Defence Forces

Dáil Éireann Debate, Tuesday - 17 June 2025

Tuesday, 17 June 2025

Ceisteanna (176)

Seán Ó Fearghaíl

Ceist:

176. Deputy Seán Ó Fearghaíl asked the Tánaiste and Minister for Defence the current capital works that are ongoing at present at Curragh Camp; when each of those projects will be completed; and the estimated cost of each project, in tabular form. [31967/25]

Amharc ar fhreagra

Freagraí scríofa

The following are the current capital works that are ongoing at the DFTC, Curragh Camp. Below sets out the various stages of construction, tender procurement, design or planning of each project, the estimation completion and estimate cost.

Project

Project Status

Estimated Completion

Estimated Cost (incl. VAT)

CIS workshops / store

Construction

2026

€8.6M

Transport Body Workshop and Ancillary Offices Electrical Upgrade

Letter of Intent Issued

2026

€0.7M

ARW - New HQ Block

Live on etenders

2026

€13.8M

ARW Training Centre Roofing (Old Cinema)

Live on etenders

2026

€0.6M

1 Block Ceannt Accommodation Refurbishment

Design Team Evaluation

2027

€3M

LED External Street Lighting Conversion

Design / Planning

2026

€0.9M

Military College Auditorium Suite

Design / Planning

2027

€6.5M

Military Medical Facility and Medical School Upgrade

Design / Planning

2027

€6.8M

New Bonded Warehouse Building NSRC

Design / Planning

2027

€3.5M

West Side Locker Facility

Design / Planning

2028

€1.5M

New Student Accommodation Facility

Design / Planning

2028

€14M

The Deputy may also wish to know that the following capital works were completed since 2020 for the DFTC at a total cost of €16.3M.

• New Vehicle Garaging Facility

• New Vehicle Garaging – Coolmoney Camp

• Engineer Logistics Office

• ARW Enabling Works

• Cadet School HQ

• St Bricins Re Location - Barracks Services Engineer Store

• Provision of a new Electric Target Range

• Upgrade of Block 7, Plunkett Barracks Accommodation

In addition, my Department also allocates funding each year to the Defence Forces for the maintenance, repair and upkeep of its building stock. This year a devolved budget of €12.5 million was assigned by my Department to the Defence Forces for these tasks. The individual prioritisation of specific projects to be carried out is solely a matter for the Defence Forces in keeping with the delegated nature of this budget.