I propose to take Questions Nos. 49 and 56 together.
I can advise the Deputy that the following accommodation projects at an estimated cost of some €60m are being progressed or completed during 2025 will provide 715 beds with a further €12.5m being provided to the Defence Forces on a fully delegated basis for the purposes of maintenance of the current building stock.
• Refurbishment of Blocks A, B, D, E & F, Stephens Barracks
• Refurbishment of Block 4 Haulbowline
• Refurbishment of Old Communications Building, Haulbowline
• Refurbishment of Cadet Mess Building Haulbowline
• Gormanston Camp - New Accommodation Block
• DFTC, Provision of New Student Accommodation
• DFTC, Refurbishment of Ceannt Block 1
• Gormanston Camp – Upgrade Block A
• Casement Aerodrome Modular Accommodation
• Casement Aerodrome New Accommodation
• Collins Barracks – Refurbishment of Block 1
• Cathal Brugha Barracks – Refurbishment of C House