National Parks

Dáil Éireann Debate, Tuesday - 16 December 2025

Tuesday, 16 December 2025

Ceisteanna (545)

Donna McGettigan

Ceist:

545. Deputy Donna McGettigan asked the Minister for Housing, Local Government and Heritage the nature of refurbishment works that were carried out at Burren National Park in 2024 and to-date in 2025, in tabular form; the refurbishment works that are scheduled to commence at this National Park during the first half of 2026; and if he will make a statement on the matter. [71405/25]

Amharc ar fhreagra

Freagraí scríofa

The National Parks and Wildlife Service (NPWS) has carried out extensive refurbishment and related capital works in the Burren National Park between 2024 and 2025 in order to address longstanding shortcomings in facilities and provide adequate support to staff. To this end, the purchase of McGann’s Farm in Tullycommon in 2024 has provided an important base for staff within the region and will support operations within the Park for years to come.

Continued investment will be required in coming years to ensure ongoing improvements to visitor infrastructure and staff facilities, enhancing the experience for visitors to the area while supporting the NPWS’s core mission to protect nature.

A table outlining projects and their status in the Burren National Park is attached.

Year 2024

Works Commissioned

Location in Burren National Park (NP)

Complete (Y/N)

1.

Stockyard for Conservation Grazing

Slieve Carron Nature Reserve (NR)

Y

2.

Upgrade Road (Section of Marked Trail)

Green Rd, Gortlecka

Y

3.

Preparing and Submitting a Planning Application: Upgrade Existing Septic Tank to Effluent Treatment System and Soil Polishing Filter.

Glencolumbkille South

Y

4.

Condition Survey/Report, Conservation Report and Project Plan (Purcell’s Farm Complex); MOU with Irish Natural Stone.

Purcell’s Farm Complex (Ruins): Keelhilla, Slieve Carron NR

Y

5.

Preparing and Submitting a Planning Application to refurbish Research Centre (Burren Field Study Centre); MOU with Galway University.

Carron Research Station, Fahee, Carron, Ennis.

Y

Farmhouse, Tullycommon

6.

Asbestos Report, Removal and Disposal

Farmhouse

Y

7.

Permission for Septic Tank Upgrade

Farmhouse

Y

8.

Application Declaration of Exemption for Extension to Dwelling

Farmhouse

Y

9.

Radon Test

Farmhouse

Y

10.

SEAI Technical Assessment Report

Farmhouse

Y

11.

Rewire House & Pump

Farmhouse

Y

12.

Security CCTVs, Gate, Access Door & Lighting

Farmhouse Area

Y

13.

Rock Breaking & Concrete Works for Security Gate Entrance

Farmhouse

Y

14.

Entrance: Refurbish Steel Gate, Piers, Wall

Farm Entrance

Y

15.

Driveway: Fence and gate

Farm Entrance

Y

16.

Driveway Gravel

Farm Entrance

Y

17.

Farmyard Gravel

Farmyard

Y

18.

Planning for 4 Agricultural Sheds

Farmyard

Y

19.

Stone for Shed Foundations

Farmyard

Y

20.

Concrete & Steel Mesh for Sheds

Farmyard

Y

21.

Shed Foundations

Farmyard

Y

22.

Supplies for Shed Roof Repairs

Farmyard

Y

23.

Electrical Works on Sheds

Farmyard

Y

24.

Construction of 2 Haybarns & 2 Lean-to open sheds

Farmyard

Y

25.

Slate for Traditional Farm Buildings

Farmyard

Y

26.

Roofing/Gutters of Traditional Farm Buildings

Farmyard

Y

27.

Upgrade Farm Boundary Road

Farm Boundary

Y

28.

Orchard Fence

Farm

Y

29.

Submersible Pump Work

Farmyard

Y

30.

Fencing off Walking Trail

Road adjacent to farm

Y

Year 2025

Works Commissioned

Location in Burren National Park (NP)

Complete (Y/N)

31.

Refurbish Ruin/Grounds: Clearing, Demolition, Roof and Flooring.

Glencolmbkille National School (Ruin)

Ongoing

32.

Restoration Services (Purcell’s Farm Complex)

Purcell’s Farm Complex (Ruins): Keelhilla, Slieve NR

Ongoing

33.

Consultation and Close Out for Works (Burren Field Study Centre)

Carron Research Station, Fahee, Carron.

Y

Tullycommon

34.

Supplies for Traditional Farm Buildings

Farmhouse

Y

35.

Refurbish Traditional Horse Stables

Farmyard

Y

36.

Rebuild Gable, Internal Repointing, Exterior Air-vents of Old Stone Building

Farmyard

Y

37.

Electrical Works on Sheds

Farmyard

Y

38.

Fire Alarms for 2 Machinery Sheds

Farmyard

Y

39.

Fire Management Plan and Fire Safety Equipment

Farmhouse, Sheds and Yard

Y

40.

Supplies for Reroofing Sheds

Farmyard

Y

41.

Construction of Replacement Haybarn

Farmyard

Ongoing

42.

Electrical Works on 4 High Bay Sheds

Farmyard

Y

43.

Gravel - Roads around sheds

Farmyard

Y

44.

Install Cattle Crush & Water Pipes from Shed to Pump

Farmyard

Ongoing

45.

Submersible Pump Work

Farmyard to Shed

Y

46.

Removal of Old Wall & Water Tank. Excavate & Install New Water Tank, Water Pipes and Channels with Retaining Wall Around Shed.

Farmyard

Ongoing

47.

Establish Heritage Orchard; including Fencing; MOU with Irish Seed Savers.

Rockforest

Ongoing

Year: 2026

Planned works

Location in Burren National Park (NP)

Status

48

Refurbish of the Carran Field Study Centre

Carran Village

Proposed

49

New Visitor Centre

Corofin

Proposed

50

Reception area/all ability trail

Rockforest

Proposed

51

Composting toilets

Slieve Carron, Keelhilla, Kenny’s Cross

Proposed

52

Continued restoration of Purcell’s Farm Complex

Purcell’s Farm Complex (Ruins): Keelhilla, Slieve NR

Ongoing

53

Continued refurbishment of Farmhouse

Tullycommon, Carran

Ongoing