing funding pressures in 2024 due to reasons including an increased pace of delivery and land acquisition costs, as well as inflation and increased cost of materials which are higher than when the original estimates were calculated. This means the allocation will be spread on fewer projects than originally anticipated. This has resulted in the need to postpone some asset renewal works to ensure that the delivery of major new roads projects can continue. This is particularly the case where existing contracts are in place. It is important to note that any postponement is temporary in nature.

In order to ensure the continued delivery of these important projects, earlier this year TII proposed to postpone some asset renewal works on the existing network, including work to renew pavement, until 2025 or as soon as possible thereafter. In addition, some Greenways funding will be used to advance active travel infrastructure on the national road network, which would otherwise be funded from the roads budget. This will allow funding to be directed to new roads projects. It is important to point out that Safety Improvement Schemes will not be effected by these measures.

Noting the above position, I have referred your question to TII for a direct reply.  Please advise my private office if you do not receive a reply within 10 working days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Departmental Funding

Ceisteanna (297)

Seán Canney

Ceist:

297. Deputy Seán Canney asked the Minister for Transport if he will give funding to local authorities to deal with the issue of ash dieback on trees located on public roads; and if he will make a statement on the matter. [35534/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Under the Roads Acts 1993-2015 and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals. 

Section 70 of the Roads Act 1993 sets out the responsibility of landowners to take all reasonable steps to ensure that trees, hedges and other vegetation growing on their land are not, or could not become, a danger to people using a public road or interfere with the safe use of a public road or the maintenance of a public road. This responsibility includes 'the preservation, felling, cutting, lopping, trimming or removal of such tree, shrub, hedge or other vegetation' in question.

As such, the implementation of the legislation and the management of hedge cutting operations is a matter for local authorities and landowners. My Department has no plans to grant-aid the cutting or removal of trees infected with ash dieback.

Regional Airports

Ceisteanna (298)

Leo Varadkar

Ceist:

298. Deputy Leo Varadkar asked the Minister for Transport when he last discussed capital funding for the extension to the runway at Waterford Airport; and if he will make a statement on the matter. [35580/24]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, my Department is currently assessing the development proposal put forward by Waterford Airport. This assessment includes significant additional documentation and responses to queries raised by Department officials and addressed by the airport up until 17 July.

A detailed appraisal is necessary to ensure that due diligence is exercised in accordance with my Department’s Transport Appraisal Framework (TAF) and the Public Spending Code/Infrastructure Guidelines.

My Department is concluding its initial assessment which I expect to be formally submitted to me for my consideration shortly. Engagement will be undertaken with Government colleagues and with all Oireachtas members within the Constituency on this matter at the appropriate time.

National aviation policy National aviation policy commits to optimising the operations of the Irish airport network to ensure maximum connectivity to the rest of the world. Whilst restrictions are posed by the planning cap on Dublin airport it is hoped that the regional airports can absorb additional traffic, which action allies with their existing growth objectives. I am actively engaged in reviewing what additional measures may be required to promote and facilitate further connections and growth in those regional airports. State investment at Waterford Airport would be contingent on significant, evidence based, demonstration that sufficient demand exists for Waterford airport to be a viable facility for regular scheduled aviation business notwithstanding that other airports in the near vicinity and shared catchment, which are already well established, are facing challenges in further growth.

I further note that Waterford airport has previously operated scheduled services without any major runway extension operate services without any major runway extension. The existing runway is comparable to Donegal airport which successfully operates both PSO and commercial propeller plane services.

Public Sector Pensions

Ceisteanna (299)

Niall Collins

Ceist:

299. Deputy Niall Collins asked the Minister for Transport when retired CIÉ workers will receive the payment due to them; and if he will make a statement on the matter. [35591/24]

Amharc ar fhreagra

Freagraí scríofa

From the outset I would like to clarify that as Minister for Transport, I have responsibility for policy and overall funding in relation to public transport. However, issues in relation to CIÉ pension schemes are primarily a matter for the trustees of the pension schemes, the CIÉ Group, and their employees.

While it is true that for the first time in many years the 1951 Scheme now meets the Pensions Authority’s Minimum Funding Standard (MFS), the scheme deficit is still significant. The MFS indicates the scheme’s ability to ‘wind-up’ as it currently stands, as opposed to its ability to fund an increase in pension benefits.

The CIÉ Board has been advised by the Scheme Actuary that the current MFS position does not create sufficient headroom to grant pension increases at this time, as such a move would put the Scheme at risk of having a deficit on an MFS basis again. In line with industry norms, and in order to achieve stability and security for all members, a MFS funding level (including the Risk Reserve) of materially in excess of 100% is required to give the Scheme sufficient resources to withstand the investment losses that could result from investment market falls.

Any proposal to increase pension benefits would be dependent on the advice of the Scheme Actuary at the time an increase is proposed and must be done in agreement with the Trustees of the Schemes. Awarding discretionary pension increases remains a goal of the CIÉ Group, but it is not envisaged that any such increases can be awarded from the Scheme in the near term.

Concerning pension increases for CIÉ pensioners, it is understood that an increase for pensioners would only be possible when the Scheme is capable of sustaining such increases. CIÉ are actively engaging with the Department to give effect to labour court recommendations for the 1951 Scheme, as passed by a ballot of trade union members in May 2021, in order, and minimise risk and liability to the 1951 Scheme. Further, changes are required to bring the scheme into compliance with the IORP II EU Directive, transposed into Irish law in 2021, of which the scheme is currently non-compliant. 

Accordingly, I have forwarded the Deputy's question to CIÉ for direct reply. Please advise my private office if you do not receive a reply within ten working days.

Bus Éireann

Ceisteanna (300)

Pauline Tully

Ceist:

300. Deputy Pauline Tully asked the Minister for Transport the amount spent by Bus Éireann on providing security personnel on its buses and stations nationwide in the years of 2023 and to date in 2024, in tabular form. [35673/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport; however, I am not involved in the day-to-day operations of public transport.

The query raised by the Deputy is an operational matter for Bus Éireann. I have, therefore, referred the Deputy's question to the company for direct reply. Please advise my private office if you do not receive a reply within ten working days.

Bus Éireann

Ceisteanna (301)

Thomas Gould

Ceist:

301. Deputy Thomas Gould asked the Minister for Transport the amount spent by Bus Éireann on private coach hire to fulfil obligations under direct award contracts in Cork city and county in each of the past 12 months respectively, in tabular form. [35697/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport; however, I am not involved in the day-to-day operations of public transport.

The query raised by the Deputy is an operational matter for Bus Éireann. I have, therefore, referred the Deputy's question to the company for direct reply. Please advise my private office if you do not receive a reply within ten working days.

Road Projects

Ceisteanna (302)

Alan Dillon

Ceist:

302. Deputy Alan Dillon asked the Minister for Transport when approval will be granted for contracts (detailed supplied); and if he will make a statement on the matter. [35711/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Under the Roads Acts 1993-2015 and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals. In this context, TII is best placed to advise you on the status of these projects.

Noting the above position, I have referred your question to TII for a direct reply.  Please advise my private office if you do not receive a reply within 10 working days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Rail Network

Ceisteanna (303)

Cian O'Callaghan

Ceist:

303. Deputy Cian O'Callaghan asked the Minister for Transport if a review is being undertaken of the DART+ Coastal North project; and if he will make a statement on the matter. [35760/24]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy may be aware, the Preliminary Business Case (PBC) for the DART+ Coastal North project was submitted to Government in May 2024 and received consent under Approval Gate 1 of the Infrastructure Guidelines. A Railway Order for DART+ Coastal North was thereafter lodged by Córas Iompair Éireann (CIÉ) to An Bord Pleanála in July 2024.

As part of the approval process, the project PBC was reviewed by the National Transport Authority (NTA), as the day-to-day Approving Authority, as well as the Department of Transport, and an external review of the PBC was conducted by JASPERS which is an agency of the European Investment Bank (EIB).

Subject to DART+ Coastal North receiving planning approval, and there being no successful legal challenge to this decision, and funding availability, the project will advance through the subsequent Approval Gates as required under the Infrastructure Guidelines. This will require a review of the project's Final Business Case by the NTA and the Department of Transport, and submission to Government for final consent for approval. 

Noting the NTA's responsibility in the matter, I have referred the Deputy's question to the NTA for a more detailed reply on the specific issue raised. Please contact my private office if you do not receive a reply within 10 days.

A referred reply was forwarded to the Deputy under Standing Order 51.

Driver Test

Ceisteanna (304)

Michael Lowry

Ceist:

304. Deputy Michael Lowry asked the Minister for Transport if there are plans to introduce plain English in the driver theory test, in line with the Government’s policy to incorporate plain English across all State services, to better support individuals with learning disabilities and ensure accessibility for all; the current supports provided in the driver theory test for individuals with learning disabilities; and if he will make a statement on the matter. [35777/24]

Amharc ar fhreagra

Freagraí scríofa

The Road Safety Authority (RSA) has statutory responsibility for the National Driver Testing Service, which includes the operation of the Theory Test. I have therefore referred the question to the Authority for direct reply. I would ask the Deputy to contact my office if a response has not been received within ten days.

Pending this more detailed response, I am informed that the Driver Theory Test provider offers various options to accommodate candidates who may require special assistance to take their test. For instance, they offer a voiceover option whereby the questions and answers are read out to the candidate over headphones. Additional time is also allowed for the candidate to take the test. There is also a reader recorder service whereby a staff member will read the questions and answer options to the candidate and record their answers on screen. Other services offered include dyslexia support, professional and Irish Sign Language (ISL) video clips, and ISL interpreters.

Transport Costs

Ceisteanna (305)

Violet-Anne Wynne

Ceist:

305. Deputy Violet-Anne Wynne asked the Minister for Transport the reason he has not rolled out the 90-minute Leap card travel window to counties outside of Dublin, such as County Clare, which has recently had its 343 bus route cut into two requiring customers to pay twice; if he will consider introducing this measure in Budget 2025; and if he will make a statement on the matter. [35808/24]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport. However, I am not involved in the day-to-day operations of public transport. The National Transport Authority (NTA) has responsibility for the regulation of fares charged to passengers in respect of public transport services provided under public service obligation (PSO) contracts. 

As the Deputy will be aware, funding was provided under Budget 2024 for the continuation of the 20% average fare reduction on PSO services, and for an extension of the upper limit of the YAC from 23 to 25 years of age. Public transport fare initiatives will form part of my discussions with the Minister for Public Expenditure, National Development Plan Delivery and Reform in the context of Budget 2025 negotiations.

In light of the NTA's responsibility in this area, I have forwarded the Deputy's request to the NTA for direct reply. Please advise my private office if you do not receive a response within ten working days.