Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Thursday, 12 Feb 2026

Written Answers Nos. 350-369

School Staff

Ceisteanna (350)

Richard Boyd Barrett

Ceist:

350. Deputy Richard Boyd Barrett asked the Minister for Education and Youth the reason a school has not been allocated any SNAs for 2025-2026 despite the significant and growing level of need; the number of children with additional needs attending the school (details supplied); her views that smaller school's experience an inequity of access to support children purely based on school size and infrastructure rather than need; if she will take appropriate steps to address this; and if she will make a statement on the matter. [11280/26]

Amharc ar fhreagra

Freagraí scríofa

Enabling students with special educational needs to receive an education that meets their needs is a priority for this Government. It is also a key priority for me, my department and for the National Council for Special Education (NCSE).

The vast majority of students with special educational needs are supported to attend mainstream classes with their peers. Where students with more complex needs require additional supports, special class and special school places are provided.This is in keeping with policy on an inclusive education, which advocates that students will be supported to receive an education in the most inclusive setting possible.

The National Council for Special Education (NCSE) is, in the first instance, the primary body responsible for the matter the Deputy has raised. I will arrange for your query to be forwarded to the NCSE for their attention and direct reply. Deputies are also welcome to raise such queries with the NCSE directly through their dedicated Oireachtas email address.

Special needs assistants (SNA)s play a central role in the successful inclusion of students with additional and significant care needs in schools. They help ensure that these students can access an education to enable them to achieve their best outcomes and reach their full potential.

SNA posts are allocated to schools as a school-based resource. Principals/board of managements deploy SNAs within schools to meet the care support requirements of the students enrolled whom SNA support has been allocated. This provides schools flexibility in how the SNA support is utilised.

If a school feels like it has insufficient SNA support to meet the needs of its students an application can be submitted to the NCSE requesting a review of its allocation. Detailed information on the NCSE's SNA review process is published on the NCSE's website. Each case is individually assessed and is based on the student profile of each school.

Following the outcome of the review, the NCSE can make a local special educational needs organiser (SENO) available to the school to discuss their current deployment of SNA supports in the school and to put these supports to the best advantage of the students. The NCSE in-school support service is also available to schools to offer further guidance and support.

My department and the NCSE are committed to delivering an education system that is of the highest quality and where every child and young person feels valued and is actively supported and nurtured to reach their full potential.

School Facilities

Ceisteanna (351)

Michael Cahill

Ceist:

351. Deputy Michael Cahill asked the Minister for Education and Youth the status of an additional accommodation scheme application lodged by a school (details supplied); and if she will make a statement on the matter. [11289/26]

Amharc ar fhreagra

Freagraí scríofa

A large scale extension and refurbishment to the existing building was recently completed for the school referred to by the Deputy to cater for its long term projected enrolment. I can confirm that my department is currently reviewing additional requirements identified by the school and will engage directly with the school authority on how best to address its requirements in respect of special education provision.

As the Deputy will be aware, I have recently published the €7.55 billion NDP Sectoral Investment Plan for the Education and Youth Sectors for the period 2026 to 2030. This NDP Sectoral Plan involves a very strong emphasis on maximising existing capacity and prioritisation of school building projects to meet the most urgent needs. In this regard there will be a strong special education dimension to project rollout.

Of the total €7.55 billion investment, it is envisaged that circa. €5 billion will be used for project rollout to support the delivery and modernisation of school buildings across the Large Scale, Additional Accommodation, Modular, and Annual September Accommodation Needs programmes. Over the course of 2026 and 2027 there will be construction work at circa. 10% of the school estate. These projects will, when completed, provide circa 57,000 additional and modernised school places with a strong SEN focus in all projects. The accommodation needs at the school in question will be considered as part of the ongoing overall department-led prioritisation process, in consultation with the school’s patron and school authorities.

School Facilities

Ceisteanna (352)

Emer Currie

Ceist:

352. Deputy Emer Currie asked the Minister for Education and Youth for an update regarding an additional accommodation project under the School Capital Programme (details supplied); and if she will make a statement on the matter. [11292/26]

Amharc ar fhreagra

Freagraí scríofa

The school referred to by the Deputy has been approved to enter my department’s pipeline for school building projects, to provide four mainstream classrooms and two science labs under my department’s SEN Repurposing and Modular Accommodation programme as Phase 1 of this school permanent extension. As part of this project, ongoing repurposing works within the school are also being carried out to create two special educational needs classrooms.

Phase 2 of the development has been approved under the Additional School Accommodation Scheme. The approved works includes the provision of seven mainstream classrooms, one music room, one design and computer graphics room, one home economics room, one graphics room, two engineering, construction studies and technology rooms with preparation areas, two special educational needs classrooms, two special education tuition rooms, one office, one staff room, and ancillary accommodation. The project was devolved to Dublin and Dún Laoghaire Education and Training Board (DDLETB) for delivery.

My department is still awaiting receipt of the Stage 1 (Preliminary Design) report from the appointed design team, and we have not yet been advised of the expected delivery date. It is now within the remit of DDLETB to progress this project accordingly

As the Deputy will be aware, I have recently published the €7.55 billion NDP Sectoral Investment Plan for the Education and Youth Sectors for the period 2026 to 2030. This NDP Sectoral Plan involves a very strong emphasis on maximising existing capacity and prioritisation of school building projects to meet the most urgent needs. In this regard there will be a strong special education dimension to project rollout.

Of the total €7.55 billion investment it is envisaged that circa. €5 billion will be used for project rollout to support the delivery and modernisation of school buildings across the Large Scale, Additional Accommodation, Modular, and Annual September Accommodation Needs programmes. Over the course of 2026 and 2027 there will be construction work at circa. 10% of the school estate. These projects will, when completed, provide circa 57,000 additional and modernised school places with a strong SEN focus in all projects.

My department will continue to build on the progress made over recent years with the continued rollout of projects on a prioritised basis to meet the most urgent needs in terms of provision of additional capacity and modernisation of existing facilities. In this regard, I have also published a list of the 105 school building projects in the first tranche to proceed to construction or tender over 2026 and 2027.

The first tranche of 105 school building projects includes 80 large scale and Additional School Accommodation scheme projects. These projects were prioritised with a strong focus on maximising existing capacity and prioritising project rollout to meet the most urgent needs particularly to support special education needs provision.

Firstly, to facilitate the 45 projects that are currently already at tender stage (Stage 3) so that they can progress to construction as smoothly as possible over the course of 2026 and 2027. Secondly, to facilitate 35 projects that currently have planning permission and are at pre-tender stage (Stage 2b) and have been prioritised to meet urgent requirements from a special needs perspective or to provide additional capacity to cater for demographics or to address very significant condition issues at the schools.

I recognise that there are schools with important building projects that are not included in the first tranche of prioritised projects.

As part of planning ahead for the next tranche of projects to progress to tender, the department-led prioritisation process will continue over the course of 2026 and 2027 to assess and evaluate the progression of individual projects through the design pipeline having regard to the continual need to maximise existing capacity and determine the prioritised needs going forward. This process will involve engagement with key stakeholders and individual schools and will ultimately inform the next tranches of programme rollout to tender. The department-led Energy and Condition Survey of the school estate, which will be finalised later in 2026, will provide an additional evidence base for assessing priorities.

Based on this ongoing prioritisation process some projects may be added to the list over the course of 2026 and 2027 having regard to their prioritisation and urgency of need and taking account also of the ongoing ability to progress them to tender and construction within the parameters of overall funding. Where appropriate, the department will also assess opportunities to undertake advance enabling works for the most urgent and complex projects to facilitate a smooth progression to construction in 2028 and beyond.

Any interim accommodation requirements will continue to be assessed and considered by the department on a case-by-case basis to determine the prioritised needs and approach for addressing same.

The accommodation needs at this school will be considered as part of the ongoing overall department-led prioritisation process, in consultation with the school’s patron and school authorities.

Departmental Schemes

Ceisteanna (353)

Darren O'Rourke

Ceist:

353. Deputy Darren O'Rourke asked the Minister for Education and Youth given the notice sent to youth organisations of a 3% uplift in funding arising from 2026, the breakdown of the way in which the Budget 2026 allocation is to be broken down across all funding schemes in subhead 10.8; the final detailed breakdown of the Youth Affairs schemes and programmes for 2026; and if she will make a statement on the matter. [11310/26]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy is aware, I was pleased to announce that arising from Budget 2026, an additional €8 million in current and capital funding has been allocated to support the sustainability and development of youth services. This funding increase brings the overall core current and capital funding available to support existing youth services and infrastructure to €94.1 million for 2026, a 9.3% increase on the corresponding funding available in 2025.

In 2026, the core current funding allocation of €90.1 million will support existing youth services and youth organisations of both targeted and universal services for young people. This investment will contribute to sustaining and enhancing participation levels across all schemes, which now involve over 450,000 young people.

A breakdown of the confirmed increases for Youth Affairs–funded schemes is provided in the table below. The remaining scheme allocations for 2026 are still under review and will be issued to ETBs and national youth organisations following finalisation.

Scheme

2025 Allocation

2026 Allocation

UBU Main Scheme

€51,909,620

€53,466,909

YSGS Main Scheme

€14,833,372

€15,278,373

ETB Youth Grant

€5,416,524

€5,676,626

Local Youth Club Grant Scheme

€2,700,000

€2,764,000

Youth Information Expenditure

€1,512,166

€1,557,531

TYESI

€1,187,000

€1,267,750

UBU - R&E

€609,505

€1,100,000

Departmental Communications

Ceisteanna (354)

David Cullinane

Ceist:

354. Deputy David Cullinane asked the Minister for Education and Youth if she or her Minister of State has received correspondence from a school (details supplied); if she has responded to this correspondence; if she will ensure a review of the matter raised; and if she will make a statement on the matter. [11325/26]

Amharc ar fhreagra

Freagraí scríofa

Enabling students with special educational needs to receive an education that meets their needs is a priority for this Government. It is also a key priority for me, my department and for the National Council for Special Education (NCSE).

The NCSE is, in the first instance, the primary body responsible for the matter the Deputy has raised. I will arrange for your query to be forwarded to the NCSE for their attention and direct reply.

Deputies are also welcome to raise such queries with the NCSE directly through their dedicated Oireachtas email address.

Departmental Expenditure

Ceisteanna (355)

Matt Carthy

Ceist:

355. Deputy Matt Carthy asked the Minister for Education and Youth the amount expended by her Department and by each agency for which she is responsible on advertising, promotion, advertising companies and external communications companies or consultants in 2025 and the expected costs for 2026, in tabular form; and if she will make a statement on the matter. [11349/26]

Amharc ar fhreagra

Freagraí scríofa

Each year, the Department of Education and Youth runs awareness campaigns to make people aware of education-related services and initiatives. Campaigns are planned by the department and use a mix of agency support and in-house materials. In 2025, advertising and promotion included the Primary School Survey campaign for parents and guardians; Teaching Transforms campaign, which promotes teaching as a career; and School Transport campaigns that informed parents about how to access school transport.

These campaigns use different channels like online videos, digital media, radio, and print in both national and regional newspapers. All messages are shared in English and Irish at the same time.

Year

Amount

2026 (Allocated)

€350,000.00

2025

€377,525.00

Teaching Council

This year, the Teaching Council budget reflects an enhanced campaign to promote teaching as a profession, in line with the Council’s statutory remit under Section 7(2)(a) of the Teaching Council Act 2001 (as amended). This investment will also underpin efforts to promote the supply of teachers to the education system.

This expanded initiative will include:

Paid Articles: Strategic placement of articles and features in regional and national magazines and newspapers to highlight teaching as a rewarding and trusted profession.

Event Participation: A presence at major national events such as the National Ploughing Championships and Higher Options, with enhanced promotional activities to showcase the Council’s work and the benefits of teaching as a career and profession to aid teacher supply.

Multi-Channel Campaign: An enhanced approach across online, digital, and print media to reach diverse audiences, strengthen public awareness of teaching as a profession, and emphasise the importance of regulation in maintaining public confidence and trust.

This investment is designed to deliver a higher-impact, nationwide campaign that elevates the profile of teaching, supports the Council’s role in promoting the profession and promotes the supply of teachers to the system.

Year

Amount

2026 (Allocated)

€51,000.00

2025

€5,924.99

Education Research Centre

Year

Amount

2026 (Allocated)

€15,000.00

2025

€10,000.00

National Council for Curriculum and Assessment

Year

Amount

2026 (Allocated)

€1,500.00

2025

€1,000.00

Schools Building Projects

Ceisteanna (356)

Matt Carthy

Ceist:

356. Deputy Matt Carthy asked the Minister for Education and Youth when the new school (details supplied) will be completed and open for students; and if she will make a statement on the matter. [11362/26]

Amharc ar fhreagra

Freagraí scríofa

The project to which the deputy refers has been devolved for delivery to Cavan and Monaghan ETB (CMETB).

The project brief is for a new primary school comprising 8 mainstream classrooms and 3 Special Education Tuition rooms.

The project is currently at stage 4 (construction) of the delivery process. It is expected to reach substantial completion during the 2nd half of 2026 pending no unforeseen circumstances.

The Department has been actively engaged with CMETB throughout the process and will continue to engage to provide practical advice and assistance.

CMETB will continue to engage directly with the school authorities to keep them fully informed of progress on this important project.

School Staff

Ceisteanna (357)

Michael Cahill

Ceist:

357. Deputy Michael Cahill asked the Minister for Education and Youth if she will address the severe cuts in SNAs across multiple schools in County Kerry; and if she will make a statement on the matter. [11472/26]

Amharc ar fhreagra

Freagraí scríofa

The National Council for Special Education (NCSE) has responsibility for coordinating and advising on the education provision and care support for children and young people with special educational needs in our schools, including the allocation of special needs assistant (SNA) support to schools.

The number of SNAs allocated to schools in Kerry since 2020/21 school year has increased from 616 to 866.

Reflecting the central role SNAs play in the successful inclusion of students with additional and significant care needs in schools my department has been steadily building the level of SNA support in our education system. By the end of the 2026/27 school year there will be close to 25,000 SNAs in our mainstream classes, special classes and special schools. They play a key role in supporting children and young people with special educational needs as part of a whole school approach which also includes almost 22,000 special educational teachers.

There are many reasons why the level of need for SNA support in schools may fluctuate including falling enrolments, reduced or increased care needs and changing demographics as children move from primary to post-primary schools.

The NCSE reviews of SNA allocation in a school is a very detailed examination of the care needs in all settings within the continuum of provision in a school so as to ensure that SNAs are allocated to schools to support students who have the greatest level of significant care needs. Where an NCSE review identifies a decrease in the level of care need in a school and where this decrease is significant, it results in a reduction in the SNA allocation to that school. Schools that are not satisfied with the outcome of their SNA review may avail of the NCSE’s internal appeal mechanism. Furthermore, where a school is not satisfied with the outcome of the appeal on the basis that they consider the process was not followed, the school can refer the matter to the independently chaired Appeals Advisory Committee (AAC). Further information on these processes is available from the NCSE website www.ncse.ie .

While the NCSE allocation and review processes are essential to ensure SNA support is provided where it is most needed, I do not underestimate the impact of a reduction in allocation on SNAs personally. This is among the reasons my department is working with the NCSE to develop an SNA redeployment scheme. This important policy initiative which is in the final stages of development will ensure that as far as possible, competent, knowledgeable, and experienced SNAs are retained in our schools.

The SNA redeployment scheme is being implemented for the 2025/26 school year, providing an opportunity for redeployment of SNAs as the need arises for the start of the 2026/27 school year. It is important to note that SNAs in surplus posts identified through the NCSE’s SNA Review process will remain in the relevant school for the rest of the 2025/26 academic year. Assuming no change to SNA allocations in the meantime, eligible SNAs in standard posts (both full-time and part-time) who opt for redeployment may be redeployed to a new post in September 2026.

Updates and final details of the SNA Redeployment Scheme, including a circular and comprehensive guidelines, will be published on the NCSE website and the SNA Information Hub on www.gov.ie as work progresses.

My department and the NCSE are committed to delivering an education system that is of the highest quality and where every child and young person feels valued and is actively supported and nurtured to reach their full potential.

Departmental Schemes

Ceisteanna (358)

Michael Cahill

Ceist:

358. Deputy Michael Cahill asked the Minister for Education and Youth the number of applications her Department received under the emergency response scheme in respect of schools in County Kerry during the past four years; and if she will make a statement on the matter. [11475/26]

Amharc ar fhreagra

Freagraí scríofa

As the Deputy may be aware, the purpose of the Emergency Works Scheme (EWS) is to provide funding specifically for unforeseen emergencies, or to provide funding to facilitate inclusion and access for pupils with special needs. It does so by ensuring the availability of funding for urgent works to those schools that are in need of resources as a result of an emergency situation.

An emergency is deemed to be a situation which poses an immediate risk to health, life, property or the environment, which is sudden, unforeseen and requires immediate action, and in the case of a school, if not corrected would prevent the school or part thereof from opening.

The EWS operates on the basis of a minimal scope works to address the emergency situation. The EWS is intended to remedy an emergency situation and usually provides only an interim measure until a permanent solution can be delivered under the Summer Works Scheme (SWS) which deals with upgrade works to the school.

With regards to the question there were 185 applications received between 2022-2026, under the Emergency Works Scheme in Kerry.

Departmental Projects

Ceisteanna (359)

Ann Graves

Ceist:

359. Deputy Ann Graves asked the Minister for Education and Youth the reason a permanent build for a school (details supplied) was not included in the tranche of 105 projects to progress to tender and/or construction in 2026–2027; the criteria or dependency that is preventing it from being progressed; the current status and next steps; the timeline, for design, procurement and tender preparation; the specific remaining milestones before tender can issue; when her Department expects the tender to be published, contractor appointment, site start, completion; the timeframe for the school moving into the new building; if this new build will appear in a later tranche; if so, which tranche and when that will be published; and if her Department will commit to providing regular progress updates to the school community until the project reaches tender and construction. [11477/26]

Amharc ar fhreagra

Freagraí scríofa

The school building project for the school referred to by the Deputy is being delivered under my department's Design and Build Programme which uses a professional external Project Manager to progress the project through the relevant stages of architectural planning, tender and construction. The project will deliver a new 16 classroom primary school and accommodation, including four classrooms, for children with special educational needs.

The final grant of permission was received on 22nd October 2025. The next milestone for this project will be Stage 3 Tender. The Stage 3 Tender timeline will be determined by the ongoing prioritisation and the availability within the parameters of the overall funding.

As the Deputy will be aware, I have recently published the €7.55 billion NDP Sectoral Investment Plan for the Education and Youth Sectors for the period 2026 to 2030. This NDP Sectoral Plan involves a very strong emphasis on maximising existing capacity and prioritisation of school building projects to meet the most urgent needs. In this regard there will be a strong special education dimension to project rollout.

Of the total €7.55 billion investment it is envisaged that circa. €5 billion will be used for project rollout to support the delivery and modernisation of school buildings across the Large Scale, Additional Accommodation, Modular, and Annual September Accommodation Needs programmes. Over the course of 2026 and 2027 there will be construction work at circa. 10% of the school estate. These projects will, when completed, provide circa 57,000 additional and modernised school places with a strong SEN focus in all projects.

The first tranche of 105 school building projects includes 80 large scale and Additional School Accommodation scheme projects. These projects were prioritised with a strong focus on maximising existing capacity and prioritising project rollout to meet the most urgent needs particularly to support special education needs provision.

Firstly, to facilitate the 45 projects that are currently already at tender stage (Stage 3) so that they can progress to construction as smoothly as possible over the course of 2026 and 2027. Secondly, to facilitate 35 projects that currently have planning permission and are at pre-tender stage (Stage 2b) and have been prioritised to meet urgent requirements from a special needs perspective or to provide additional capacity to cater for demographics or to address very significant condition issues at the schools.

As part of planning ahead for the next tranche of projects to progress to tender, the department-led prioritisation process will continue over the course of 2026 and 2027 to assess and evaluate the progression of individual projects through the design pipeline having regard to the continual need to maximise existing capacity and determine the prioritised needs going forward. This process will involve engagement with key stakeholders and individual schools and will ultimately inform the next tranches of programme rollout to tender. The Department-led Energy and Condition Survey of the school estate, which will be finalised later in 2026, will provide an additional evidence base for assessing priorities.

Based on this ongoing prioritisation process, some projects may be added to the list over the course of 2026 and 2027 having regard to their prioritisation and urgency of need and taking account also of the ongoing ability to progress them to tender and construction within the parameters of overall funding. Where appropriate, my department will also assess opportunities to undertake advance enabling works for the most urgent and complex projects to facilitate a smooth progression to construction in 2028 and beyond.

Any interim accommodation requirements will continue to be assessed and considered by my department on a case-by-case basis to determine the prioritised needs and approach for addressing same.

The accommodation needs at the school referred to by the Deputy will be considered as part of the ongoing overall department-led prioritisation process, in consultation with the school’s patron and school authorities.

My Department will continue to keep the school and it’s patron body updated as the project progresses.

School Meals Programme

Ceisteanna (360)

Michael Cahill

Ceist:

360. Deputy Michael Cahill asked the Minister for Education and Youth the measures being taken to address a matter (details supplied), apart from the €75 increase to help schools meet rising costs without relying on constant fundraising as per a submission; and if she will make a statement on the matter. [11489/26]

Amharc ar fhreagra

Freagraí scríofa

The Programme for Government commits to make further progress in this area with an aim to reduce the general Pupil Teacher Ratio at primary level to 19:1 over the term of government. I look forward to making progress on this important issue.

Priority was given in recent Budgets to reducing the pupil teacher ratios in primary schools which has brought the teacher allocation ratio to an average of 1 classroom teacher for every 23 pupils in all primary schools, the most favourable ratio ever seen at primary level. More favourable ratios are implemented for DEIS Urban Band 1 schools. In addition to the reductions in the teacher allocation ratio, a three-point reduction in the retention schedule, which was introduced in 2021, assists schools that would otherwise be at risk of losing teaching posts.

In 2015, teachers were allocated to primary schools at a general average of 28 pupils for every one teacher. In the same 10 year period, average class sizes in primary schools have improved from 24.9 to 22.2 and the pupil : teacher ratio (commonly referred to as PTR) shows the ratio of pupils to teachers improve from 16:1 to 12.8:1

The government is very aware that small schools are an important part of the life of local communities. The Programme for Government provides for a number of measures to support small schools, including introducing a new national small schools' project and trialling new administrative supports.

The current small schools' project is currently being implemented on a pilot basis to support collaboration and sharing of resources among small schools in rural areas. Learnings from the evaluation of the current small schools' project will be invaluable and will form a strong basis to inform the future policy direction in relation to all small schools. This will include the development in my department of future proposals to deliver on the Programme for Government commitment.

By the end of the 2026 calendar year there will be over 21,000 special educational teachers in our mainstream classes, special classes and special schools. This will mean we will have almost 46,000 teachers and special needs assistants (SNAs) working in our education system committed to supporting and nurturing students with special educational needs, enabling them to achieve their best outcomes and reach their full potential.

I understand that special education teachers particularly at post-primary level dedicate a significant proportion of their day to information gathering and assessment, reviewing, monitoring and co¬ordinating provision for students with special educational needs. This would include transition planning for the identified students.

In 2026, over €3 billion will be spent supporting students with special educational needs. Part of this funding will allow for the introduction of extra special education teaching (SET) hours for post-primary schools to support coordination and transition efforts.

At primary level where primary schools open a number of special classes administrative principal and deputy principal posts are provided. There has also been a significant increase in the number of posts of responsibility allocated to primary schools in recent years.

While in special schools in acknowledgement of the particular challenges these schools face, my department has provided for an administrative deputy principal in all special schools from the beginning of the last school year and additional post-primary teaching hours to reflect the growing number of post-primary aged students in our special schools.

My department has provided these posts to support schools that provide special educational provision to ensure that these schools have an appropriate level of resources available to provide an education that meets the needs of students with special educational needs.

The Government is committed to increasing funding to support schools and the Programme for Government commits to increasing capitation funding to schools of all types to ensure that schools can meet the elevated day-to-day running costs.

The commitment in the Programme for Government builds on the progress which has been made in recent years. The Department has secured €39 million in Budget 2026 towards increased capitation funding for primary, post-primary and special schools to provide additional financial support towards their running costs. This will see an increase in the standard capitation rates paid to schools of €50 per pupil for primary schools from €224 to €274 and of €20 per student for post-primary schools from €386 to €406. This will also allow for an increase of €20 in capitation rates for Urban Band One DEIS primary schools, increasing the mainstream pupil rate in these schools to €294. The increased capitation rates will also see special schools now receive the same rates of mainstream capitation, for young people aged 12 and over, as for their peers in mainstream post-primary schools. These increases will take effect from September 2026. This funding will benefit schools around the country in managing their day-to-day running costs.

The increases announced in Budget 2026 are in addition to the 12% increases as part of Budget 2025. The last three Budgets have resulted in an increase in the level of capitation grant rates of 49.7% (€91) paid to primary schools and 28.5% (€90) paid to post-primary schools.

The Department is committed to providing funding to recognised primary and post-primary schools in the Free Education Scheme by way of per capita grants. The two main grants are the capitation grant to cater for day-to-day running costs such as heating, lighting, cleaning, insurance and general up-keep, and the ancillary grant to cater for the cost of employing ancillary services staff. Schools have the flexibility to use capitation funding provided for general running costs and ancillary funding provided for caretaking and secretarial services as a common grant from which the Board of Management can allocate according to its own priorities, except for the employment of relevant secretaries as per Circular 0036/2022.

The current standard rate of capitation grant is €224 per pupil in primary schools and €386 per student in post-primary schools. Primary schools with fewer than 60 pupils are paid the capitation and the ancillary grants on the basis of having 60 pupils. Enhanced rates are also paid in respect of pupils with special educational needs and Traveller pupils.

Voluntary contributions can be requested by schools; however, it must be made absolutely clear to parents that there is no requirement to pay, and that, in making a contribution, they are doing so of their own choice, and there is no compulsion to pay.

OGP frameworks are available to schools for a number of categories including facilities management, managed services, professional services, and utilities. Schools should ensure that they are availing of these available OGP procurement frameworks in order to get the best value for money for all school expenditure, in accordance with Circular 0060/2013. The benefits arising from these frameworks include cash savings, administrative savings from reduced duplication of tendering, greater purchasing expertise, improved consistency, enhanced service levels and legal certainty. Schools Procurement Unit (SPU), funded by the Department, is an important source of advice and support to schools on procurement matters- www.spu.ie

The Financial Support Services Unit (FSSU), funded by the Department, is an important source of advice and support to schools on financial matters

State Examinations

Ceisteanna (361)

Peter 'Chap' Cleere

Ceist:

361. Deputy Peter 'Chap' Cleere asked the Minister for Education and Youth whether she intends to review and revise upwards the policy of granting an additional ten minutes in the Leaving Certificate and Junior Certificate examinations; and if she will make a statement on the matter. [11492/26]

Amharc ar fhreagra

Freagraí scríofa

The Programme for Government commits to developing an appropriate mechanism to allow additional time for students with specific needs and in certain circumstances in State examinations.

The State Examinations Commission (SEC) has operational responsibility for the delivery of the State examinations including the scheme of Reasonable Accommodations at the Certificate Examinations (RACE). As part of its comprehensive review of the RACE scheme, which is currently ongoing, the SEC has given careful consideration to how best to give effect to the Programme for Government commitment on additional time, seeking to balance the how to better meet the needs of candidates with special educational needs while preserving equity and fairness in the State examinations.

The SEC is taking a prudent approach to the quantum of extra time in light of the need to evaluate the impact of this interim scheme together with other accommodations, such as the spelling and grammar waiver, which exist in lieu of additional time. Informed by this evaluation and ongoing research, which includes looking at other jurisdictions, the SEC intends to consider further opportunities to develop these arrangements from 2027 onwards.

I have asked the SEC to respond directly to you with further detail of the scheme of additional time.

Departmental Inquiries

Ceisteanna (362)

Niall Collins

Ceist:

362. Deputy Niall Collins asked the Minister for Education and Youth if an application by a school (details supplied) will be reconsidered; and if she will make a statement on the matter. [11495/26]

Amharc ar fhreagra

Freagraí scríofa

The school referred to was approved to enter the Department’s pipeline of school buildings under the Additional School Accommodation Scheme for a project providing a 2 classroom SEN base. The project is devolved to the school authority for delivery.

I can confirm that the Stage 2b (post planning) report was submitted to the Department and is currently being reviewed from a cost perspective in accordance with the requirements of the Public Spending Code. All projects, including this one, are subjected to the required due diligence as specified in the Department's infrastructure guidelines.

With regard to the condition of the accommodation, particularly its use for special educational classroom, if there are immediate health and safety risks, the school may apply for Emergency Works funding. The main purpose of the Emergency Works Scheme is to provide for unforeseen emergencies that impact on school buildings. An emergency is a situation which poses an immediate risk to health, life, property or the environment, which is sudden, unforeseen and requires immediate action and, in the case of a school, if not corrected would prevent the school or part thereof from opening. The scheme does so by ensuring the availability of funding for urgent works to those schools that are in need of resources as a result of an emergency situation. The scheme also provides funding to facilitate inclusion and access for special needs pupils on receipt of an enrolment application from such a pupil and/or for staff members. Applications must meet the criteria outlined in Circular 0068/2020 and include all relevant supporting documentation.

Alternatively, the school may apply to the Additional Accommodation Needs unit for a modular unit. However, it must be noted that any modular provided may affect the scope of the school’s existing ASA brief.

As the Deputy will be aware, I have recently published the €7.55 billion NDP Sectoral Investment Plan for the Education and Youth Sectors for the period 2026 to 2030. This NDP Sectoral Plan involves a very strong emphasis on maximising existing capacity and prioritisation of school building projects to meet the most urgent needs. In this regard there will be a strong special education dimension to project rollout.

Of the total €7.55 billion investment it is envisaged that circa. €5 billion will be used for project rollout to support the delivery and modernisation of school buildings across the Large Scale, Additional Accommodation, Modular, and Annual September Accommodation Needs programmes. Over the course of 2026 and 2027 there will be construction work at circa. 10% of the school estate. These projects will, when completed, provide circa 57,000 additional and modernised school places with a strong SEN focus in all projects.

My department will continue to build on the progress made over recent years with the continued rollout of projects on a prioritised basis to meet the most urgent needs in terms of provision of additional capacity and modernisation of existing facilities. In this regard, I have also published a list of the 105 school building projects in the first tranche to proceed to construction or tender over 2026 and 2027. This list includes 5 projects in County Limerick.

These projects are in addition to €293.2 million in capital funding for Limerick schools between 2020 and 2025. Over that period, a total of 54 schools have been upgraded either through provision of a new school building, a large-scale extension or provision of modular accommodation. There are also currently 6 school projects in Limerick under construction.

The first tranche of 105 school building projects includes 80 large scale and Additional School Accommodation scheme projects. These projects were prioritised with a strong focus on maximising existing capacity and prioritising project rollout to meet the most urgent needs particularly to support special education needs provision.

Firstly, to facilitate the 45 projects that are currently already at tender stage (Stage 3) so that they can progress to construction as smoothly as possible over the course of 2026 and 2027. Secondly, to facilitate 35 projects that currently have planning permission and are at pre-tender stage (Stage 2b) and have been prioritised to meet urgent requirements from a special needs perspective or to provide additional capacity to cater for demographics or to address very significant condition issues at the schools.

I recognise that there are schools with important building projects that are not included in the first tranche of prioritised projects.

As part of planning ahead for the next tranche of projects to progress to tender, the department-led prioritisation process will continue over the course of 2026 and 2027 to assess and evaluate the progression of individual projects through the design pipeline having regard to the continual need to maximise existing capacity and determine the prioritised needs going forward. This process will involve engagement with key stakeholders and individual schools and will ultimately inform the next tranches of programme rollout to tender. The department-led Energy and Condition Survey of the school estate, which will be finalised later in 2026, will provide an additional evidence base for assessing priorities.

Based on this ongoing prioritisation process some projects may be added to the list over the course of 2026 and 2027 having regard to their prioritisation and urgency of need and taking account also of the ongoing ability to progress them to tender and construction within the parameters of overall funding. Where appropriate, the department will also assess opportunities to undertake advance enabling works for the most urgent and complex projects to facilitate a smooth progression to construction in 2028 and beyond.

Any interim accommodation requirements will continue to be assessed and considered by the department on a case-by-case basis to determine the prioritised needs and approach for addressing same.

The accommodation needs at this school will be considered as part of the ongoing overall department-led prioritisation process, in consultation with the school’s patron and school authorities.

Departmental Inquiries

Ceisteanna (363)

Eoin Ó Broin

Ceist:

363. Deputy Eoin Ó Broin asked the Minister for Education and Youth further to Parliamentary Question No. 1183 of 13 January 2026; if an update is available regarding progress; if a lease has been provided to the school; and if she will make a statement on the matter. [11520/26]

Amharc ar fhreagra

Freagraí scríofa

The department have engaged again with the Chief State Solicitor’s Office regarding the status of the lease. The CSSO has confirmed that while the lease documentation is prepared, they are currently awaiting additional instruments from [Tailte Éireann]. These documents have been ordered and are expected within the coming weeks. Upon receipt, the CSSO will prioritise forwarding the lease to the patron’s solicitor for immediate execution.

School Facilities

Ceisteanna (364)

Peadar Tóibín

Ceist:

364. Deputy Peadar Tóibín asked the Minister for Education and Youth if gender neutral toilets are being located in a new school (details supplied); the number of national schools that currently have gender neutral toilets located in their schools; the number of planned national schools that will have gender neutral toilets located in their schools; the number of secondary schools currently have gender neutral toilets located in their schools; the number of planned secondary schools that will have gender neutral toilets located in their schools. [11541/26]

Amharc ar fhreagra

Freagraí scríofa

The School Design Guide document SDG 02-06 Sanitary Facilities published by my Department’s Planning & Building Unit provides guidance on the provision of sanitary facilities in all new primary and post-primary schools. It includes the following provisions:

‘All sanitary facilities are to be designed with the physical and emotional safety of pupils in mind, to promote inclusivity and in order to remove the risk of bullying in the school environment. Toilets, corridors, cloakrooms, locker areas, changing rooms and showers may be the location of verbal, psychological and physical bullying. The behaviour of pupils in those areas requires careful monitoring through passive supervision’.

‘The location, design and layout of sanitary facilities must balance the requirement for passive supervision of sanitary facilities from circulation spaces with the dignity and privacy requirements of each user. Well-designed and well-managed sanitary facilities create cleaner, healthier spaces and are capable of being used, cleaned and maintained in a way that ensures safety and dignity of pupils and staff’.

‘The operation of sanitary facilities is a matter for each school authority. As such, early discussion in the design process between the Design Team and the School Authority in relation to the arrangement and layout of sanitary facilities is required’.

The decision in relation to the identification, allocation, wayfinding or signage of the toilet facilities in every school is based on detailed conversations between the school authority and the design team at the earliest stage, and in compliance with the recommendations of SDG-02-06 as well as the requirements of the Building Regulations. The decisions relating to the identification of sanitary facilities will be based on the ethos and values of each individual school, agreed between design teams and the school authority at the outset of the design process. In every case, all options relating to the identification of sanitary facilities, gender specific or not, remain open to each school authority as is specified in legislation.

As such, SDG-02-06 satisfies entirely the requirements of all applicable legislative requirements in relation to the prevention of discrimination in our schools and does so through a spirit of partnership with each school authority.

In addition, Universal Accessible Toilets are provided in schools in accordance with Part M of the Building Regulations and these are individual toilets designed to be self-contained units and therefore can be used by wheelchair users of all genders.

The guidance also includes classroom layouts for toilet facilities in primary schools with two ambulant disabled WCs provided en-suite to each classroom. These sanitary facilities are separated from the teaching space by a full height wall/partition with no gaps to the top or bottom, and a self-closing door. Alternate arrangements for the location of WC facilities in primary schools, such as those accessed directly from circulation areas, may also be considered.

In the case of the specific school referenced in the Deputy’s question, Lismullen National School, Navan. This new primary school project is currently at construction stage and includes the provision of the standard two ambulant disabled WCs en-suite to each classroom.

The guidance for post-primary schools includes suggested room layouts for toilet facilities with the wash hand basins located in an area, directly off and open to the circulation space facilitating better supervision. All cubicle spaces containing WCs are designed as self-contained spaces with robust full-height separating walls and access doors.

Student sanitary facilities in post-primary schools should be arranged in small blocks, not in a large central block. Small blocks increase the opportunity for passive supervision, discourage anti-social behaviour, reduce disruption caused by cleaning and maintenance, and cut down curriculum time lost through pupils visiting sanitary facilities during lessons.

Schools Building Projects

Ceisteanna (365)

John Connolly

Ceist:

365. Deputy John Connolly asked the Minister for Education and Youth when she intends to publish the next tranche of school building projects under the National Development Plan, further to the recent publication of her Department’s document entitled “First Tranche of NDP Rollout – 105 School Building Projects to Progress to Tender and/or Construction, as Appropriate, Over the Course of 2026 and 2027”; and if a school (details supplied) which is seeking a new school building, is being considered for inclusion in that next tranche of projects; and if she will make a statement on the matter. [11549/26]

Amharc ar fhreagra

Freagraí scríofa

The project referred to by the Deputy has been devolved to the Le Chéile Trust for delivery.

The project brief provides for a 1,000-pupil post-primary school for St Joseph’s Patrician College including a 2 classroom Special Education Needs (SEN) base. The new school will be located on a greenfield site in Dangan.

The project is currently in the final stages of Stage 2b of the architectural design process. This stage allows for detailed design and planning, obtaining necessary statutory permissions and preparation of tender documents. Planning has been granted, and Le Chéile Trust have advised that the Stage 2b report is expected to be submitted in early 2026. Once received, it will undergo a detailed technical and cost review in line with the Public Spending Code. Managing timing, scope, and cost is crucial to staying within budgetary limits for the overall program.

The department recently published the €7.55 billion NDP Sectoral Investment Plan for the Education and Youth Sectors for the period 2026 to 2030. This Plan involves a very strong emphasis on maximising existing capacity and prioritisation of school building projects to meet the most urgent needs. There will be a strong special education dimension to project rollout.

Of the €7.55 billion investment it’s envisaged that circa. €5 billion will be used for project rollout to support delivery and modernisation of school buildings across Large Scale, Additional Accommodation, Modular, and Annual September Accommodation Needs programmes. Over the course of 2026 and 2027 there will be construction work at circa. 10% of the school estate. These projects will, when completed, provide circa 57,000 additional and modernised school places with a strong SEN focus in all projects.

The department will continue to build on progress made over recent years with the continued rollout of projects on a prioritised basis to meet the most urgent needs in terms of provision of additional capacity and modernisation of existing facilities. In this regard, the department published a list of 105 school building projects in the first tranche to proceed to construction or tender over 2026 and 2027. This list includes 10 projects in County Galway.

These projects are in addition to €250.85 million in capital funding for Galway schools between 2020 and 2025. Over that period, a total of 88 Galway schools have been upgraded either through provision of a new school building, a large-scale extension or provision of modular accommodation. There are also currently 17 school projects in Galway under construction.

The first tranche of 105 school building projects includes 80 large scale and Additional School Accommodation scheme projects. These projects were prioritised with a strong focus on maximising existing capacity and prioritising project rollout to meet the most urgent needs particularly to support special education needs provision.

Firstly, to facilitate the 45 projects that are currently already at tender stage (Stage 3) so that they can progress to construction as smoothly as possible over the course of 2026 and 2027. Secondly, to facilitate 35 projects that currently have planning permission and are at pre-tender stage (Stage 2b) and have been prioritised to meet urgent requirements from a special needs perspective or to provide additional capacity to cater for demographics or to address very significant condition issues at the schools.

The department recognises there are schools with important building projects that are not included in the first tranche of prioritised projects.

As part of planning ahead for the next tranche of projects to progress to tender, the department-led prioritisation process will continue over 2026 and 2027 to assess and evaluate the progression of individual projects through the design pipeline having regard to the continual need to maximise existing capacity and determine the prioritised needs going forward. This process will involve engagement with key stakeholders and individual schools and will ultimately inform the next tranches of programme rollout to tender.

Any interim accommodation requirements will continue to be assessed and considered by the department on a case-by-case basis to determine the prioritised needs and approach for addressing same.

The accommodation needs at the school referred to by the Deputy will be considered as part of the ongoing overall department-led prioritisation process, in consultation with the school’s patron and school authorities.

Departmental Programmes

Ceisteanna (366, 367)

Brendan Smith

Ceist:

366. Deputy Brendan Smith asked the Minister for Education and Youth if she will ensure that a primary school will be included in the next expansion of the DEIS programme (details supplied); and if she will make a statement on the matter. [11566/26]

Amharc ar fhreagra

Brendan Smith

Ceist:

367. Deputy Brendan Smith asked the Minister for Education and Youth if she will ensure that a school will be included in the next expansion of the DEIS programme (details supplied); and if she will make a statement on the matter. [11567/26]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 366 and 367 together.

Tackling educational disadvantage is a key priority for the Department of Education and Youth. The DEIS programme is a key policy initiative for addressing concentrated disadvantage at school level. Supplementing universal supports, the DEIS programme provides a fair and targeted way to address concentrated educational disadvantage that promotes equity and meets the needs of children and young people.

Currently, the DEIS programme supports almost 1,200 primary and post-primary schools, reaching approximately 260,000 students, with an annual investment of over €180 million. Budget 2026 allocates an additional €16.5 million in 2026, rising to €48 million in 2027, to support the implementation of a new DEIS Strategy and to introduce the DEIS Plus scheme, which will commence this year.

Schools that were included in the expansion of the programme in 2022 were those with the highest levels of concentration of children and young people at risk of educational disadvantage, as identified through the refined DEIS identification model. Schools were not required to apply for inclusion in the DEIS programme. The model was applied fairly and equally to all schools, including those in the DEIS programme already to ensure that they were in the band which best addressed their level of disadvantage.

Minister Naughton is committed to tackling educational disadvantage in all schools to ensure all children can reach their potential. To this end, a new ten-year DEIS Strategy to 2035 will be published in the coming weeks. The new strategy will introduce innovative solutions to address educational disadvantage and continue to address the gap between DEIS and non-DEIS schools.

The new DEIS Strategy will focus on improving the opportunities and achievement levels of children at risk of educational disadvantage, developing more innovative approaches to tackling educational disadvantage, and working towards a more flexible system of supports to ensure that a school can receive the right support at the right time.

Any future changes to the identification model and overall allocation of resources will be considered within the context of the new DEIS Strategy.

Question No. 367 answered with Question No. 366.

Departmental Programmes

Ceisteanna (368)

Brendan Smith

Ceist:

368. Deputy Brendan Smith asked the Minister for Education and Youth if a school (details supplied) will be included in the next expansion of a programme; and if she will make a statement on the matter. [11570/26]

Amharc ar fhreagra

Freagraí scríofa

In line with the programme for government commitment, the Education Therapy Service (ETS) has been established as a critical and important support for children and young people in their school environment. The ETS is an additional support for children with special education needs. It is to supplement and not replace existing children’s health and disability services.

Minister for Education and Youth, Hildegarde Naughton, and I announced details of the 45 schools in the initial phase of the ETS on Friday the 6th of February. This will ensure that selected schools have the opportunity to engage with the ETS, through planned engagements, prior to therapist assignment. The initial clusters will be based in Carlow, Cork, Dublin, Galway, Kildare, Kilkenny, Louth, Laois, Limerick, Longford, Meath, Monaghan, Tipperary, Westmeath, Wexford and Wicklow.

It is important to highlight that this is the initial phase of the ETS rollout which will occur on a phased basis, with a wider roll-out to further special schools within the 2026/2027 school year and a new initiative which will see all schools benefit in the coming years.

The NCSE has recently completed a recruitment campaign for Senior and Staff Grade Occupational Therapists and Speech and Language Therapists, with interviews scheduled for this month.

The continued rollout of the ETS will be supported by phased recruitment campaigns throughout 2026 to ensure therapy needs across the school system are met, including a recruitment campaign in Donegal, Kerry, Cavan and Waterford by the end of June 2026. A rolling national campaign will continue later in 2026.

The recruitment of therapists and the recent appointment of the Head of Therapy represent significant steps toward full rollout of ETS in special schools and in special classes within mainstream settings. It is expected that future campaigns will also recruit additional therapy grades, including Therapy Managers, Clinical Specialists, and Therapy Assistants.

While Holy Family Special School cannot be offered ETS strand 1 supports in this cohort, the school can avail of NCSE regional therapy provided at national therapy led Teacher Professional Learning (TPL) events. This therapy-led TPL, with follow-on implementation support, is available to this school and is accessible online at: https://ncse.ie/tpl

My Department and the National Council for Special Education (NCSE) are committed to delivering an education system that is of the highest quality and where every child and young person feels valued and is actively supported and nurtured to reach their full potential.

School Staff

Ceisteanna (369)

Michael Cahill

Ceist:

369. Deputy Michael Cahill asked the Minister for Education and Youth to urgently address the severe cuts in SNAs across multiple schools in County Kerry; and if she will make a statement on the matter. [11587/26]

Amharc ar fhreagra

Freagraí scríofa

The National Council for Special Education (NCSE) has responsibility for coordinating and advising on the education provision and care support for children and young people with special educational needs in our schools, including the allocation of special needs assistant (SNA) support to schools.

The number of SNAs allocated to schools in Kerry since 2020/21 school year has increased from 616 to 866.

Reflecting the central role SNAs play in the successful inclusion of students with additional and significant care needs in schools my department has been steadily building the level of SNA support in our education system. By the end of the 2026/27 school year there will be close to 25,000 SNAs in our mainstream classes, special classes and special schools. They play a key role in supporting children and young people with special educational needs as part of a whole school approach which also includes almost 22,000 special educational teachers.

There are many reasons why the level of need for SNA support in schools may fluctuate including falling enrolments, reduced or increased care needs and changing demographics as children move from primary to post-primary schools.

The NCSE reviews of SNA allocation in a school is a very detailed examination of the care needs in all settings within the continuum of provision in a school so as to ensure that SNAs are allocated to schools to support students who have the greatest level of significant care needs. Where an NCSE review identifies a decrease in the level of care need in a school and where this decrease is significant, it results in a reduction in the SNA allocation to that school. Schools that are not satisfied with the outcome of their SNA review may avail of the NCSE’s internal appeal mechanism. Furthermore, where a school is not satisfied with the outcome of the appeal on the basis that they consider the process was not followed, the school can refer the matter to the independently chaired Appeals Advisory Committee (AAC). Further information on these processes is available from the NCSE website www.ncse.ie .

While the NCSE allocation and review processes are essential to ensure SNA support is provided where it is most needed, I do not underestimate the impact of a reduction in allocation on SNAs personally. This is among the reasons my department is working with the NCSE to develop an SNA redeployment scheme. This important policy initiative which is in the final stages of development will ensure that as far as possible, competent, knowledgeable, and experienced SNAs are retained in our schools.

The SNA redeployment scheme is being implemented for the 2025/26 school year, providing an opportunity for redeployment of SNAs as the need arises for the start of the 2026/27 school year. It is important to note that SNAs in surplus posts identified through the NCSE’s SNA Review process will remain in the relevant school for the rest of the 2025/26 academic year. Assuming no change to SNA allocations in the meantime, eligible SNAs in standard posts (both full-time and part-time) who opt for redeployment may be redeployed to a new post in September 2026.

Updates and final details of the SNA Redeployment Scheme, including a circular and comprehensive guidelines, will be published on the NCSE website and the SNA Information Hub on www.gov.ie as work progresses.

My department and the NCSE are committed to delivering an education system that is of the highest quality and where every child and young person feels valued and is actively supported and nurtured to reach their full potential.

Roinn