Written Answers Nos. 730-756

Pension Provisions

Ceisteanna (730)

Naoise Ó Cearúil

Ceist:

730. Deputy Naoise Ó Cearúil asked the Minister for Culture, Communications and Sport the reason it has taken almost six months to approve the increase to the An Post superannuation scheme, submitted by An Post in October; the reasons for the current delay within his Department; the expected timeframe for sign off; and the measures being taken to prevent similar delays in future, given the serious impact on pensioners whose sole income is their An Post pension. [12264/26]

Amharc ar fhreagra

Freagraí scríofa

Under section 46 of the Postal and Telecommunications Services Act 1983, the Minister for Culture, Communication and Sport with the concurrence of the Minister for Public Expenditure, NDP Delivery and Reform, approves any superannuation schemes submitted by An Post. The operation of the schemes is a matter between the management of An Post, staff representatives and the trustees of the schemes.

In accordance with the Act and the relevant Code of Practice for the Governance of State Bodies, An Post must seek Ministerial approval from both Ministers to increase pensions and deferred pensions for members of the An Post superannuation scheme. Section 2.13 of the Code of Practice for Governance of State Bodies Superannuation and Remuneration annex sets out that NewERA advice should be sought in respect of pension amendment proposals, as is appropriate in their role as commercial and financial advisors to the Ministers.

On 23 October 2025, An Post wrote to my Department requesting consent for an increase to pensions in payment and deferred pensions, namely, to increase pensions in payment for members and deferred members of the An Post Superannuation Scheme by 6% per annum with effect from 1st January 2025 and 1% from 1 June 2025, arising from its agreements with employee representative groups.

In line with the Code of Practice, NewERA has provided advice to me on the request. On foot of that advice, I have given my consent to An Post's request. As required under the Postal and Telecommunications Services Act 1983, the concurrence of the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation has now been sought.

It should be recognised that the time taken for the pension approval process is necessary to ensure that robust governance procedures are in place, that the Code of Practice is complied with and the relevant legislation is adhered to.

Pension Provisions

Ceisteanna (731)

Naoise Ó Cearúil

Ceist:

731. Deputy Naoise Ó Cearúil asked the Minister for Culture, Communications and Sport the rationale for requiring ministerial sanction under the Postal and Telecommunications Services Act 1983 for increases to the An Post superannuation scheme, given that the scheme is solvent, independently assessed, and poses no liability to the Exchequer; and whether he intends to review or amend this approval requirement in light of repeated delays affecting pensioners. [12265/26]

Amharc ar fhreagra

Freagraí scríofa

Under section 46 of the Postal and Telecommunications Services Act 1983, the Minister for Culture, Communication and Sport with the concurrence of the Minister for Public Expenditure, NDP Delivery and Reform, approves any superannuation schemes submitted by An Post. The operation of the schemes is a matter between the management of An Post, staff representatives and the trustees of the schemes.

In accordance with the Act and the relevant Code of Practice for the Governance of State Bodies, An Post must seek Ministerial approval from both Ministers to increase pensions and deferred pensions for members of the An Post superannuation scheme. Section 2.13 of the Code of Practice for Governance of State Bodies Superannuation and Remuneration annex sets out that NewERA advice should be sought in respect of pension amendment proposals, as is appropriate in their role as commercial and financial advisors to the Ministers.

It should be recognised that the time taken for the pension approval process is necessary to ensure that robust governance procedures are in place, that the Code of Practice is complied with and the relevant legislation is adhered to. I am not considering any changes to the statutory processes at present.

Sports Organisations

Ceisteanna (732, 733, 734, 735, 736, 737, 738)

Robert O'Donoghue

Ceist:

732. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport if he is aware of the lack of comprehensive adult safeguarding policies within certain sporting organisations, particularly in relation to bullying, harassment, and stalking of adult members; the way in which compliance with robust adult safeguarding frameworks is linked to eligibility for public funding; and if he will make a statement on the matter. [12318/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

733. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport the requirements currently placed on sporting organisations both nationally and at a community level in receipt of public funding to have adult safeguarding policies that explicitly address bullying, harassment, and stalking between adult members; and whether funding will be contingent on the implementation and regular review of such policies; and if he will make a statement on the matter. [12319/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

734. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport if Sport Ireland requires national governing bodies and other funded sports organisations to implement and enforce adult safeguarding frameworks comparable to child safeguarding standards; and if he will commit to linking future funding allocations to compliance with these adult safeguarding obligations; and if he will make a statement on the matter. [12320/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

735. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport the way in which complaints of bullying, harassment, or stalking involving adult participants in sporting organisations are currently overseen or monitored at both a national level; and community level; whether adherence to clear adult safeguarding procedures is a condition of ongoing public funding and governance compliance; and if he will make a statement on the matter. [12321/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

736. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport if he will review the governance and safeguarding conditions attached to Sport Ireland funding to ensure that adult participants are protected from bullying, harassment, and stalking within sporting organisations; and if he will consider making full compliance with adult safeguarding policies a mandatory requirement for receipt of funding; and if he will make a statement on the matter. [12322/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

737. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport the guidance, supports, or training that are provided by his Department or Sport Ireland to assist sporting organisations in developing robust adult safeguarding and anti-harassment policies; and whether ongoing funding is dependent on participation in these programmes and implementation of policy standards; and if he will make a statement on the matter. [12323/26]

Amharc ar fhreagra

Robert O'Donoghue

Ceist:

738. Deputy Robert O'Donoghue asked the Minister for Culture, Communications and Sport whether he accepts that the absence of clear adult safeguarding policies may discourage participation in sport, particularly among women and vulnerable adults; the steps that will be taken to make adult safeguarding compliance a condition of public funding, governance approval, and accountability; and if he will make a statement on the matter. [12324/26]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 732, 733, 734, 735, 736, 737 and 738 together.

Sport Ireland, which is funded by my Department, is the statutory body with responsibility for the development of sport, increasing participation at all levels and raising standards including athlete welfare.

Sport Ireland works with National Governing Bodies of Sport (NGBs) to ensure that appropriate policies are put in place to take a proactive approach to safeguarding by identifying and mitigating risks to athlete welfare. It also works with NGBs to ensure mechanisms are in place to appropriately react to and handle complaints or issues when they arise.

Ultimately, NGBs are independent autonomous organisations responsible for their own governance including safeguarding procedures and disciplinary and complaints processes.

I have referred the Deputy's questions to Sport Ireland for direct reply in relation to the matter raised by the Deputy and I would ask the Deputy to inform my office if a reply is not received within 10 days.

A referred reply was forwarded to the Deputy under Standing Orders.
Question No. 733 answered with Question No. 732.
Question No. 734 answered with Question No. 732.
Question No. 735 answered with Question No. 732.
Question No. 736 answered with Question No. 732.
Question No. 737 answered with Question No. 732.
Question No. 738 answered with Question No. 732.
Question No 739 answered with Question No 714.

Departmental Funding

Ceisteanna (740)

Erin McGreehan

Ceist:

740. Deputy Erin McGreehan asked the Minister for Culture, Communications and Sport to provide a list of all organisations and projects that received matched and-or partner funding from his Department in 2023, 2024 and 2025; the amount of funding allocated to each organisation or project; what was achieved and the stated outcomes from the funding provided in each case; the plans his Department has for the provision of matched and partner funding in 2026 and 2027, including the way such funding aligns with his Department’s philanthropy policy and objectives; and if he will make a statement on the matter. [12408/26]

Amharc ar fhreagra

Freagraí scríofa

My Department was re-configured as the Department of Culture, Communications and Sport at the beginning of June 2025. The details sought by the Deputy for the current functions under the remit of my Department are set out in the tables below.

Regarding Creative Arts funding, my Department publishes all payments on its website in tabular form for each county on an annual basis once they have been prepared for publication. Accordingly, a full list of all capital payments for 2023 and 2024 can be found at the following link: www.gov.ie/en/department-of-culture-communications-and-sport/publications/creative-arts-grants-and-funding-previous-schemes/. The list of capital payments for 2025 is currently being finalised and tabulated for publication and it is planned to publish it on the Department’s website at the above link by the end of February.

In Budget 2026, the Department was allocated €6m for a new programme of capital funding for arts and culture organisations across the country, in line with the commitment in the Programme for Government. The Department is in the process of designing the specifications of the scheme, including the setting of eligibility criteria.

My Department also runs the pilot Artist Workspaces Scheme which was launched in June 2024 with a total fund of €6 million to enable local authorities increase the provision of Artist Workspaces across Ireland. Capital grants up to a maximum of €300,000 may be made available to larger urban local authorities, with grants up to a maximum of €150,000 being made available to the remaining local authorities. The maximum grant available will be 60% of the eligible costs. Details of grants awarded to date can be found at the following link: www.gov.ie/en/department-of-culture-communications-and-sport/publications/creative-arts-grants-and-funding/#artist-workspaces-capital-scheme

As detailed below, the Regional Museum Exhibition Scheme (RMES) is designed to promote and enhance local and regional museums by providing financial support for capital exhibition costs. The scheme operates on a matched funding basis of 75:25, meaning that applicants must contribute 25% of the proposed costs. The maximum grant available to any successful applicant is €15,000.

PQ12408-26 Tables

National Library

Ceisteanna (741)

Conor Sheehan

Ceist:

741. Deputy Conor Sheehan asked the Minister for Culture, Communications and Sport if he is in favour of the National Library exhibiting letters (details supplied) and loaning same to county museums; and if he will make a statement on the matter. [12449/26]

Amharc ar fhreagra

Freagraí scríofa

I have consulted with the National Library of Ireland on this matter and the NLI holdings include other letters relating to the Catalpa Rescue. These manuscripts form part of the John Devoy Papers. John Devoy, Fenian and journalist, was also exiled in New York City during the time of the rescue. Digitised versions of the manuscripts are available on the National Library of Ireland website.

The National Library of Ireland will endeavour to put on a focus display in 2026 of collection material relating to the Catalpa Rescue and highlight this historical event through its communications channels.

The National Library lends materials from its collections for temporary exhibitions in Ireland and overseas. Requests for a loan of material is contingent on the submission of an application and conditions of loan such as those of environmental and security. Where it is not possible to loan original material, the National Library will provide surrogates.

Public Sector Pensions

Ceisteanna (742)

Robert Troy

Ceist:

742. Deputy Robert Troy asked the Minister for Culture, Communications and Sport if he will provide an urgent update on an increase to Eir pensions and confirm a series of matters (details supplied). [12491/26]

Amharc ar fhreagra

Freagraí scríofa

Further to section 46 of the Postal and Telecommunications Act 1983, as amended, and section 10 of the eircom superannuation scheme rules, my Department last year received a request for a pension increase of 2.1% for Eir pensioners, in respect of both pre and post vesting day service, with effect from 01 July 2025.

My officials sought the advice of the New Economy and Recovery Authority (NewERA) on this pension increase proposal, who recently submitted their report for consideration. Both my approval and the consent of the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation are required to give effect to this pension increase. I can confirm my approval was given and the case has been forwarded to the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation for consideration.

Under section 46 of the Postal and Telecommunications Services Act 1983, the Minister for Culture, Communication and Sport with the concurrence of the Minister for Public Expenditure, NDP Delivery and Reform, approves any superannuation schemes submitted by An Post. The operation of the schemes, including the Pension Accord (2013) and the payment of pension benefits, is a matter between the Management of An Post, staff representatives and the Trustees of the schemes.

In accordance with the Act and the relevant Code of Practice for the Governance of State Bodies, An Post must seek Ministerial approval from both Ministers to increase pensions and deferred pensions for members of the An Post superannuation scheme. Section 2.13 of the Code of Practice for Governance of State Bodies Superannuation and Remuneration annex sets out that NewERA advice should be sought in respect of pension amendment proposals, as is appropriate in their role as commercial and financial advisors to the Ministers.

On 23 October 2025, An Post wrote to my Department requesting consent for an increase to pensions in payment and deferred pensions, namely, to increase pensions in payment for members and deferred members of the An Post Superannuation Scheme by 6% per annum with effect from 1st January 2025 and 1% from 1 June 2025, arising from its agreements with employee representative groups.

In line with the Code of Practice, NewERA has provided its advice on the request for consideration. Both my approval and the consent of the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation are required to give effect to this pension increase.

The process to consider pension increase requests in respect of the Eir superannuation scheme, as well as the An Post superannuation scheme and pension schemes of other commercial state bodies is a rigorous, multi-stage process requiring formal NewERA advice and consideration by both Ministers. Accordingly, it is not possible to set out a definite timeframe as to when a final decision will be made on these requests. It should be recognised that the time taken for the pension approval process is necessary to ensure that robust governance procedures are followed, that the Code of Practice is complied with and the relevant legislation is adhered to.

Arts Funding

Ceisteanna (743)

Mairéad Farrell

Ceist:

743. Deputy Mairéad Farrell asked the Minister for Culture, Communications and Sport if the 2,000 artists who currently avail of the basic income for artists will face a six-month gap in payments; if this is the case, the financial supports his Department is providing for these people; and if he will make a statement on the matter. [12561/26]

Amharc ar fhreagra

Freagraí scríofa

I was delighted to launch the successor scheme to the Basic Income for the Arts on Tuesday 10th February following Government agreement at Cabinet. I am grateful to my Cabinet colleagues for their support for the BIA, an initiative which I believe sets Ireland apart in how we support our artists.

The focus of the BIA successor scheme is to support professional Irish based artists. I will publish detailed Guidelines for the scheme in April, however the parameters are broadly as follows:

• 2,000 artists will receive a payment of €325 per week for 3 years;

• Artists must be resident in the Republic of Ireland when applying and their artistic practice must be based in Ireland;

• Participants of the pilot scheme can apply, once they meet the eligibility criteria of the new scheme;

• Applications will open in May with payments starting by year end;

• Guidelines will be published in April setting out detailed eligibility criteria for the new scheme and how to apply.

The period of the Pilot scheme was initially 2022 - 2025, which I then extended for a further 6 months to February 2026, to allow work to begin on the successor scheme. The timelines for the ending of the pilot scheme have been consistently communicated to allow participants to plan accordingly. The BIA is not a social welfare scheme and therefore eligibility does not confer an entitlement to receive the payment.

Eligibility for the pilot does not automatically mean an artist is eligible for future rounds of the scheme. Applicants will need to demonstrate they are eligible under the new schemes guidelines, which will ensure a focus on professional artistic practice.

The BIA research has consistently demonstrated both the positive impact of the payment and I look forward to rolling out the successor scheme in the coming months. The BIA will help to sustain the careers of those artists who will receive it and to retain their talent in the arts sector.

Post Office Network

Ceisteanna (744)

Emer Currie

Ceist:

744. Deputy Emer Currie asked the Minister for Culture, Communications and Sport for an update on his Department's efforts to fulfil the Programme for Government commitment to provide the nationwide network of post offices with funding to ensure their sustainability and enhance the value they bring to local communities; and if he will make a statement on the matter. [12601/26]

Amharc ar fhreagra

Freagraí scríofa

The Government is committed to a sustainable An Post and post office network as a key component of the economic and social infrastructure throughout Ireland. The Programme for Government states that the Government will continue to provide the nationwide network of post offices with funding to ensure their sustainability and enhance the value they bring to local communities.

In that regard, on 13 January 2026, Government approved renewed funding for the Post Office Network over the next 5 years (2026-2030), at an enhanced amount of €15m per annum from my Department.

In line with the Programme for Government, the funding will support the stability and sustainability of the nationwide network of post offices, protecting and nurturing a commercially focused Post Office Network. It will also support access for citizens to the key social benefits of the Post Office Network and help citizens access services effectively and equitably.

The Government also agreed the principles on which the funding model will operate, which include:

• maintaining access to the network across urban and rural Ireland, ensuring no community is left behind.

• aligning individual funding with criteria including the degree of isolation and the sustainability of each post office.

• ensuring a minimum revenue threshold for post offices.

• recognising offices of cultural or geographic significance—such as those on inhabited islands or in Gaeltacht areas.

My Department is now seeking to progress the necessary legislation to place this funding on an appropriate statutory footing.

It should be noted that An Post is a commercial State body with a mandate to act commercially. An Post has statutory responsibility for the State's postal service and the post office network.

Decisions relating to the network, including decisions relating to specific post offices are operational matters for the Board and management of the company and not one in which I have any function.

The terms under which Postmasters contract with An Post is a matter between the Postmasters and An Post and any negotiations are a matter for both parties directly.

Question No 745 answered with Question No 727.

Sports Facilities

Ceisteanna (746)

Emer Currie

Ceist:

746. Deputy Emer Currie asked the Minister for Culture, Communications and Sport for an update on the development of the national cricket stadium; and if he will make a statement on the matter. [12603/26]

Amharc ar fhreagra

Freagraí scríofa

In 2025, the revised National Development Plan reiterated the Government’s commitment to the continued development of the Sport Ireland Campus, including the National Cricket Centre (NCC).

The delivery of the NCC is in keeping with key Government priorities as set out the National Sports Policy 2018-2027 and my Department’s Statement of Strategy, which includes a high-level goal to continue to invest in new sports facilities, high performance athletes and the hosting of major events.

Planning permission for Phase 1 of the project was granted by Fingal County Council on 11 November 2025. Phase 1 will deliver the main field of play, 4,240 spectator seats, a high-performance centre and player and match officials building. The project will also include supporting infrastructure. This phasing approach to the overall project will ensure that an appropriate facility is in place in time for the 2030 T20 World Cup, which Ireland will co-host.

The tender process for the first construction contract of Phase 1 is currently being managed by Sport Ireland following my approval of the Pre-Tender Estimate on 13 November 2025. My Department is also currently engaging with Sport Ireland on the Final Business Case for the project to ensure compliance with the Infrastructure Guidelines and the Capital Works Management Framework.

Subject to the successful completion of the procurement and final business case processes, I intend to bring a Memo to Government in the coming months seeking approval for the project funding and the appointment of the main contractor. It is anticipated that construction will begin later this year.

The NCC will play a crucial role in addressing the need to provide world-class cricket facilities by providing playing, training and practice facilities to enable Ireland’s elite teams to compete at the highest international levels. It will also provide Cricket Ireland with the facilities to assist it in growing participation in cricket and to enable Ireland to compete as a host nation for major cricket events.

Sport and Recreational Development

Ceisteanna (747)

Emer Currie

Ceist:

747. Deputy Emer Currie asked the Minister for Culture, Communications and Sport the actions his Department is taking to increase female participation in all sports from grassroots to elite levels; and if he will make a statement on the matter. [12604/26]

Amharc ar fhreagra

Freagraí scríofa

The participation of women in sport is an important element of both the National Sports Policy 2018-2027 and the associated Sports Action Plan 2024-2027 and represents a core priority for me and my Department.

This Government is committed to a "Sport for All" approach aimed at ensuring that all persons can partake equally in sport and physical activity. This commitment is reaffirmed in the Programme for Government and is also reflected in Sport Ireland's Women in Sport Policy.

The Women in Sport funding programme, administered by Sport Ireland, was first established in 2005 and since then over €30 million has been invested through the National Governing Bodies of Sport (NGBs) and the Local Sports Partnership network.

Sport Ireland’s Women in Sport Policy was launched in 2019 and was subsequently updated in 2023 due to advancements made within the sector and society in general. It builds on the significant work that has already been undertaken in this area and, in recognising the opportunity to make a significant impact on the lives of women through their involvement in sport, it provides a blueprint for Sport Ireland’s future work.

In 2025 Sport Ireland announced an investment of €4 million under the Women in Sport programme. This is vital funding to support sporting bodies, and my Department will continue to support programmes to increase women’s participation in all sports and to progress strategic objectives for women in sport across all areas including active participation, coaching, officiating, and leadership.

The Irish Sports Monitor (ISM) Report for 2024, shows that sport participation levels among women is at 47%, an increase of one percentage point since 2023, and the gap between men and women is now less than 3%.

Sport Ireland will be holding its annual Women in Sport Week in March to coincide with International Women’s Day which will serve to promote the visibility of women in sport at all levels in Ireland.

As Minister for Sport, I will continue to tackle issues to ensure that women’s sport reaches parity with its male equivalent and that females do not drop out of sport due to a lack of adequate training facilities or access to opportunities.

Sports Funding

Ceisteanna (748)

Emer Currie

Ceist:

748. Deputy Emer Currie asked the Minister for Culture, Communications and Sport to provide an update on his Department's investment following the €3 million in funding provided in Budget 2026 for League of Ireland academies; and if he will make a statement on the matter. [12605/26]

Amharc ar fhreagra

Freagraí scríofa

My Department provided additional funding grant of €1 million to the FAI in 2024 which enabled the FAI to appoint an Academies Administrator to support the development of new academy programmes and to track their impact. The grant has also enabled the FAI to produce its League of Ireland Global Findings Report on developing football academies in Ireland, including an audit of existing academy structures and needs.

The report outlines 50 recommendations which, if implemented in the coming years, should create a strong Academy system that would underpin a sustainable domestic football league and, ultimately, strengthen the quality of players coming through to the national teams.

As part of Budget 2026, I was pleased to announce a €3 million multi-annual allocation to support the development of a modern and professional academy system that will provide the structures and pathways required to support future generations of Irish players, male and female, and maximise the potential of Irish football.

Specific details regarding how this investment will be channelled will be set out in due course following engagement between the FAI and Sport Ireland, the development agency for Irish sport. I have met with Sport Ireland and the FAI on this matter and I have asked my officials to track progress in this regard.

The Government is committed to supporting the development of Ireland’s sporting ecosystem and the support that continues to be provided for football is a key example of that commitment in action.

National Broadband Plan

Ceisteanna (749)

Emer Currie

Ceist:

749. Deputy Emer Currie asked the Minister for Culture, Communications and Sport for an update on the progress of the national broadband plan in Dublin; and if he will make a statement on the matter. [12606/26]

Amharc ar fhreagra

Freagraí scríofa

In December 2022, Ireland's Digital Connectivity Strategy was published which supports the ambition outlined in the National Digital Strategy and set out a number of targets including that all Irish households and businesses will be covered by a Gigabit network no later than 2028.

The Programme for Government – Securing Ireland’s Future published in January 2025 sets a number of targets which include the completion of the installation of high-speed fibre broadband to 1.1 million people, including homes, farms, and businesses nationwide, by 2026.

The National Broadband Plan (NBP) is the government's initiative to deliver high speed broadband services to all premises in Ireland.

In Dublin a significant investment of €48 million is being made under the NBP. There are over 9,290 premises passed with a high-speed fibre broadband network and 10,327 available to order/pre-order, with 2,807 premises now connected. A further circa 3,700 premises in Dublin will be passed by NBI’s high speed fibre broadband by the end of the network deployment.

Premises located in the Donabate/Portrane Deployment Area (D.A) are currently in the network build phase. These premises have an anticipated date for connection between April 2026 and June 2026.

Further details are available on specific areas within County Dublin and can be monitored via https://nbi.ie/reps/ . NBI has a dedicated email address, reps@nbi.ie, which can be used by Oireachtas members for specific queries. It should be noted that NBI provide this information for County Dublin based on NBI deployment areas rather than exact county boundaries.

Along with the NBP intervention contract, progress is being made by commercial operators’ in expanding their next generation networks throughout the State and ensuring the targets set out in the Digital Connectivity strategy are achieved.

Departmental Policies

Ceisteanna (750)

Emer Currie

Ceist:

750. Deputy Emer Currie asked the Minister for Culture, Communications and Sport for an update on progress made to date and the plans for the future for the expansion of the night-time economy action plan for Dublin; and if he will make a statement on the matter. [12607/26]

Amharc ar fhreagra

Freagraí scríofa

The Night-Time Economy is an important component in the development of towns and cities, playing a crucial role in economic growth, cultural vibrancy, social vitality, and urban regeneration. The Night-Time Economy pilots are a priority project for the department to support the development of the Night-Time Economy in Ireland. The Night-Time Advisor in Dublin has been working closely with key stakeholders and partners in the city, creating a sense of common purpose and cohesion among stakeholders and groups. The pilot in Dublin city has already yielded a range of positive outcomes, particularly in the area of safety at night and the development of a culturally vibrant city.

In 2025, my department provided just over €209,000 in funding towards salary costs and the development and roll out of the Dublin City Night-Time Economy action plan which included support for Culture Night Late, Brigit Late, St Patrick’s Festival After Dark and a safety campaign which includes free online vulnerability and safeguard training for venues and businesses at night. In addition, last year Dublin City Council launched the ‘Nee-Naw’ van, which was developed by the Night-Time Advisor and is funded by the Department of Justice.

Early this year, the Night-Time Advisor in Dublin with funding support from my department, launched the ‘Dublin Nights Mapped’ which showcases all the things to do after 6pm in the city that isn’t focused on alcohol. This supports the Night-Time Economy Taskforce objective to develop and offer an alternative range of activities that are inclusive, diverse and reflective of today’s trends and society.

This year, I have committed funding to support the salary and further roll out of the action plan for Dublin city. However, the pilot initiative is currently under review. Last year, we commissioned Communiqué International to conduct an independent review of the 9 Night-Time Economy pilots, to look critically at the structures involved in supporting the Advisors, the visibility and impact of each in their respective areas, the future roll-out of the pilots and whether a further roll-out is warranted and what needs to be put in place to make this model effective.

I have now examined the findings in the Report from the review, and I have met with my officials in relation to the recommendations outlined in the Report. Discussions have now commenced between my department and local government in relation to the outcomes of the review. At this point, it would not be appropriate to comment on the possible future arrangements whilst those discussions are ongoing.

I intend to publish the Review in the coming weeks, and I look forward to the outcome of those discussions with our local government colleagues on the future roll out of the pilots.

Question No 751 answered with Question No 714.

Pension Provisions

Ceisteanna (752)

Paul Lawless

Ceist:

752. Deputy Paul Lawless asked the Minister for Culture, Communications and Sport to provide dates (details supplied), in relation to the authorisation process for pension increases agreed by An Post and the trade unions over the period January 2021 – February 2026; the control he exercises over the discretion claimed by An Post around its pension scheme, in tabular form; and if he will make a statement on the matter. [12884/26]

Amharc ar fhreagra

Freagraí scríofa

Under section 46 of the Postal and Telecommunications Services Act 1983, the Minister for Culture, Communication and Sport with the concurrence of the Minister for Public Expenditure, NDP Delivery and Reform, approves any superannuation schemes submitted by An Post. The operation of the schemes is a matter between the management of An Post, staff representatives and the trustees of the schemes.

In accordance with the Act and the relevant Code of Practice for the Governance of State Bodies, An Post must seek Ministerial approval from both Ministers to increase pensions and deferred pensions for members of the An Post superannuation scheme. Section 2.13 of the Code of Practice for Governance of State Bodies Superannuation and Remuneration annex sets out that NewERA advice should be sought in respect of pension amendment proposals, as is appropriate in their role as commercial and financial advisors to the Ministers.

It should be recognised that the time taken for the pension approval process is necessary to ensure that robust governance procedures are in place, that the Code of Practice is complied with and the relevant legislation is adhered to.

The details requested by the Deputy are set out in the table below. With regard to dates of agreements between An Post and Unions, such details would be held directly by An Post itself and queries regarding same should be addressed to An Post at OireachtasEnquiries@anpost.ie

’22 Request

’23 Request

’24 Request

Jan ’25 Request

October ’25 Request

Date of Request received from An Post

04/05/2022

09/03/2023

21/06/2024

23/01/2025

23/10/2025

Date of request for Advice from Department to NewERA

06/07/22

10/03/2023

24/06/2024

28/01/2025

30/10/2025

Receipt of Advice from NewERA

09/08/22

29/06/2023

16/08/2024

26/03/2025

14/01/2025

Date of Submission to DPER by DCCS

17/08/22

29/08/2023

26/09/2024

13/05/2025

05/02/2025

Receipt of PER decision

08/09/22

08/09/2023

15/10/2024

27/05/2025

Awaited.

Date of Conveyance to An Post

09/09/22

08/09/2023

17/10/2024

29/05/2025

Pending above.

Question No 753 answered with Question No 714.
Question No 754 answered with Question No 714.
Question No 755 answered with Question No 714.

Coastal Erosion

Ceisteanna (756)

Roderic O'Gorman

Ceist:

756. Deputy Roderic O'Gorman asked the Minister for Housing, Local Government and Heritage if he will provide an update on the implementation of the recommendations contained in the Report of the Interdepartmental Group on National Coastal Change Management Strategy of 26 October 2023; in particular, the actions that have taken place to monitor, mitigate, manage and prevent coastal erosion and consequent flooding; if a review of the effectiveness of the Coast Protection Act 1963 is planned with a view to strengthening the ability of local authorities to combat coastal erosion; and if he will make a statement on the matter. [12477/26]

Amharc ar fhreagra

Freagraí scríofa

My Department is aware of the ongoing and evolving risks posed by erosion, flooding and wave overtopping in coastal areas, including the risks these pose to property, infrastructure and public safety.

Ireland’s approach to coastal change continues to be informed by the recommendations of the Report of the Inter-Departmental Group on National Coastal Change Management Strategy published on 26 October 2023, which sets out an initial, evidence-based framework for managing coastal change over the short, medium and long term. The Report contains 15 recommendations structured across three strategic pillars:

1) Enhancing governance and capacity building;

2) Improving understanding of risk and identifying potential technical options; and

3) Developing management responses to coastal change.

The Government agreed, alongside the publication of the Report, the immediate establishment of an Inter-Departmental Steering Group on Coastal Change to oversee the progression of the recommendations and to ensure a coordinated, whole-of-government response. The Steering Group, chaired by my Department, meets regularly in this context, most recently earlier this year, and is due to meet again shortly.

Progress under the Strategy includes continuing to improve the evidence base for coastal change and risk, enhancing governance arrangements, and supporting engagement between relevant public bodies to develop appropriate policy and technical responses. The Office of Public Works (OPW) continues to lead at national level on coastal hazard and risk assessment, including mapping and monitoring of coastal flood and erosion risk. It also works in partnership with local authorities on the planning and delivery of flood risk management and coastal protection measures. Local authorities remain responsible in the first instance for the consideration, planning and implementation of any site-specific coastal protection or flood mitigation measures, having regard to technical, environmental and statutory requirements, and may seek support through the OPW’s funding schemes such as the Minor Flood Mitigation Works and Coastal Protection Scheme.

My Department will continue to work with the OPW, local authorities and other stakeholders to monitor and, where necessary, respond to coastal change risks in a manner consistent with the national policy framework.

My Department recognises that the framework established under the Coast Protection Act 1963 is a key element of Ireland’s coastal management regime. The Inter-Departmental Steering Group on Coastal Change has established a dedicated working group to review current legislative and regulatory arrangements, with a view to assessing whether legislative changes may be needed to strengthen the ability of local authorities and other statutory bodies to address evolving coastal change challenges. The outcomes of this work will inform future recommendations under the overall Strategy and any proposals to amend or update legislation will be brought forward as appropriate.

Roinn