Written Answers Nos. 21-40

Departmental Schemes

Ceisteanna (21, 22, 23, 24, 25, 26, 27)

Michael Murphy

Ceist:

21. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment if he will provide a copy of the current performance delivery agreement (PDA) between his Department and the Sustainable Energy Authority of Ireland; the specific performance indicators, reporting obligations, and governance arrangements contained within the PDA relating to the operation of the warmer homes scheme; and if he will make a statement on the matter. [67328/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

22. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment if his Department has a formal service level agreement (SLA) in place with the Sustainable Energy Authority of Ireland specifically governing the administration, quality assurance, contractor performance, and homeowner service standards under the warmer homes scheme; if so, if he will provide the details of this SLA; and if not, the reason such an agreement is not in place. [67329/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

23. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment whether any structured or contractual service-level metrics, such as delivery timeframes, inspection rates, defect remediation requirements, and customer service standards, exist between his Department and the Sustainable Energy Authority of Ireland in respect of the warmer homes scheme; and if not, the way in which his Department monitors and ensures performance and accountability under the scheme. [67330/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

24. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment the governance arrangements that existed between his Department and the Sustainable Energy Authority of Ireland prior to the establishment of the current performance delivery agreement (PDA); and whether any formal agreements, contracts, or service-level frameworks applied to the warmer homes scheme before the PDA was introduced. [67331/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

25. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment how compliance with the performance delivery agreement is monitored with respect to the warmer homes scheme; the frequency of reporting by SEAI; the KPIs relating to scheme delivery; and whether any performance concerns have been raised with SEAI in the past three years. [67332/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

26. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment if the performance delivery agreement, or any related agreements between the Department and SEAI, specify consequences or corrective-action mechanisms for underperformance by SEAI or contracted installers under the warmer homes scheme; and if he will provide details of any such provisions. [67333/25]

Amharc ar fhreagra

Michael Murphy

Ceist:

27. Deputy Michael Murphy asked the Minister for Climate, Energy and the Environment if he will publish the current performance delivery agreement, and any associated service-level or performance-monitoring documents, relating to the warmer homes scheme; and if not, the reason for withholding same. [67334/25]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 21 to 27, inclusive, together.

An Oversight Agreement (OA) 2023-2026 was drawn up by my Department in partnership with the Sustainable Energy Authority of Ireland (SEAI) in accordance with the 2016 Code of Practice for the Governance of State Bodies. This Agreement sets out the broad governance and accountability framework within which the SEAI operates, and defines the key roles, responsibilities and interactions that underpin its relationship with my Department.

The Performance Delivery Agreement (PDA) was introduced in 2024 as the new format for the performance contract between my Department and the SEAI. Previously, a Service Level Plan specified the level of service to be delivered by the SEAI. The PDA is in line with the structure and content outlined in the 2016 Code of Practice, allows for the adoption of both annual and multi-annual targets, and is updated annually. The OA and PDA are not routinely published.

The OA between my Department and the SEAI requires that a monthly programme meeting is held between the SEAI and my officials to provide insights into operational metrics and deliverables relative to the residential and community retrofit schemes. Specifically for the Warmer Homes Scheme, the OA requires that the monthly meeting deals with key governance matters, including spend to date, projected outturn, performance against KPIs, updates on key risks, and programme development.

The PDA provides the overall structure for the monitoring and oversight of these deliverables. A series of year-specific annexes are used to define the output including performance indicators for the scheme in relation to energy savings, greenhouse gas emissions mitigation, numbers of homes upgraded, numbers of homes upgraded to BER B2 and above, and number of heat pumps installed. These annexes form the basis of the monthly governance meetings between my Department and the respective business units in the SEAI, and allow for detailed discussions on performance. The PDA requires that pre-meeting materials must include a review of KPIs and targets.

In addition to the monthly governance meetings, there are two formal meetings (the Strategic and Oversight Meeting) per annum to review performance against the PDA targets. These meetings are chaired by the relevant Assistant Secretary from my Department and are attended by my officials and senior management in the SEAI.

Contractors operating under the Better Energy Warmer Homes Scheme are subject to the SEAI's Domestic Technical Standards and Specifications, the Better Energy Homes Contractor’s Code of Practice, and the Better Energy Homes Quality Assurance and Disciplinary Procedures for Contractors. Requirements in relation to performance, inspections, remediation and addressing non-compliance are set out in these documents. The SEAI continuously monitor the performance of all contractors operating on the Warmer Homes Scheme, including in relation to quality, level of complaints, timelines, and general administration.

Question No. 22 answered with Question No. 21.
Question No. 23 answered with Question No. 21.
Question No. 24 answered with Question No. 21.
Question No. 25 answered with Question No. 21.
Question No. 26 answered with Question No. 21.
Question No. 27 answered with Question No. 21.

Solar Energy Guidelines

Ceisteanna (28)

Sorca Clarke

Ceist:

28. Deputy Sorca Clarke asked the Minister for Climate, Energy and the Environment if he will clarify the communication processes in place to ensure that households on the Priority Services Register are made aware of their eligibility for government funded solar PV installation. [67430/25]

Amharc ar fhreagra

Freagraí scríofa

The Solar PV for the Medically Vulnerable Scheme is a targeted scheme for the installation of solar photovoltaic (PV) panels for customers/households who are registered on the life support category of the Priority Services Register. These homes have a dependence on electrically powered equipment, including medical equipment, life protecting devices and assistive technologies such as dialysis machines or respirators. As a result, these households may have a higher energy demand than the average user and this scheme is designed to go some way towards helping to reduce those energy costs.

The scheme is operated by the Sustainable Energy Authority of Ireland (SEAI) in conjunction with energy suppliers, with each energy supplier contacting their own eligible customers directly in line with the work plans for their Solar PV installers. Eligible households can avail of a fully funded 2 kWp solar PV system including survey/design, supply, installation, and the post works BER. It is important to note that suppliers, who manage the administrative aspects of the scheme under the SEAI, issue offers to eligible homeowners in batches.

The Solar PV for the Medically Vulnerable Scheme was designed in 2022 using the Households/MPRNs on the Life Support Category of the Priority Services Register as maintained by ESB Networks at that time.

Due to the strong uptake and the positive impact already observed in over 470 homes, the scheme is now in the process of being extended to include as eligible all homeowners who are registered under the Life Support Category of the Priority Services Register with their energy supplier, regardless of when they were registered.

Energy suppliers will communicate this update to eligible customers as the eligibility criteria are revised, and qualifying homeowners are identified to benefit from the scheme.

Departmental Reviews

Ceisteanna (29)

Pa Daly

Ceist:

29. Deputy Pa Daly asked the Minister for Climate, Energy and the Environment to provide an update on the land use review; and if he will make a statement on the matter. [67452/25]

Amharc ar fhreagra

Freagraí scríofa

Phase 2 of the national land use review was recommitted to in the Programme for Government 2025: Securing Ireland’s Future. The first phase was published in March 2023 and focused on evidence gathering. This earlier phase was led by the EPA.

The Final Report for Phase 2, which is entitled A Living Land, has been received by the Minister for Agriculture, Food and the Marine, Martin Heydon; the Minister of State at Housing, Local Government and Heritage, Christopher O'Sullivan; and myself to consider. I have also been briefed on the Review by Geraldine Tallon, the independent Chair of the Oversight Group.

Phase 2 has sought to compile an evidence base to inform and support landholders and policymakers in their future decisions for land-use in the context of achieving Ireland’s agricultural, socioeconomic, climate and environmental objectives.

A Living Land is not an articulation of government policy or strategy in relation to land use, given that there are many economic, environmental, and social considerations to be balanced in considering land use. Rather, this report will help to inform and support future considerations in this complex area. The report also highlights the important role that Government can play in, for example, leadership in leveraging the role of State-owned lands to achieve integrated land use objectives.

I am working with my Ministerial colleagues with a view to publishing the Report shortly.

Artificial Intelligence

Ceisteanna (30)

Malcolm Byrne

Ceist:

30. Deputy Malcolm Byrne asked the Minister for Climate, Energy and the Environment the type of training provided to staff within his Department in the use of, or understanding of artificial intelligence; if a programme is planned for all staff on their obligations under the EU Artificial Intelligence (AI) Act; and if he will make a statement on the matter. [67457/25]

Amharc ar fhreagra

Freagraí scríofa

My Department continues to take advice from the National Cyber Security Centre in respect of the use of artificial intelligence (AI) and are following recommendations provided in June 2023.

As part of any future use of AI, my Department will be aligned to the Guidelines for the Responsible Use of AI in the Public Service which were published by the Department of Public Expenditure, Infrastructure, Public Service Reform and Digitalisation in 2025. Central training supports on the Guidelines for the Responsible Use of AI in the Public Service, including eLearning content, is available to all staff.

My Department is also investigating additional supplementary supports that may compliment these central supports in future training needs of staff in the Department in use of and understanding of AI.

All training and supports targeted by the Department will be reviewed and aligned necessarily with the obligations under the EU Artificial Intelligence (AI) Act, which is under the remit of the Department of Enterprise, Tourism and Employment..

Environmental Schemes

Ceisteanna (31)

Joe Cooney

Ceist:

31. Deputy Joe Cooney asked the Minister for Climate, Energy and the Environment if he will provide details of the number of SMEs that have participated in the business energy upgrade scheme since its inception; and a breakdown of the measures supported, by county, in tabular form; and if he will make a statement on the matter. [67622/25]

Amharc ar fhreagra

Freagraí scríofa

The Business Energy Upgrades Scheme is funded by my Department and administered by the Sustainable Energy Authority of Ireland (SEAI) as part of a suite of business supports. In 2024 alone, the SEAI Business Supports provided grant support of over €40 million to over 3,000 businesses significantly supporting energy cost reduction, competitiveness, and emissions reduction.

The Business Energy Upgrades Scheme was opened for applications in November 2024 and offers businesses access to rapid approval grant funding for a range of retrofit measures for buildings such as hotels, offices, retail and restaurants. There has been strong activity on the application portal with a large volume of draft applications (over 550) as people review the potential options. Typically, some time is required by the commercial sector to prepare the necessary details before submitting the application. 167 applications have been approved with a combined total in offers of €2.99 million supporting a total of 304 measures. All nine measures available are represented within this package of applications which is a good initial indicator of the public’s interest in the overall suite of technologies provided.

The Business Energy Upgrades Scheme is critical to supporting a higher rate of commercial building retrofit and is expected to double the number of commercial building retrofits and heat pumps supported from 2024 to 2025.

A table showing the breakdown by county is attached.

A county breakdown, with number of businesses per county, is in the table beneath:

County

€ Potential Grant Amount

Businesses

Dublin

€ 975,650.36

24

Cork

€ 345,738.11

21

Waterford

€ 310,685.86

11

Cavan

€ 222,965.33

5

Galway

€ 150,480.55

8

Louth

€ 140,962.46

4

Carlow

€ 131,232.16

4

Kilkenny

€ 122,404.50

2

Meath

€ 103,965.93

4

Sligo

€ 99,901.25

5

Clare

€ 73,798.00

2

Kerry

€ 54,119.29

4

Tipperary

€ 39,296.20

2

Limerick

€ 37,220.00

4

Longford

€ 33,853.00

3

Laois

€ 27,543.50

1

Donegal

€ 25,703.57

4

Roscommon

€ 23,569.37

1

Kildare

€ 20,028.54

2

Offaly

€ 19,098.00

4

Monaghan

€ 14,459.00

4

Wexford

€ 12,320.00

2

Wicklow

€ 3,080.00

1

Total

€ 2,988,074.98

122

Angling Sector

Ceisteanna (32)

Conor Sheehan

Ceist:

32. Deputy Conor Sheehan asked the Minister for Climate, Energy and the Environment his plans to change the rules governing the logbook for salmon or sea trout angling, allowing anglers to retrospectively produce a logbook as was the case previously; and if he will make a statement on the matter. [67681/25]

Amharc ar fhreagra

Freagraí scríofa

The Wild Salmon and Sea Trout Tagging Scheme Regulations 2018 (S..I. No. 585/2018) as amended, inter alia, provide for measures regarding the use of logbooks for salmon and sea trout angling.

Currently, I have no plans to amend these provisions dealing with logbooks.

Question No. 33 answered with Question No. 19.
Question No. 34 answered with Question No. 19.

Programme for Government

Ceisteanna (35)

Frankie Feighan

Ceist:

35. Deputy Frankie Feighan asked the Minister for Climate, Energy and the Environment the progress made over the past 12 months on each of his Department’s Programme for Government commitments, in tabular form; and if he will make a statement on the matter. [67817/25]

Amharc ar fhreagra

Freagraí scríofa

The attached table sets out the progress made on key Programme for Government (PfG) commitments under the remit of the Department of Climate, Energy and the Environment, over the past 12 months. The key PfG commitments are grouped, as appropriate, to the relevant goals from the Department’s Statement of Strategy, Le Chéile 28, which was published in September 2025. These strategic goals are strongly aligned to key commitments in the Programme for Government 2025.

Significant progress has been made against key Programme for Government commitments under the remit of my Department in 2025, and the Department will continue our critical work to ensure the future successful delivery of commitments. The progress made by my Department in delivering on the Statement of Strategy, including the implementation of key Programme for Government commitments, is captured in Annual Reports which are available on gov.ie.

PfG Progress Update December 2025

Environmental Schemes

Ceisteanna (36)

Micheál Carrigy

Ceist:

36. Deputy Micheál Carrigy asked the Minister for Climate, Energy and the Environment the date on which the Government-approved scheme to provide free 2kWp solar PV systems to Priority Services Register (PSR) households was formally approved; the date on which ESB Networks and energy suppliers were instructed to begin notifications to eligible households; the number of households notified to date; and the number of installations completed under the scheme. [67824/25]

Amharc ar fhreagra

Freagraí scríofa

The Solar PV for the Medically Vulnerable Scheme is a targeted scheme for the installation of solar photovoltaic (PV) panels for customers/households who are registered on the life support category of the Priority Services Register. These homes have a dependence on electrically powered equipment, including medical equipment, life protecting devices and assistive technologies such as dialysis machines and respirators.

The scheme comprises of a fully funded 2 kWp solar PV system for eligible households. This includes survey/design, supply, installation, and the post works BER. The scheme is wholly managed by the registered energy suppliers, with each of the energy suppliers contacting their own eligible customers directly, in line with the work plans for their solar PV installers. It is important to note that suppliers, who manage the administrative aspects of the scheme under the Sustainable Energy Authority of Ireland (SEAI), issue offers to eligible homeowners in batches.

Most energy suppliers have agreed to provide the scheme for their customers, with some suppliers more advanced in their programme than others. The SEAI report that 137 systems were installed in 2024. However, with the programme now ramping up, 239 systems have been installed so far in 2025, with a further 250 applications currently in progress across various stages, ranging from committed applications to booked installations and ongoing works, among the 4 suppliers currently participating in the scheme.

The Solar PV for the Medically Vulnerable Scheme was designed in 2022 using the Households/MPRNs on the Life Support Category of the Priority Services Register as maintained by ESB Networks at that time. The scheme became operational in February 2023 when suppliers were invited to participate.

Due to the strong uptake and the positive impact already observed in over 470 homes, the scheme is now in the process of being extended to include as eligible all homeowners who are registered under the life support category of the Priority Services Register with their energy supplier, regardless of when they were registered.

Energy suppliers will communicate this update to eligible customers in the coming weeks, as the eligibility criteria are revised, and qualifying homeowners are identified to benefit from the scheme.

Environmental Schemes

Ceisteanna (37)

Micheál Carrigy

Ceist:

37. Deputy Micheál Carrigy asked the Minister for Climate, Energy and the Environment to establish a retrospective or exceptional circumstances mechanism to provide reimbursement or partial compensation to Priority Services Register households who installed solar PV systems at their own expense before receiving notification of their eligibility for the free Government-funded scheme; and if he will make a statement on the matter. [67825/25]

Amharc ar fhreagra

Freagraí scríofa

The Solar PV for the Medically Vulnerable Scheme is a targeted scheme for the installation of solar photovoltaic (PV) panels for customers/households who are registered on the life support category of the Priority Services Register. These homes have a dependence on electrically powered equipment, including medical equipment, life protecting devices and assistive technologies such as dialysis machines or respirators. As a result, these households may have a higher energy demand than the average user and this scheme is designed to go some way towards helping to reduce those energy costs.

The Solar PV for the Medically Vulnerable Scheme was designed in 2022 using the Households/MPRNs on the Life Support Category of the Priority Services Register as maintained by ESB Networks at that time. The scheme became operational in February 2023 when suppliers were invited to participate. The scheme is operated by the Sustainable Energy Authority of Ireland (SEAI) in conjunction with energy suppliers, with each energy supplier contacting their own eligible customers directly in line with the work plans for their solar PV installers. Eligible households can avail of a fully funded 2 kWp solar PV system including survey/design, supply, installation, and the post works BER.

The scheme is not designed to be retrospective and is to supply a new installation to a property that did not previously have solar PV, directly installed. There is no mechanism to provide payments to homeowners under this scheme.

Departmental Funding

Ceisteanna (38, 39, 40)

Barry Ward

Ceist:

38. Deputy Barry Ward asked the Minister for Climate, Energy and the Environment if his attention has been drawn to the work of a charity (details supplied); the actions he will take to ensure they are supported financially to ensure that they can continue their vital work; and if he will make a statement on the matter. [67852/25]

Amharc ar fhreagra

Barry Ward

Ceist:

39. Deputy Barry Ward asked the Minister for Climate, Energy and the Environment if his attention has been drawn to the funding shortfall for a charity (details supplied); if he could outline any funding options available to them to ensure that they can remain in operation; and if he will make a statement on the matter. [67855/25]

Amharc ar fhreagra

Barry Ward

Ceist:

40. Deputy Barry Ward asked the Minister for Climate, Energy and the Environment if he will engage with a charity (details supplied) in relation to the long-term funding of their work; and if he will make a statement on the matter. [67858/25]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 38, 39 and 40 together.

I actively encourage communities to engage in beach cleaning and coastal protection measures. My Department funds the Clean Coasts programme operated by An Taisce which has received support for a number of years.

The Clean Coasts programme includes over 2,500 groups drawn from communities, businesses, sporting groups and educational bodies with over 45,000 volunteers involved around the country. I encourage individuals and groups to engage with Clean Coasts, who can support them with training and equipment and connect them with their local authority to manage the waste gathered.

Clean Coasts volunteer groups can also engage with other coastal protection voluntary actions such as protection of dues thorough marram grass planting, and An Taisce provide a wide range of awareness raising activities for communities in relation to our marine and coastal environment.

Question No. 39 answered with Question No. 38.
Question No. 40 answered with Question No. 38.
Roinn