Departmental Funding

Ceisteanna (565)

Michael Lowry

Ceist:

565. Deputy Michael Lowry asked the Minister for Further and Higher Education, Research, Innovation and Science if he will allocate additional funding for period products and the fund for students with disabilities; if he will establish a Government-funded T-fund for trans and non-binary students to address social inequalities and support disadvantaged students which is a key ask of an organisation (details supplied) in it's pre-Budget 2025 submission; and if he will make a statement on the matter. [37930/24]

Amharc ar fhreagra

Freagraí scríofa

As a part of Budget 2025, I intend to continue removing barriers to education to assist students in reaching their full potential or pursuing their goals and getting to where they want to in life.

As the Deputy will appreciate, the Estimates process in ongoing. While I cannot pre-empt the budgetary process addressing costs for families and learners and supporting disadvantaged students will be a priority for me in the Budget 2025 discussions.

Community Welfare Services

Ceisteanna (566)

Peadar Tóibín

Ceist:

566. Deputy Peadar Tóibín asked the Minister for Rural and Community Development if she will meet with management of an organisation (details supplied); and if she will provide this much needed resource. [37803/24]

Amharc ar fhreagra

Freagraí scríofa

My Department's Community Services Programme (CSP) supports over 430 community-based organisations, to provide local services through a social enterprise model, with funding of circa €50 million allocated every year.

The aim of the CSP is to create sustainable jobs for those most distant from the labour market, in particular for those who are long term unemployed and from specific target groups.

In relation to the specific organisation referred to by the Deputy, my Department recognises the invaluable services provided and has allocated funding under the CSP, in 2024, to support one manager and six Full-Time Equivalent (FTE) positions.

An application window for funding for additional staff posts to existing CSP funded organisations was opened on 1st of September, 2023, with a closing date on 29th of September, 2023. This organisation was one of 137 organisations that applied for additional FTE positions. The successful applications were announced on 18th of June, 2024, with approvals amounting to an additional €1 million in annual funding to support a further seven manager positions and 35 FTE positions in 32 CSP supported organisations. Unfortunately, the organisation's application was unsuccessful on that occasion.

As is standard practice, the organisation's application remains on file and will be considered again, subject to available budgets. I would encourage the organisation in question to consider contacting their Local Development Company or Local Authority Local Community Development Committee, who may be able to provide some guidance on other supports available at this time. They may also be able to provide information on the Department of Social Protection's TUS and Community Employment (CE) schemes.

Air Services

Ceisteanna (567)

Éamon Ó Cuív

Ceist:

567. Deputy Éamon Ó Cuív asked the Minister for Rural and Community Development the estimated costs of starting an air service to Inishbofin; and the estimated full-year costs associated with running such a service. [37375/24]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, the airstrips on Inishbofin and at Cleggan on the mainland are currently unlicensed, and bringing them into compliance with the requirements of the Irish Aviation Authority would require significant investment to make them operational. This would include the provision of fire fighting vehicles, equipment and training, and could also require the construction of terminal buildings. Accordingly, it is not possible to provide the Deputy with estimated costs of setting up an air service to Inishbofin as there are too many unknown factors to be considered.

Similarly, it is not possible to provide the Deputy with the estimated full-year running costs of such an air service, as it would depend on a number of factors, such as the frequency of the flights, the number of seats offered, as well as the availability of suitable operators to provide the service. Ultimately, the open market would decide the cost of any service through a competitive procurement process.

My Department has no immediate plans to develop a new air service for Inishbofin. In the meantime, permanent helipad lighting is being installed at the airstrip on Inishbofin to ensure that the Irish Coast Guard can continue to provide emergency medical evacuations from the island all year round.

Separately, my Department is engaging with Galway County Council and the HSE to facilitate the transfer of a portion of land adjoining the airstrip on Inishbofin to the HSE for the construction of a new health centre on the island. My Department is also engaged with the OPW regarding the construction of a new coast guard station on a portion of land adjoining the airstrip at Cleggan. I can assure the Deputy that any developments being considered on lands adjoining the airstrips will not hinder the potential for air services to operate from the airstrips in the future.

Defective Building Materials

Ceisteanna (568)

Thomas Pringle

Ceist:

568. Deputy Thomas Pringle asked the Minister for Rural and Community Development if she will meet with a group from Donegal (details supplied) that requested a meeting in Q4 of 2023; and if she will make a statement on the matter. [37540/24]

Amharc ar fhreagra

Freagraí scríofa

The group in question made contact with me and my office has been in contact with them on a number of occasions. The group have been advised to make contact with their local development company in Donegal who receive funding from the Department of Housing, Local Government and Heritage via Donegal County Council to employ redress support workers across the County.

Freedom of Information

Ceisteanna (569)

Carol Nolan

Ceist:

569. Deputy Carol Nolan asked the Minister for Rural and Community Development the total number of freedom of information requests submitted to her Department in 2022, 2023 and to date in 2024; the total number of such requests that were rejected in their entirety; and if she will make a statement on the matter. [37602/24]

Amharc ar fhreagra

Freagraí scríofa

My Department received a total of 46 Freedom of Information requests in 2022, of which 7 were refused. In 2023 my Department has received a total of 55 Freedom of Information requests, of which 13 were refused. For 2024 to date, my Department has received 70 Freedom of Information requests, of which 17 have been refused.

The refusal of requests occurs for a number reasons. The most common reason is that the requested records do not exist, and such requests are refused under Section 15(1)(a) of the relevant Act. The basis for other refusals are varied, and include, Section 29 (Deliberations of FOI Bodies), Section 30 (Functions and Negotiations of FOI Bodies), Section 35 (Information obtained in confidence) and Section 36 (Commercially Sensitive Information).

For 2022, of the 7 requests refused, 4 were due to no relevant records being held by the Department. For 2023, of the 13 requests refused, 8 were due to no relevant records being held by the Department. For 2024 to date, of the 17 requests refused, 10 were due to no relevant records being held by the Department.In compliance with the Freedom of Information Publication Scheme my Department publishes, on a quarterly basis, a log of all non-personal Freedom of Information requests received. These logs are available on our website at www.gov.ie/en/collection/f68256-disclosure-logs/ . My Department endeavours to deal with all Freedom of Information requests in an open and accessible manner, and is active in assisting requesters to refine their requests where possible to ensure that relevant information can be provided.

Community Development Projects

Ceisteanna (570)

Robert Troy

Ceist:

570. Deputy Robert Troy asked the Minister for Rural and Community Development if she will provide an update on the application for a community centre investment grant by a facility (details supplied). [37779/24]

Amharc ar fhreagra

Freagraí scríofa

Under the 2022 Community Centre Investment Fund, over €45.8 million was committed for improvement and refurbishment works on 861 existing community centres across Ireland. In April, I approved funding of €30 million for the construction of 12 new community centres across nine counties.

In June this year, I was delighted to announce a further round of funding to support community groups to upgrade and refurbish the community facilities in their areas. The Community Centre Investment Fund 2024 will provide funding of between €10,000 and €100,000 towards capital costs for the refurbishment of existing community centres.

The 2024 scheme closed for applications on Thursday 5th September. I understand that the application referred to by the Deputy has been received and will now be appraised alongside all of the other applications. I expect to begin announcing the successful applicants in the coming months.

EU Funding

Ceisteanna (571)

Denis Naughten

Ceist:

571. Deputy Denis Naughten asked the Minister for Rural and Community Development the projects and programmes with her Department which have been allocated funding under the EU's Recovery and Resilience Programme; the funds drawn down to date in each instance; the profiled drawdown in each of the forthcoming years of the programme; the steps she is taking to ensure that projects and programmes are completed within the specified timeframe; and if she will make a statement on the matter. [37793/24]

Amharc ar fhreagra

Freagraí scríofa

The European Union Recovery Instrument (EURI) is a fund established by the European Union as part of the European Recovery and Resilience Facility to support recovery following the Covid-19 pandemic.

A total of €20 million was provided for the years 2021 and 2022 to the LEADER Local Action Groups for allocation in line with the EURI objectives of addressing the impact of COVID-19 and economic recovery.

The purpose of EURI funding was to provide local communities and enterprises with an opportunity to respond to the challenges of the pandemic and support measures that encouraged employment and job creation, provide support for new and innovative projects in the green economy, and to maximise the potential of broadband and the digital economy in communities.

To date, €19.4 million in EURI funding has been drawn down through the 2014-2022 LEADER Programme and it is anticipated that remaining EURI funding will be drawn down by the end of 2024.

Departmental Funding

Ceisteanna (572)

Jackie Cahill

Ceist:

572. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the town and village renewal scheme, including streetscape enhancement measures, in each county from 2020 to date in 2024, in tabular form. [37905/24]

Amharc ar fhreagra

Freagraí scríofa

The Town and Village Renewal Scheme (TVRS) was introduced in 2016 and is one of a number of measures designed to rejuvenate rural towns and villages throughout Ireland. Since the launch of the scheme over €177 million has been allocated to almost 1,800 projects. The Scheme is primarily targeted at towns and villages with a population of 10,000 or less.

TVRS is administered through local authorities, who work closely with local communities and businesses to develop proposals that will bring long-lasting, positive impacts to rural towns and villages.

Earlier this year, in recognition of the need for additional supports required to achieve the goals set out in the Town Centre First Policy (TCF), I launched a new TCF Suite of Supports which is providing an additional €4 million across 3 measures to support broader efforts to regenerate town centres through a bottom-up approach. One such measure supports the completion of Project Development Measure (PDM) projects and on the 23 August 2024, I announced €2.6 million in funding to support 53 successful projects.

The allocations in the table below include the amounts awarded under TVRS and the TCF Suite of Supports PDM; successful projects under the 2024 PDM are available on my Departments website.

Local Authority/County

Total Funding Allocated in 2020

Total Funding Allocated in 2021

Total Funding Allocated in 2022

Total Funding Allocated in 2023

Total Funding Allocated to date in 2024

Carlow

€291,742

€786,057

€2,479,369

€275,000

€873,301

Cavan

€462,193

€989,873

€2,663,627

€485,000

€893,087

Clare

€435,868

€1,114,192

€1,794,983

€350,000

€1,235,281

Cork City

€40,000

€200,000

€454,120

€0

€566,680

Cork Co

€486,850

€1,136,647

€1,864,853

€445,000

€689,116

Donegal

€410,318

€708,664

€1,723,234

€265,000

€897,450

Dunlaoghaire/ Rathdown

€0

€0

€225,000

€0

€0

Fingal

€232,304

€236,763

€280,536

€500,000

€197,150

South Dublin

€9,450

€0

€0

€0

€0

Galway

€415,323

€1,082,272

€1,470,575

€0

€898,925

Kerry

€424,040

€907,666

€1,687,138

€500,000

€1,041,200

Kildare

€414,700

€482,896

€1,304,880

€0

€427,335

Kilkenny

€461,200

€732,306

€1,628,090

€450,000

€1,094,900

Laois

€391,900

€643,375

€2,163,852

€175,000

€1,068,119

Leitrim

€276,953

€930,970

€2,493,067

€485,000

€893,767

Limerick

€350,960

€971,685

€2,686,229

€160,000

€780,805

Longford

€307,673

€640,188

€1,397,043

€165,000

€867,885

Louth

€369,440

€608,089

€1,280,197

€0

€407,163

Mayo

€461,821

€898,946

€1,196,843

€225,000

€982,807

Meath

€405,563

€686,997

€1,763,206

€410,000

€1,284,017

Monaghan

€422,320

€1,136,607

€2,129,789

€500,000

€850,000

Offaly

€450,000

€904,500

€1,961,000

€300,000

€550,000

Roscommon

€428,885

€1,020,000

€2,462,435

€0

€1,149,999

Sligo

€425,000

€890,000

€2,670,101

€125,000

€1,150,000

Tipperary

€392,634

€1,475,612

€2,171,571

€500,000

€1,016,099

Waterford

€451,917

€453,210

€1,850,601

€500,000

€807,171

Westmeath

€394,600

€272,300

€1,295,239

€300,000

€506,556

Wexford

€382,500

€1,078,925

€2,519,415

€500,000

€1,096,590

Wicklow

€394,455

€949,569

€1,360,738

€0

€825,000

Total Funding Approved

€10,390,609

€21,938,308

€48,977,728

€7,615,000

€23,050,403

Departmental Funding

Ceisteanna (573)

Jackie Cahill

Ceist:

573. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the outdoor recreation infrastructure scheme in each county from 2020 to date in 2024, in tabular form. [37906/24]

Amharc ar fhreagra

Freagraí scríofa

The Outdoor Recreation Infrastructure Scheme (ORIS) provides funding for the development and enhancement of outdoor recreational infrastructure such as walking trails, cycleways, water-based recreation sites and mountain trails.

Since 2020, funding of over €85.5 million has been allocated to 1,073 outdoor recreation projects nationwide.

A table detailing funding approved for each county under ORIS since 2020 is set out below. This information relates to the funding approvals per calendar year rather than each annual iteration of the scheme. For example, projects under measures 1, 2 and 3 of the ORIS 2023 scheme were formally announced at the start of 2024 and are included under the 2024 column below.

Details of all approved projects can be found on my Department's website.

County

2020

2021

2022

2023

2024

Total

Carlow

€44,826

€1,117,763

€740,800

€0

€175,500

€2,078,889

Cavan

€112,565

€1,623,320

€307,012

€72,194

€745,915

€2,861,006

Clare

€52,800

€930,929

€939,336

€100,000

€984,554

€3,007,619

Cork

€150,216

€1,984,466

€1,033,140

€125,650

€1,010,584

€4,304,056

Donegal

€500,000

€1,358,595

€1,099,150

€129,700

€1,267,791

€4,355,236

Dublin

€0

€550,500

€467,200

€40,500

€0

€1,058,200

Galway

€381,419

€2,431,237

€1,322,240

€204,327

€605,002

€4,944,226

Kerry

€472,429

€1,751,811

€1,254,405

€100,000

€1,317,616

€4,896,261

Kildare

€0

€206,419

€242,184

€90,000

€155,700

€694,303

Kilkenny

€340,000

€1,648,906

€1,202,072

€99,000

€1,090,630

€4,380,608

Laois

€0

€703,092

€473,884

€44,280

€872,750

€2,094,006

Leitrim

€136,000

€1,559,344

€703,679

€56,894

€874,087

€3,330,004

Limerick

€30,000

€1,375,167

€415,411

€84,200

€799,062

€2,703,839

Longford

€650,845

€1,176,801

€629,715

€99,000

€580,000

€3,136,361

Louth

€200,000

€365,533

€30,000

€0

€194,119

€789,651

Mayo

€900,000

€1,085,779

€776,876

€100,000

€1,158,474

€4,021,129

Meath

€500,000

€1,670,500

€461,613

€50,000

€1,103,907

€3,786,020

Monaghan

€380,155

€1,336,979

€1,071,292

€100,000

€1,179,296

€4,067,721

Nationwide

€478,747

€991,317

€0

€0

€416,450

€1,886,514

Offaly

€537,640

€958,714

€194,577

€49,500

€591,954

€2,332,384

Roscommon

€400,000

€1,972,394

€1,220,140

€100,000

€825,407

€4,517,942

Sligo

€235,600

€1,386,750

€542,796

€150,000

€736,000

€3,051,146

Tipperary

€545,540

€1,245,901

€1,169,875

€99,500

€816,680

€3,877,495

Waterford

€273,134

€1,345,844

€788,211

€100,000

€1,078,240

€3,585,429

Westmeath

€868,000

€920,551

€562,314

€100,000

€395,935

€2,846,800

Wexford

€62,328

€1,379,371

€886,250

€83,374

€530,458

€2,941,781

Wicklow

€152,560

€1,652,285

€1,272,870

€90,000

€821,505

€3,989,220

Total

€8,404,804

€34,730,269

€19,807,039

€2,268,117

€20,327,615

€85,537,845

Departmental Funding

Ceisteanna (574)

Jackie Cahill

Ceist:

574. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under Leader, in each county from 2020 to date in 2024, in tabular form. [37907/24]

Amharc ar fhreagra

Freagraí scríofa

The LEADER Programme is a key intervention of Our Rural Future, the Government’s Policy for rural development which aims to deliver a range of actions to rural communities over the lifetime of the policy. It supports a broad range of activities which aim to respond to the diversity of the local needs of our rural areas and is delivered at local level by Local Action Groups (LAGs).

From 2020 to date, projects to the value of over €145 million were approved for funding through the LEADER Programme. The table below gives a breakdown of the cumulative amount of funding approved under the 2014-2022 and 2023-2027 LEADER programmes by county during the referenced timeframe.

The LAGs are in the early stages of implementation of the 2023-2027 LEADER programme which involves engaging with their respective communities and working with them to develop their project proposals. Over the coming years I look forward to seeing the continued delivery of LEADER projects that support the development of our rural areas and communities.

Table 1: Funding Approved per county from 2020 to 23/09/2024

County

Funding Approved

Carlow

€3,747,761

Cavan

€5,637,339

Clare

€5,504,512

Cork

€11,255,839

Donegal

€7,838,955

Dublin

€4,758,822

Galway

€8,811,456

Kerry

€5,922,702

Kildare

€3,064,567

Kilkenny

€6,919,591

Laois

€5,786,303

Leitrim

€3,794,683

Limerick

€6,087,175

Longford

€5,149,718

Louth

€4,347,016

Mayo

€7,026,651

Meath

€3,707,384

Monaghan

€5,022,287

Offaly

€5,169,545

Roscommon

€4,673,267

Sligo

€4,365,543

Tipperary

€6,953,025

Waterford

€4,517,228

Westmeath

€4,471,703

Wexford

€6,027,298

Wicklow

€5,180,827

Total

€145,741,198

Departmental Funding

Ceisteanna (575)

Jackie Cahill

Ceist:

575. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the CLÁR, in each county from 2020 to date in 2024, in tabular form. [37908/24]

Amharc ar fhreagra

Freagraí scríofa

My Department's CLÁR programme provides funding under a number of different measures for small-scale infrastructural projects in designated rural areas. Since 2020, over €39 million has been allocated under the CLÁR programme to almost 1000 projects

A table detailing funding approved for each county under CLÁR since 2020 is set out below. This information relates to the amount approved under each annual iteration of the scheme. There are no CLÁR areas in Dublin, Kildare or Wexford. Further announcements under CLÁR 2024 are expected in the coming weeks.

Details of all approved projects can be found on my Department's website.

County

CLÁR 2020 Approvals

CLÁR 2021 Approvals

CLÁR 2022 Approvals

CLÁR 2023 Approvals

CLÁR 2024 Approvals

Carlow

€143,418

€89,963

€86,983

€267,099

€0

Cavan

€374,318

€391,241

€616,058

€586,823

€41,141

Clare

€332,580

€358,313

€679,222

€722,643

€69,649

Cork

€273,402

€401,226

€895,982

€715,359

€206,218

Donegal

€339,680

€383,470

€943,046

€882,534

€101,387

Dublin

€0

€0

€0

€0

€0

Galway

€438,878

€462,368

€1,063,583

€973,124

€58,864

Kerry

€576,715

€657,473

€812,864

€886,621

€364,380

Kildare

€0

€0

€0

€0

€0

Kilkenny

€77,000

€57,300

€420,207

€295,469

€72,000

Laois

€166,440

€179,517

€444,105

€271,058

€0

Leitrim

€347,597

€386,329

€524,106

€518,892

€0

Limerick

€145,382

€183,742

€408,289

€722,273

€24,000

Longford

€362,008

€399,882

€580,140

€498,190

€25,560

Louth

€63,500

€80,000

€109,427

€414,948

€0

Mayo

€458,421

€483,295

€822,631

€1,125,608

€577,464

Meath

€80,600

€202,454

€378,088

€239,774

€0

Monaghan

€256,614

€341,184

€784,362

€675,071

€24,156

Offaly

€164,144

€127,879

€188,693

€205,617

€102,275

Roscommon

€499,231

€333,307

€542,554

€815,413

€106,562

Sligo

€220,621

€350,782

€457,849

€547,832

€46,716

Tipperary

€84,226

€140,108

€635,276

€556,899

€184,809

Waterford

€148,500

€216,182

€279,500

€232,239

€0

Westmeath

€150,000

€163,670

€336,200

€641,912

€39,586

Wexford

€0

€0

€0

€0

€0

Wicklow

€60,000

€82,257

€169,200

€220,899

€56,000

Total

€5,763,275

€6,471,942

€12,178,366

€13,016,296

€2,100,768

Departmental Funding

Ceisteanna (576)

Jackie Cahill

Ceist:

576. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the rural regeneration fund, in each county from 2020 to date in 2024, in tabular form. [37909/24]

Amharc ar fhreagra

Freagraí scríofa

The Rural Regeneration and Development Fund is a strategic capital investment fund that is key to the delivery of Ireland's rural development policy, Our Rural Future 2021-2025.

The Rural Regeneration and Development Fund (RRDF) provides funding for the development and construction of capital projects in towns, villages and rural areas across Ireland.

Calls for applications to the Fund are sought under two categories – Category 1 and Category 2. Category 1 relates to large scale ambitious capital projects with all necessary planning and other consents in place and ready to proceed. Category 2 provides grant funding to enable the development of project proposals suitable for future calls for Category 1 applications.

Since 2020, RRDF funding of €422.8 million has been approved for 135 projects countrywide.

The table below sets out the funding allocated to each county from 2020 to date in 2024. No RRDF funding was allocated in the 2023 calendar year.

County

2020

2021

2022

2024

Total Funding

Carlow

€222,394

€2,189,908

€2,412,302

Cavan

€787,500

€3,032,532

€7,862,155

€17,146,142

€28,828,329

Clare

€8,351,684

€8,765,000

€17,116,684

Cork

€551,250

€4,861,211

€24,002,644

€5,131,963

€34,547,068

Donegal

€372,494

€20,427,191

€8,229,056

€12,168,842

€41,197,583

Galway

€1,984,885

€2,950,749

€956,084

€13,757,843

€19,649,561

Kerry

€2,056,380

€2,467,152

€1,691,104

€7,132,781

€13,347,416

Kildare

€2,063,865

€5,107,442

€7,171,307

Kilkenny

€4,013,115

€2,606,613

€1,885,138

€8,504,866

Laois

€1,385,999

€1,999,442

€3,337,714

€6,723,156

Leitrim

€476,033

€5,635,873

€10,845,324

€8,154,834

€25,112,064

Limerick

€2,500,000

€1,750,000

€600,000

€13,585,722

€18,435,722

Longford

€468,750

€6,664,799

€1,115,400

€8,248,949

Louth

€710,980

€2,864,642

€3,575,622

Mayo

€461,615

€8,278,682

€11,411,364

€11,127,748

€31,279,409

Meath

€608,250

€727,215

€1,807,102

€3,142,567

Multi County

€300,000

€4,028,356

€4,328,356

Monaghan

€295,000

€11,490,272

€3,743,428

€15,915,482

€31,444,182

Offaly

€454,535

€2,739,553

€12,256,727

€15,450,815

Roscommon

€434,010

€2,174,400

€7,348,697

€6,057,795

€16,014,902

Sligo

€424,500

€580,000

€8,474,869

€9,479,369

Tipperary

€1,701,521

€3,495,793

€34,104,675

€7,979,362

€47,281,351

Waterford

€1,207,500

€7,406,160

€3,273,638

€11,887,298

Westmeath

€311,250

€8,174,780

€4,646,566

€13,132,596

Wexford

€814,393

€2,331,826

€3,146,219

Wicklow

€357,750

€1,034,704

€1,392,454

Total

€18,528,068

€90,394,404

€149,225,985

€164,701,690

€422,850,147

Departmental Funding

Ceisteanna (577)

Jackie Cahill

Ceist:

577. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the local improvement scheme, in each county from 2020 to date in 2024, in tabular form. [37910/24]

Amharc ar fhreagra

Freagraí scríofa

The Local Improvement Scheme (LIS) supports improving rural roads and laneways that are not usually maintained by local authorities. As part of Our Rural Future, the government is committed to ensuring that LIS is funded in the future.

My Department reintroduced the scheme in 2017 after several years without dedicated funding. Between 2017 and 2024, almost €170 million has been allocated to local authorities under the scheme. Up to the end of 2023, this has upgraded over 4,000 non-public roads and lanes, benefitting nearly 20,000 landowners and residents in these rural areas.

Attached is a breakdown of the cumulative funding provided under the Local Improvement Scheme in each county from 2020 to date in 2024. To help local authorities better plan their work programmes, this year, I have directed additional funding to LIS and have allocated funding to local authorities for both 2024 and 2025.

The table below sets out the overall funding allocated on a county basis from 2020 - 2025.

LIS Allocations

Departmental Funding

Ceisteanna (578)

Jackie Cahill

Ceist:

578. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the connected hubs scheme, in each county from 2020 to date in 2024, in tabular form. [37911/24]

Amharc ar fhreagra

Freagraí scríofa

Our Rural Future recognises the opportunity that remote working presents for rural rejuvenation and commits to establishing a comprehensive and integrated national network of 400 remote working hubs by 2025. It provides an opportunity for people to continue to live in rural communities while following their career ambitions, supporting the retention of skilled people in rural communities and attracting mobile talent to rural areas. It can reduce commuting time, lowering transport emissions, provide a better work-life balance and an improved quality of life.

Substantial funding has been invested by my Department in the development of remote working facilities through a variety of programmes including funding for the conversion of many vacant and derelict buildings into remote working hubs.

In 2021, I launched connectedhubs.ie, a shared online booking and payments platform for remote working hubs and their users. There are currently 366 facilities across the country on-boarded to the platform. An interactive map that shows the location and details of each remote working hub in Ireland is available on connectedhubs.ie.

The Connected Hubs call in 2021 and 2022, awarded approximately €14 million to almost 200 projects enabling successful applicants to add additional capacity to existing remote working infrastructure in digital hubs and Broadband Connection Points (BCP) throughout the country (Table 1 attached).

I am committed to ensuring that the Connected Hubs Network will continue to make a central contribution to the achievement of the Government's vision for rural Ireland, as set out in Our Rural Future.

Hubs Funding

Departmental Funding

Ceisteanna (579)

Jackie Cahill

Ceist:

579. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the social inclusion and community activation programme, in each county from 2020 to date in 2024, in tabular form. [37912/24]

Amharc ar fhreagra

Freagraí scríofa

The Social Inclusion and Community Activation Programme (SICAP) is Ireland’s primary social inclusion intervention with an allocation of €47.4 million in 2024. SICAP funding allocations are made based on levels of relative affluence and deprivation in communities, ensuring the programme is targeting disadvantage fairly, to help those individuals in greatest need of the support.

The programme is managed at a local level by 33 Local Community Development Committees (LCDCs), with support from local authorities, and actions are delivered by 47 Local Development Companies across 53 Lot areas.

In 2022, an additional €5 million funding was allocated through SICAP, to support the Local Development Companies in the community response to support people arriving from Ukraine. An additional €10 million was also provided under SICAP in 2023 and in excess of €11m has been allocated in 2024 to allow Local Development Companies to continue their work to support New Arrivals and International Protection Applicants.

As requested, please see attached a breakdown of county by county allocations for SICAP for 2020 to 2024 including New Arrivals funding from 2022.

SICAP County by County 2020 -2024

Departmental Funding

Ceisteanna (580)

Jackie Cahill

Ceist:

580. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the Community Services Programme, in each county from 2020 to date in 2024, in tabular form. [37913/24]

Amharc ar fhreagra

Freagraí scríofa

My Departments Community Services Programme (CSP) currently supports over 430 community-based organisations, to provide local services through a social enterprise model, with an annual co-funding contribution towards each full-time equivalent (FTE) position being supported, and, where warranted, towards the cost of employing a manager.

Following an independent review of the programme, the CSP was restructured with a needs-based, differentiated funding allocation model introduced for the CSP from January 2023, as an alternative to the previous flat rate payment model. This new model was designed to support those organisations most in need, providing a higher rate of funding to supported organisations that are identified as operating in areas of high disadvantage, employing individuals from the prescribed programme target groups and with evidence of limited earning potential.

In March 2023, funding of €1m was made available for a Call for Proposals in respect of specific CSP services which resulted in 14 new applicants being approved entry to the CSP on 13th December last, supporting thirteen manager positions and twenty three full time equivalent positions, valued at circa €1m.

An application window for funding for additional staff posts to existing CSP funded organisations was opened on September 1st 2023 with a closing date of 29th September 2023. The successful applications were announced on 18th June, approving €1 million in funding to support a further seven manager positions and thirty five FTE positions in thirty two CSP supported organisations.

Following the announcement of an increase of €1.40 to the minimum wage as part of Budget 2024, on 13th December last, I announced that the CSP contributions would increase for organisations at the higher level and at the medium level for both FTEs and for managers.

The County by County allocations below are reflective of funding provided including these measures.

County by County Allocations for Community Services Programme 2020 to date 2024.

County

2020

2021

2022

2023

2024(Allocation Forecast from 1st January to 31st December)

Carlow

€331,163.42

€325,869.16

€262,761.41

€303,363.00

€330,075.00

Cavan

€236,661.52

€245,044.92

€273,363.00

€312,330.00

€348,337.50

Clare

€1,230,840.04

€1,299,446.82

€1,243,394.00

€1,372,650.00

€1,491,710.50

Cork

€2,677,628.06

€2,707,956.13

€2,443,736.00

€2,718,750.50

€2,985,716.00

Donegal

€3,530,890.62

€3,936,110.58

€3,679,891.00

€4,083,707.50

€4,626,362.50

Dublin

€10,286,399.59

€10,785,817.49

€10,088,148.00

€10,634,023.80

€11,403,811.20

Galway

€2,330,417.37

€2,525,868.44

€2,421,629.00

€2,668,321.50

€3,215,012.50

Kerry

€1,719,263.53

€1,869,354.82

€1,684,911.00

€1,835,967.10

€1,964,035.06

Kildare

€453,452.85

€513,271.40

€443,545.00

€495,044.50

€549,350.00

Kilkenny

€567,465.51

€633,210.46

€556,091.00

€615,693.00

€638,449.00

Laois

€404,100.34

€428,324.46

€378,429.00

€417,020.00

€434,916.00

Leitrim

€1,406,653.71

€1,473,129.61

€1,362,351.00

€1,485,100.50

€1,619,107.00

Limerick

€1,728,423.85

€1,880,925.56

€1,677,509.00

€1,709,065.43

€1,795,066.00

Longford

€543,313.37

€454,739.68

€415,528.00

€470,528.00

€574,225.00

Louth

€1,656,257.25

€1,681,258.48

€1,651,462.00

€1,788,178.00

€1,965,275.00

Mayo

€3,599,361.85

€3,876,530.31

€3,667,335.64

€4,020,554.00

€4,498,006.00

Meath

€1,041,409.39

€1,102,582.92

€991,787.00

€1,052,770.50

€1,147,162.00

Monaghan

€1,228,795.88

€1,327,903.34

€1,186,319.00

€1,383,133.50

€1,558,662.50

Offaly

€1,272,147.21

€1,405,971.52

€1,175,904.00

€1,306,869.50

€1,486,785.50

Roscommon

€2,153,742.78

€2,435,266.35

€2,302,656.00

€2,522,904.00

€2,837,529.75

Sligo

€807,959.06

€860,338.58

€769,974.00

€750,841.50

€866,400.00

Tipperary

€731,817.24

€833,406.08

€713,920.00

€806,308.50

€927,424.50

Waterford

€1,096,253.02

€1,145,894.86

€1,004,221.00

€1,171,737.50

€1,347,600.00

Westmeath

€1,093,676.71

€1,095,236.82

€1,039,738.00

€1,077,638.50

€1,180,815.50

Wexford

€2,392,695.94

€2,454,663.78

€2,137,585.11

€2,339,838.00

€2,599,612.50

Wicklow

€1,612,760.12

€1,636,797.88

€1,482,514.00

€1,674,013.00

€1,829,037.50

Annual Total

€46,133,550.22

€48,934,920.45

€45,054,702.16

€49,016,351.38

€54,220,484.00

Departmental Funding

Ceisteanna (581)

Jackie Cahill

Ceist:

581. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the community centres investment fund; and the total number of community centres funded, in each county from 2020 to date in 2024, in tabular form. [37914/24]

Amharc ar fhreagra

Freagraí scríofa

Under the 2022 Community Centre Investment Fund, over €45.8 million was committed for improvement and refurbishment works on 861 existing community centres across Ireland. In April, I approved funding of €30 million for the construction of 12 new community centres across nine counties.

In June this year, I was delighted to announce a new round of the Community Centre Investment Fund which will provide funding of between €10,000 and €100,000 towards capital costs for the refurbishment of existing community centres. The 2024 scheme closed for applications on Thursday 5th September.

Please find a table attached which lists the cumulative funding provided under the Community Centres Investment Fund and the total number of community centres funded in each county in 2022 and 2023. I expect to begin announcing the successful applicants under the 2024 scheme in the coming months.

Details of all approved projects can be found on my Department's website.

Community Centre Investment Fund 2020 to 2024

Departmental Funding

Ceisteanna (582)

Jackie Cahill

Ceist:

582. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the community enhancement programme, in each county from 2020 to date in 2024, in tabular form. [37915/24]

Amharc ar fhreagra

Freagraí scríofa

The Community Enhancement Programme (CEP) was established in 2018 with the aim of providing funding for community groups in disadvantaged areas across Ireland. There have been a number of iterations of the CEP since then. In 2023, the CEP was replaced by the Local Enhancement Programme (LEP) which has a particular focus on small capital works/improvements, and the purchase of equipment for community use. Various community groups have benefited from the CEP and LEP with almost €59m in funding being approved for almost 27,000 projects countrywide.

The LEP is administered locally on behalf of my Department by Local Community Development Committees (LCDCs) across the country, with support from their Local Authority. The relevant LCDC receive and appraise applications for funding under the LEP and make determinations on how the funding can best support their communities.

The LEP is now closed to applicants.

Please find attached table 1 below which provides a breakdown of the funding allocated to each County from 2020 - 2023. To date in 2024, no funding announcement has been made with regard to the LEP, and any announcement relating to the next iteration of the LEP will be considered within the context of available resources.

Table 1 PQ 37915 24

Departmental Funding

Ceisteanna (583)

Jackie Cahill

Ceist:

583. Deputy Jackie Cahill asked the Minister for Rural and Community Development the cumulative funding provided under the community recognition fund, in each county from 2020 to date in 2024, in tabular form. [37916/24]

Amharc ar fhreagra

Freagraí scríofa

The Community Recognition Fund was first introduced in 2023 to recognise the huge efforts made by communities in welcoming and supporting people coming to Ireland. Through the 2023 allocation, funding of €50 million was approved for some 900 projects. I was delighted to announce a further €50 million in funding under the Community Recognition Fund on March 15th last. The attached table lists the funding allocated to each county under the Community Recognition Fund in 2023 and 2024.

Applications under the current round of funding can be submitted by local authorities across three phases, so as to allow flexibility and adequate engagement and collaboration at a local level. The closing date for receipt of applications under phase 1 was May 31st last, with the subsequent phases closing on September 30th, 2024 and January 31st, 2025.

Successful projects under phase 1 of the 2024 scheme were announced on 2nd August. I expect that the successful projects under phase 2 will be announced before the end of the year. Details of all approved projects can be found on my Department's website.

Community Recognition Fund 2020 to 2024

Roinn