The project referred to by the Deputy is part of a campus project that has been devolved for delivery to the National Development Finance Agency (NDFA) as part of a bundled school building programme (Project Shannon). There are three schools within this campus project including this school.
The brief for the school includes the provision of 24 mainstream classrooms and 4 SEN classrooms.
The project is currently at Stage 2a of the architectural design process. Stage 2a (the developed design stage) involves the Design Team developing the designs, fully cost planning the campus project and preparing the necessary documentation to facilitate the lodging for statutory approval to the county council as part of the Stage 2b process.
The length of time a project takes to deliver depends on several factors, including scale and complexity and is subject to the time it takes to progress through the various design stages and the statutory approval process. . However, the NDFA will continue to engage directly with the school authority to keep them fully informed of progress on this important project.
In July 2025, the Government announced a capital allocation of €7.55 billion for the Department of Education and Youth for the period 2026-2030 under the National Development Plan(NDP). As part of this NDP allocation my department will place a strong emphasis on provision for children with special educational needs, with a particular focus on meeting annual school place needs. In relation to project rollout for Large-Scale projects and Additional School Accommodation scheme projects, the approach will be to continue to maximise the capacity of the existing school estate as much as possible in the first instance and provide necessary additional capacity through targeted and prioritised project rollout over the course of 2026 to 2030 period to meet the most urgent and prioritised needs.
The NDP Implementation Plan for the Education and Youth sector and the first tranche of projects to progress to construction will be published by my department shortly. This NDP Implementation Plan will optimise outputs from the NDP allocations, with a strong focus on maximising existing school capacity, progressing priority projects where local capacity across schools in the area is insufficient, and ensuring delivery that is affordable, offers value for money, and meets functional needs.
The current status of all projects is listed on a county-by-county basis at [www.gov.ie]. and this is updated on a regular basis to reflect project progress through the various stages of capital appraisal, site acquisition, design, tender and construction.
The school in question has submitted an application for funding under the Emergency Works Scheme (EWS).
The purpose of the Emergency Works Scheme (EWS) is to provide funding specifically for unforeseen emergencies, or to provide funding to facilitate inclusion and access for pupils with special needs. It does so by ensuring the availability of funding for urgent works to those schools that are in need of resources as a result of an emergency situation.
An emergency is deemed to be a situation which poses an immediate risk to health, life, property or the environment, which is sudden, unforeseen and requires immediate action, and in the case of a school, if not corrected would prevent the school or part thereof from opening.
The EWS operates on the basis of a minimal scope works to address the emergency situation. The EWS is intended to remedy an emergency situation and usually provides only an interim measure until a permanent solution can be delivered under the Summer Works Scheme (SWS) which deals with upgrade works to the school.
The school in question submitted a number of applications for funding under the Emergency Works Scheme (EWS) for life safety system, fabric defects and roof works. The EWS operates on the basis of a minimal scope of works required to remedy an emergency situation and, on this basis, the school was advised to submit a revised scope of works with an accompanying itemised cost breakdown.
Once this has been received the EWS team will review the revised application and will engage further with the school as appropriate. The EWS team is aware of the urgent nature of the works required and will keep the school informed throughout the process.