Wind Energy Guidelines

Ceisteanna (112)

Richard O'Donoghue

Ceist:

112. Deputy Richard O'Donoghue asked the Minister for the Environment, Climate and Communications what actions and decisions were made by his Department when it received a joint submission (details supplied), signed by 13 acousticians during the public consultation period for the draft 2019 WEDGs; if this matter was brought to his attention; what action or decisions were made because of receiving the joint submission; and if he will make a statement on the matter. [44114/24]

Amharc ar fhreagra

Freagraí scríofa

The preparation and adoption of statutory planning guidelines are a function of the Minister for Housing, Local Government and Heritage, pursuant to section 28 of the Planning and Development Act, 2000 (as amended).  As such, I have no statutory role in their preparation or adoption.

The Climate Action Plan 2024 contains a commitment to issue new wind energy development guidelines (WEDGs).

In connection with this commitment, the Department of Housing, Local Government and Heritage (DHLGH), as the Department with responsibility for planning guidelines such as the WEDGs, is currently undertaking this work. The review is addressing a number of key aspects including noise, setback distance, shadow flicker, community obligation, community dividend and grid connections.

Guidance on the noise aspect of the Guidelines, which is highly technical in nature, is being advanced by my Department in conjunction with DHLGH.  Both Departments are engaged on work regarding the measurement and assessment of noise from wind turbines to ensure they are robust and fit for purpose in line with existing standards and international best practice and having regard to, inter alia, the revised 2030 target to generate up to 80% of our electricity from renewable sources.

The submission referred to by the Deputy was received by the Minister for Housing, Local Government and Heritage as part of the public consultation of the 2019 review of the WEDGs and was subsequently forwarded to my officials for consideration as part of this review, having regard to my Department’s environmental noise remit.

In response to it and a number of other relevant submissions, my Department issued a Request for Tenders for Acousticians, in February of 2023, seeking specialist technical input to inform any amendments to the noise elements of the WEDGs and engaged consultants in April of that year.

DHLGH, in conjunction with my Department, will make any further changes to the draft Guidelines which are deemed necessary or appropriate in the wake of this work, to ensure that the finalised Guidelines, once issued, are fit for purpose to provide guidance in line with renewable energy and climate targets, whilst having appropriate regard to the impacts of wind energy development, including in relation to noise annoyance.

The 2006 Wind Energy Development Guidelines remain in force pending the finalisation of the review process.

Departmental Staff

Ceisteanna (113)

Peadar Tóibín

Ceist:

113. Deputy Peadar Tóibín asked the Minister for the Environment, Climate and Communications the number of staff vacancies, by grade, in his Department at the end of August 2023 and August 2024; and the number of staff, by grade, on a career break of more than five years and more than six years, at the end of August 2023 and August 2024. [44124/24]

Amharc ar fhreagra

Freagraí scríofa

I can confirm to the Deputy the number of staff, by grade, on a career break of more than five years and more than six years, at the end of August 2023 and August 2024 in my Department was zero.

I can confirm to the Deputy the number of staff vacancies, by grade, in my Department at the end of August 2023 and August 2024 in the tables below.

Vacancies as of end of August 2023

Grade

No. of Vacancies

AO

18

AP

8

CO

6

EO

7

HEO

5

Engineer Grade 1

1

Total

45

Vacancies as of end of August 2024

Grade

No. of Vacancies

AO

39

AP

5

CO

2

EO

10

HEO

2

Engineer Grade 2

4

Engineer Grade 1

10

PO

2

Total

74

Departmental Staff

Ceisteanna (114, 116)

Carol Nolan

Ceist:

114. Deputy Carol Nolan asked the Minister for the Environment, Climate and Communications the number of civil servants, by grade, in his Department who were on a career break in 2023 and 2024; the number of those in 2023 and 2024 who were on a career break of five years or more; and if he will make a statement on the matter. [44301/24]

Amharc ar fhreagra

Carol Nolan

Ceist:

116. Deputy Carol Nolan asked the Minister for the Environment, Climate and Communications if he is satisfied that the provisions of the Department of Public Expenditure, National Development Plan Delivery and Reform Circular 4/2013 are being properly implemented by his Department; if he is satisfied that civil servants whose career breaks are coming to an end are being notified of appropriate vacancies; if he is concerned by instances where civil servants are having their career breaks extended unnecessarily where the Department has appropriate vacancies to fill; and if he will make a statement on the matter. [44374/24]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 114 and 116 together.

I can confirm to the Deputy that I am satisfied that the provisions of the Department of Public Expenditure, National Development Plan Delivery and Reform Circular 4/2013 are being properly implemented by my Department and that I am satisfied that civil servants whose career breaks are coming to an end are being notified of appropriate vacancies in my Department through our practices regarding officers returning from long-term leave.

I do not have a concern that civil servants are having their career breaks extended unnecessarily in my Department.

I can confirm to the Deputy the number of civil servants, by grade, in my Department who were on a career break in 2023 of five years or more, was one, a Clerical Officer.

The career break was of five years and 18 days. The career break extend over five years as my Department awaited confirmation that the officer had chosen to leave the civil service rather than return.

The number of civil servants in my Department who were on a career break in 2024 of five years or more, was zero.

I can confirm to the Deputy the number of civil servants, by grade, in my Department who were on a career break in 2023 and 2024, in the tables below.

2023

Grade

 

AO

4

CO

3

EO

1

AP

4

HEO

3

PO

1

Total

16

2024

Grade

 

AO

6

CO

0

EO

0

AP

3

HEO

3

PO

1

Total

13

Air Quality

Ceisteanna (115)

Paul Kehoe

Ceist:

115. Deputy Paul Kehoe asked the Minister for the Environment, Climate and Communications for the most up-to-date regulations on wood-burning, and any future changes coming down the line in relation to wood-burning stoves; and if he will make a statement on the matter. [44346/24]

Amharc ar fhreagra

Freagraí scríofa

The Air Pollution Act 1987 (Solid Fuels) Regulations 2022 (S.I. No. 529 of 2022), which took effect from 31 October 2022, introduced minimum quality standards that apply to all solid fuels distributed throughout the State. This is to ensure that the most polluting fuels can no longer be made available on the Irish market and to assist the public in transitioning to less polluting alternatives.

The Solid Fuel Regulations set technical standards for all solid fuels, including wood. Fuel products which are 100% biomass products, including wood products and wood logs supplied in units of two cubic metres or less, must have a moisture content of less than 25%. Wood logs supplied in units of two cubic metres or more must now be accompanied by a notice outlining the need to store and season wet wood until it is sufficiently dried.

The primary focus of these regulations is on improving air quality and improving people’s health, by restricting the retail, online and commercial sale of smoky fuels, including smoky coal, turf and wet wood. The regulations do not vary between urban and rural areas.

All wood produces air pollution when burned, but wood with a lower moisture content produces less particulates, so it is imperative that only wood with a low moisture content is available for sale. Wet wood can also cause damage to solid fuel appliances. The wood can be air dried and special equipment is not necessarily required. All producers must however be certified and registered with the EPA. More details can be found at EPA.ie/solidfuelregulations and www.gov.ie/pdf/?file=https://assets.gov.ie/289947/4334c78b-4c00-4fe0-9a2f-8ceffe9f6147.pdf#page=null.

At present this Department has no plans to introduce any additional requirements on wood burning stoves which are already regulated under the EcoDesign Directive.

EU regulations mandate that stoves meet specific standards for efficiency and environmental impact. Aligned with the broader Ecodesign Directive, these regulations aim to enhance the overall energy and environmental performance of products.

Ecodesign compliance ensures that products, including stoves, meet minimum efficiency and environmental criteria. SEAI, in its role as the MSA, reviews stoves for compliance with Ecodesign Regulation (EU) 2015/1185 and Energy Labelling Regulation (EU) 2015/1186. See: www.seai.ie/sites/default/files/publications/Ecodesign-compliant-stoves-leaflet-for-consumers.pdf

Question No. 116 answered with Question No. 114.

National Broadband Plan

Ceisteanna (117)

Pearse Doherty

Ceist:

117. Deputy Pearse Doherty asked the Minister for the Environment, Climate and Communications if there are any plans to expand the national broadband plan to the many parts of Donegal that are not featured in the plan currently and are also not currently serviced appropriately by commercial providers; and if he will make a statement on the matter. [44469/24]

Amharc ar fhreagra

Freagraí scríofa

Ireland's Digital Connectivity Strategy, published by my Department, sets ambitious targets, which include providing a Gigabit network to all households and businesses in Ireland by 2028 and access to 5G in all populated areas by 2030.

The National Broadband Plan (NBP) is the government's initiative to deliver high speed broadband services to all premises in Ireland. The mapping consultation between fixed line operators and the Department of the Environment, Climate and Communications was concluded in 2019.

As part of this mapping consultation the three large, fixed line operators (open eir, Virgin Media and Siro) were asked to submit their current High-Speed Broadband (HSBB) coverage maps and potential future maps for HSBB. At the time HSBB was defined as a fixed line technology that could deliver 30Mbps or greater download speed and 6Mbps or greater upload speed.

Resulting from the analysis of this data, the NBI network is deployed to premises in the Intervention Area where HSBB was not going to be delivered by commercial operators. This area has been published on the Department's website since 2019, is AMBER on the Broadband map and is the area where the State-Subsidised network is being deployed. There are no plans for an expansion of the current plan. The NBP targets areas that commercial providers have deemed unfeasible for independent investment.

If State Aid for the deployment of fixed and mobile networks were to be used in areas where market operators would usually choose to invest or have already invested, this could significantly undermine the incentives for private investors to invest in the first place.  State Aid must be targeted towards situations where aid can bring about a material improvement that the market alone cannot deliver.

It would not be appropriate for the Department to comment on specific circumstances in the BLUE areas. Still, we would highlight that operators are required to liaise with ComReg in the event that they decide to withdraw customer services for any commercial reasons, or do not provide a satisfactory service.

National Broadband Ireland (NBI) are connecting circa 4,200 homes each month. I am advised by NBI that over 304,606 premises are passed across 26 counties and available for immediate connection, which is over half the premises in the Intervention Area. Over 102,651 premises are already connected to the National Broadband Plan high-speed broadband network. 

In the Deputy’s own county of Donegal over 11,942 premises are passed with a high-speed fibre broadband network and 13,364 available to order/pre-order, with 2,684 premises now connected.   A further 22,058 premises within Donegal will be passed by NBI’s fibre broadband by the end of the contract.

Further details are available on specific areas within County Donegal and can be monitored via nbi.ie/reps. NBI has a dedicated email address, reps@nbi.ie, which can be used by Oireachtas members for specific queries.   

Along with the NBP intervention contract, progress is being made by commercial operators’ in expanding their next generation networks throughout the State and ensuring the targets set out in the Digital Connectivity strategy are achieved.  

Open eir have already passed over 60,714 homes and businesses in Donegal with gigabit services, with plans to pass a further c.15,893 homes and businesses over the next 2 – 3 years.  Commercial operator SIRO are also continuing to increase their network footprint right across Donegal having passed over 20,052 premises for full fibre.

Renewable Energy Generation

Ceisteanna (118)

Cian O'Callaghan

Ceist:

118. Deputy Cian O'Callaghan asked the Minister for the Environment, Climate and Communications if the solar electricity grant for solar PV panels will be reduced in 2025; the date range for grant applications; and if he will make a statement on the matter. [44486/24]

Amharc ar fhreagra

Freagraí scríofa

The Microgeneration Support Scheme (MSS) was approved by Government on 21 December 2021, to support Ireland’s ambitious targets for micro-generation installations, under the Climate Action Plan. The MSS provides support to both domestic and non-domestic applicants, in the form of grants for Solar PV installations, up to a maximum of €2,100 in 2024 for household installations, available through the Sustainable Energy Authority of Ireland (SEAI).

In line with the approved final scheme design, the maximum grant was set at €2,400 for 2022 and 2023, with a reduction of €300 for each subsequent year until 2028. This resulted in the maximum grant being set to €2,100 in 2024, and this will decrease again to €1,800 from 1 January 2025. Grant applications made and approved by 31 December 2024 will be eligible to receive the current maximum grant. Once approval is secured, applicants have eight months to complete works and submit the necessary documents to SEAI in order to receive grant payment. After this period, the approval will expire, and re-application will be required.

The decision to gradually reduce the maximum grant available was taken to account for the expected reduction in solar PV system costs (which has proved to be the case over the course of the Micro-generation Support Scheme's operation), as well as to ensure the maximum number of households can be supported, through the most efficient use of limited exchequer funds. Solar PV installations have also been supported by the Government decision to apply a zero rate of VAT on residential solar 'supply and install' contracts since May 2023, which has further reduced the upfront cost required by households investing in solar PV.

National Broadband Plan

Ceisteanna (119)

Niamh Smyth

Ceist:

119. Deputy Niamh Smyth asked the Minister for the Environment, Climate and Communications to review a case (details supplied); and if he will provide an update on fibre broadband in this instance. [44493/24]

Amharc ar fhreagra

Freagraí scríofa

The National Broadband Plan (NBP) is the government's initiative to deliver high speed broadband services to all premises in Ireland.

The premises in question is in the BLUE area on the broadband map which is available on my Department's website:www.gov.ie/en/publication/5634d-national-broadband-plan-map/

The BLUE area represents those areas where commercial providers are either currently delivering or have plans to deliver high-speed broadband services. The Department defines high-speed broadband as a connection with minimum speeds of 30Mbps download and 6Mbps upload.

The activities of commercial operators delivering high-speed broadband within BLUE areas are not planned or funded by the State and the Department has no statutory authority to intervene in that regard.

There may be a choice of operators offering this service in any given area. Further information in this regard is available at www.comreg.ie/compare/#/services.

If a person lives in the BLUE area and after contacting their Retail Service Provider are told they cannot get access to greater than 30Mbps, they should raise a query via the Department of Environment, Climate and Communications (DECC) webform, at secure.dccae.gov.ie/forms/NBP-Customer-Service.aspx, and the department will escalate with the commercial operator to investigate this matter further.

As per records available the premises in question can now order full fibre gigabit connection with speeds up to 2Gbps. This information and details of retail broadband providers who deliver broadband to premises in the blue area can be found on the Open eir website, at open-eir.webflow.io/fibre/broadband-checker.

Departmental Schemes

Ceisteanna (120, 121)

Darren O'Rourke

Ceist:

120. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications the average waiting time to access the warmer homes scheme in 2020, 2021, 2022, 2023 and to date in 2024; and if he will make a statement on the matter. [44525/24]

Amharc ar fhreagra

Darren O'Rourke

Ceist:

121. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications the average waiting list time as part of the warmer homes scheme, broken down by country in the years 2020, 2021, 2022, 2023 and to date in 2024; and if he will make a statement on the matter. [44539/24]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 120 and 121 together.

The Sustainable Energy Authority of Ireland (SEAI) operates the Warmer Homes Scheme on behalf of my Department. Delivering free energy upgrades to low-income households in or at risk of energy poverty is a top priority for the Government. Since 2000 over 161,190 homes have been upgraded under this scheme.

In recent years, the scheme has delivered a greater volume of deeper and more complex upgrades. This is reflected in the average cost of upgrades which have seen an almost tenfold increase from €2,600 in 2015 to €26,464 in 2024. These deeper upgrades mean that more lower income homeowners are benefitting to a far greater extent from the scheme. However, it is important to acknowledge that deeper retrofits take longer to complete.

The improvement in the upgrades provided under the scheme in tandem with increased awareness of the multiple benefits of retrofit are driving significantly increased levels of demand. Approximately 24,000 applications from homeowners were received in 2022 and 2023 combined and 10,511 applications to date in 2024.

Data provided by the SEAI on timelines for the programme is at a national level. The table below sets out the average waiting time by year for the scheme.

Year

2020

2021

2022

2023

2024

Waiting time in months

18-24

26

26

20

17

It is important to note that the scheme was impacted significantly by construction sector closures and restrictions on home visits associated with COVID-19 in recent years which resulted in a build-up of applications.

Significant reductions in the average waiting time for works to be completed have been achieved this year, reducing from 26 months in 2022 to 17 months for the worst performing homes (rated E, F and G) for homes completed so far in 2024.

This has been achieved in part through the following actions taken to reduce the timeline to completion and increase output under the scheme:

• SEAI has been allocated additional staff for the Warmer Homes Scheme.

• SEAI work to increase contractor output through active contract engagement and management.

• Actions to address ongoing supply chain and inflationary pressures.

• A record budget allocation of €208.8m for 2024.

• European Regional Development Fund (ERDF) funding of €264 million has been secured for the period 2021 until 2027 to supplement Exchequer funding for the Scheme.

• A new €700 million contractor panel has been put in place for the next 4 years, which has increased contractor capacity to 36.

Budget 2025 announced record funding for residential and community energy upgrades which will be supplemented by an increased allocation from the European Regional Development Fund (ERDF), and will increase the Warmer Homes Scheme budget to €240 million. The 2025 allocation for the scheme represents a 10-fold increase on the 2020 expenditure figure.

My officials continue to work with SEAI to maximise and accelerate the output of free energy upgrades provided under this scheme.

Question No. 121 answered with Question No. 120.

Waste Management

Ceisteanna (122, 123)

Darren O'Rourke

Ceist:

122. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications if he is aware of the recently published report from the Dublin Taskforce (details supplied); if he is aware that one of the reports key recommendations was to “move to a single waste provider in the city centre via a tender process”; the assessments, if any, that his Department has carried out regarding the implementation of this model; and if he will make a statement on the matter. [44540/24]

Amharc ar fhreagra

Darren O'Rourke

Ceist:

123. Deputy Darren O'Rourke asked the Minister for the Environment, Climate and Communications if he is aware of the recently published report of the Joint Committee on the Environment and Climate Action on the circular economy; if he is aware of recommendation 42 that the committee recommends that his Department supports the establishment of a pilot scheme in Dublin City local authority to re-municipalise waste following Dublin City Council’s adoption of a cross-party composite motion calling for the re-municipalisation of household waste services in July 2019; the assessments, if any, his Department has carried out regarding the implementation of this model; and if he will make a statement on the matter. [44541/24]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 122 and 123 together.

Local Authority Executives are statutorily responsible for municipal waste collection and waste management planning within their functional areas. It is open to the Chief Executive of any local authority to exercise their executive function in relation to waste collection to re-enter the waste collection market as direct service providers if they so choose, either alongside existing permitted service providers or subject to making arrangements to replace those providers. 

Under section 60(3) of the Waste Management Act 1996 I am, as Minister, precluded from exercising any power or control in relation to the performance by a local authority, in particular circumstances, of a statutory executive function vested in it.

The Deputy may wish to note that I will shortly commission a comprehensive study to explore the feasibility, potential benefits and risks associated with transitioning our waste collection system from its current model of side-by-side market competition to a franchise tendering system for local authority areas or regions.

Question No. 123 answered with Question No. 122.

Public Sector Pensions

Ceisteanna (124)

Paul Kehoe

Ceist:

124. Deputy Paul Kehoe asked the Minister for the Environment, Climate and Communications if he supports the streamlined process for pension increases to ensure fair and timely adjustments for retired members; and if he will make a statement on the matter. [44552/24]

Amharc ar fhreagra

Freagraí scríofa

Under section 46 of the Postal and Telecommunications Services Act 1983, the Minister for the Environment, Climate and Communications, with the concurrence of the Minister for Public Expenditure, NDP Delivery and Reform, approves any superannuation schemes submitted by An Post. 

In accordance with the act and the relevant Code of Practice for the Governance of State Bodies, An Post must seek Ministerial approval from both MECC and MPENDR to increase pensions and deferred pensions. It should be recognised that the time taken for the pension approval process is necessary to ensure that robust governance procedures are in place.

The operation of the schemes is a matter between the management of An Post, staff representatives and the trustees of the schemes.

Public Sector Pensions

Ceisteanna (125)

Michael Healy-Rae

Ceist:

125. Deputy Michael Healy-Rae asked the Minister for the Environment, Climate and Communications further to Parliamentary Question No. 121 of 2 May 2024, if he will provide an update on the status of a pension for a person (details supplied); and if he will make a statement on the matter. [44553/24]

Amharc ar fhreagra

Freagraí scríofa

I can confirm to the Deputy that my Department has been unable to locate any documentation that corresponds with the person's details he has provided.

If the Deputy, or the named person, wish to contact my Department's HR team directly and provide them with more biographical detail, my Department may be in a position to broaden the search of the pension records.

Fisheries Protection

Ceisteanna (126)

Mairéad Farrell

Ceist:

126. Deputy Mairéad Farrell asked the Minister for the Environment, Climate and Communications if the use by anglers of replica dead baits and-or dead bait imitation lures is allowed under the recently signed Waterford Fisheries District, (River Barrow) Angling Limitations during Salmon Spawning Run Bye-Law No. 1011, 2024; and if he will make a statement on the matter. [44557/24]

Amharc ar fhreagra

Freagraí scríofa

As recently set out to the Deputy in my reply to Question 139 of 22 October 2024, the purpose of Waterford Fisheries District, (River Barrow) angling limitation during salmon spawning run Bye-Law No. 1011, 2024 is to prevent anglers catching pre-spawned salmon stocks during their migration to spawning grounds through the River Barrow system or returning kelts - during the months of January, October, November and December each year. Over a period of time, such fish have become the target of increased illegal fishing activity along this stretch of the River Barrow. Given the declining status of salmon generally and in the River Barrow in particular, it was critical that I made and introduced this byelaw as a necessary conservation, protection and management measure. This bye-law was introduced to afford an additional protection measure to salmon by prohibiting angling, other than angling with dead bait. It was deemed that dead baiting is unlikely to target accidental catching of salmon.

All artificial bait is prohibited under this Bye-law. Artificial or replica dead baits and dead bait imitation lures are designed as lures, and therefore, are prohibited as they may be attractive to salmon.

Fisheries Protection

Ceisteanna (127)

Mairéad Farrell

Ceist:

127. Deputy Mairéad Farrell asked the Minister for the Environment, Climate and Communications the reason there were glaring inconsistencies in due diligence for the two local by-laws governing salmon conservation in Natura 2000 sites (details supplied); and if he will make a statement on the matter. [44558/24]

Amharc ar fhreagra

Freagraí scríofa

In 2018, IFI launched the IFI Environmental Assessment Process (EAP) which aimed to facilitate fisheries development and conservation projects while ensuring that IFI had due regard for the environment and relevant environmental legislation. This process established the screening mechanisms for the environmental assessment of projects and set out the appropriate IFI procedures to ensure that works were carried out in compliance with the relevant environmental legislation.

Following the roll out of this process, it was decided to apply it to other areas of IFI activity based on a precautionary approach where the advice that IFI gives could be considered to give consent to certain activities. This process was rolled out for advice that IFI gives in respect of bye-law proposals after the establishment of the EAP in 2018. This explains why the Designated Salmonid Waters Bye-Law (No. 964) 2018 which was drafted in 2018 was not assessed and the Bye-law referred to in 2019 was assessed.  

IFI has established a specific email address for queries from Oireachtas members so that queries in relation to operational matters such as carrying out Appropriate Assessment Screenings where appropriate, can be addressed promptly, in line with IFI’s objective to deliver services to the highest standards. The email address is oireachtas@fisheriesireland.ie.

Fisheries Protection

Ceisteanna (128)

Mairéad Farrell

Ceist:

128. Deputy Mairéad Farrell asked the Minister for the Environment, Climate and Communications the reason no regulatory impact analysis screenings were conducted on the following two by-laws; the Conservation of Pike Bye-Law (No. 809) 2006 and the Conservation and Prohibition on Sale of Coarse Fish Bye-Law (No. 806) 2006, when a multitude of screenings were conducted by his Department from 2006 to 2008 on both primary and secondary legislation; and if he will make a statement on the matter. [44559/24]

Amharc ar fhreagra

Freagraí scríofa

My Department applies the principles set out in the Regulatory Impact Analysis (RIA) Guidelines issued by the Department of the Taoiseach where appropriate.

Paragraph 1.1 of those Guidelines refer to the applicability of RIAs to, inter alia, proposals for primary legislation involving changes to the regulatory framework and significant Statutory Instruments. There is no reference to any applicability to carry out RIAs in respect of bye-laws in these guidelines.

Moreover, these guidelines setting out requirements regarding the carrying out and applicability of RIAs were published in 2009 and the making of the two bye-laws referred to by the Deputy predate their publication.

National Broadband Plan

Ceisteanna (129)

Michael Healy-Rae

Ceist:

129. Deputy Michael Healy-Rae asked the Minister for the Environment, Climate and Communications to provide an update on fibre broadband (details supplied); and if he will make a statement on the matter. [44612/24]

Amharc ar fhreagra

Freagraí scríofa

Ireland's Digital Connectivity Strategy, published by my Department, sets ambitious targets, which include providing a Gigabit network to all households and businesses in Ireland by 2028 and access to 5G in all populated areas by 2030.

The National Broadband Plan (NBP) is the government's initiative to deliver high speed broadband services to all premises in Ireland.

The Question refers to a premises located in the AMBER area on the broadband map, which is available on my Department's website at www.gov.ie/en/publication/5634d-national-broadband-plan-map/. The AMBER area is to be served by the network deployed under the NBP State led intervention.

Commercial Fixed line operators Open Eir, Virgin Media and SIRO are delivering high-speed broadband services in the blue area/ non-intervention area of the map.

The latest information on when high-speed broadband will become available to this area can be found on National Broadband Ireland’s (NBI) website at nbi.ie/map/. This website is regularly updated providing the expected timeline for delivery and status of any works that are initiated at any point in time. NBI also has a dedicated email address, reps@nbi.ie, which can be used by Oireachtas members for specific queries.  

NBI have advised my Department that they have faced challenges in connecting the laneway that the referred premises is located on which has affected the anticipated connection timeframe. When a routine appointment took place, it was identified that an additional survey appointment was required, in addition to 2 private poles and 1 private duct being needed to connect this particular premises. NBI are presently not in a position to provide a date for when civil works will commence.

Neighbouring premises further down the lane, have not ordered fibre broadband with a Retail Service Provider, and with poles being refused on this laneway the connection would need to go underground (via duct). There is a significant amount of work to be completed to bring service to the other premises before the connection can proceed, this work will not progress unless orders for fibre broadband are placed.

Roinn