Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Tuesday, 21 Apr 2026

Written Answers Nos. 362-382

Departmental Expenditure

Ceisteanna (362)

Carol Nolan

Ceist:

362. Deputy Carol Nolan asked the Minister for Defence further to Parliamentary Question No. 270 of 24 February 2026, the cost of all external ab initio pilot training, technician training and specialist ordnance/mortar courses delivered by private providers in each of the years 2023, 2024 and 2025; and if she will make a statement on the matter. [28412/26]

Amharc ar fhreagra

Freagraí scríofa

The material requested by is not readily available but is being compiled by my Department and I will provide a full response to the Deputy as soon as all the required information has been collated.

Departmental Expenditure

Ceisteanna (363)

Carol Nolan

Ceist:

363. Deputy Carol Nolan asked the Minister for Defence further to Parliamentary Question No. 270 of 24 February 2026, the total cost of the transport vehicle body repair and recovery contract and the contract for PDF and RDF occupational and induction Part 2 medicals in each of the past three years; and if she will make a statement on the matter. [28413/26]

Amharc ar fhreagra

Freagraí scríofa

The detailed information sought by the Deputy is not readily available within the time frame sought. The information is being compiled by my officials and I will arrange to have it forwarded to the Deputy as soon as it is available.

The following deferred reply was received under Standing Orders.
Dear Deputy Nolan,
I refer to Parliamentary Question 363, which was for answer on 21st of April 2026. This parliamentary question was deferred as the information sought was not readily available within the time frame.
As the Deputy is aware there is an ongoing shortage of qualified vehicle body repair technicians which has created a dependency on external service providers to complete critical repairs. Without outsourcing, significant delays in returning vehicles to operational service negatively impacts fleet readiness and mission support. Establishing these external contracts safeguards continuity of service and ensures value for money.
I am advised by the Defence Forces that their records show expenditure for the last 3 years of €712,425 in total. The breakdown of this amount is set out in tabular form below.
Annualised expenditure on vehicle body repair and recovery

Year

Cost

2025

€166,432

2024

€248,654

2023

€297,339

A wide range of primary care medical services, encompassing a broad array of disciplines are provided to members of the Permanent Defence Force under the auspices of the Defence Forces Medical Corps. A range of measures to ensure continuity of service of all aspects of medical care to personnel are employed, including outsourcing, contracted professionals and agency workers, as appropriate.
I am informed by the military authorities that expenditure on contract medicals for PDF/RDF 2023-2025 was €385,340 in total.
The breakdown of this amount is set out in tabular form below.
Annualised expenditure on Contract Medicals

Year

Cost

2025

€138,140

2024

€185,640

2023

€61,560

The principle of competitive tendering for Government contracts is used by the Department of Defence and the Defence Forces for the acquisition of goods and services. This is an EU law requirement and is in accordance with the Defence and Security Directive.
Central to those procedures is the requirement to allow fair competition between suppliers through the submission of tenders following advertising of the tender competition on the e­Tenders site and on the Official Journal of the European Union (OJEU), where appropriate.
If the Deputy would like further information on the above expenditure, officials in my department will be happy to assist.

Departmental Expenditure

Ceisteanna (364)

Carol Nolan

Ceist:

364. Deputy Carol Nolan asked the Minister for Defence further to Parliamentary Question No. 270 of 24 February 2026, whether a cost-benefit analysis or value-for-money audit has been carried out on any of the outsourced services listed in her reply; if so, to provide the key findings and recommendations of each such analysis; and if she will make a statement on the matter. [28414/26]

Amharc ar fhreagra

Freagraí scríofa

My Department has a broad range of audit and assurance arrangements in place that provide financial regularity and probity and ensure ongoing adherence to core Value for Money (VFM) principles. These arrangements encompass strong internal controls such as financial delegation and accountability, clear segregation of duties, monthly Management Board scrutiny, an embedded risk management system and a Research and Evaluation unit. These structures are further complemented and strengthened by ongoing reviews undertaken by an independent Internal Audit Unit and robust external scrutiny, both ongoing and periodic, from, inter alia, the Comptroller and Auditor General, the Public Accounts Committee and the Department of Public Expenditure, Infrastructure, Public Service Reform & Digitisation. Collectively, this comprehensive approach to governance enhances transparency, safeguards public funding, and ensures that all Defence spending is well-managed and compliant with applicable public financial and procurement procedures.

There have been no formal Cost Benefit Analysis or Value for Money audits carried out on the outsourced services listed in Parliamentary Question No. 270 of 24 February 2026.

The outsourced services the Defence Forces have engaged external service providers for are to enhance capacity or to perform the duty or service due to temporary personnel or skills shortages.

Departmental Expenditure

Ceisteanna (365)

Carol Nolan

Ceist:

365. Deputy Carol Nolan asked the Minister for Defence further to Parliamentary Question No. 270 of 24 February 2026, the estimated additional cost to the Defence Forces of outsourcing second-line aircraft maintenance and civilian technician support in the Air Corps compared with performing these functions in-house, for each of the years 2023 to 2025; and if she will make a statement on the matter. [28415/26]

Amharc ar fhreagra

Freagraí scríofa

The material requested by is not readily available. I will provide a full response to the Deputy as soon as all the required information has been collated.

Departmental Expenditure

Ceisteanna (366)

Carol Nolan

Ceist:

366. Deputy Carol Nolan asked the Minister for Defence further to Parliamentary Question No. 270 of 24 February 2026, whether she has sought or received any estimates of the potential savings that could be achieved by insourcing the long-term outsourced functions (details supplied); if so, to provide those estimates together with the proposed timelines for any such insourcing; and if she will make a statement on the matter. [28416/26]

Amharc ar fhreagra

Freagraí scríofa

The material requested by is not readily available . I will provide a full response to the Deputy as soon as all the required information has been collated.

Programme for Government

Ceisteanna (367)

John Paul O'Shea

Ceist:

367. Deputy John Paul O'Shea asked the Minister for Defence the progress made on each of the individual Programme for Government commitments assigned to her Department; and if she will make a statement on the matter. [28654/26]

Amharc ar fhreagra

Freagraí scríofa

Since the publication of our Programme for Government: Securing Ireland’s Future, in January 2025, a great deal has been achieved, including the following:

Programme for Government Commitment

Action taken by Department of Defence

Building on the progress achieved by the previous government, this government is committed to the ongoing transformation and modernisation of Oglaigh na hÉireann across land, air, sea and cyber domains.

Continue to support the High Level Action Plan on the implementation of the Commission on Defence Forces, including the identification of HQ locations.

54 of the Recommendations of the Commission on the Defence Forces were completed by end of Q1 2026. The actions contained in the Strategic Framework 2026, and the Updated Detailed Implementation Plan for the Commission on the Defence Forces will continue to be actioned throughout 2026.

The Government will preserve and protect Ireland’s policy of active military neutrality. We also recognise that while we strongly value our military neutrality, we are not politically neutral. We will continue to engage with international partners and we will reform the Triple Lock legislation whilst also ensuring that amendments to the legislation are in keeping with our values and policy of active military neutrality.

The General Scheme of the Defence (Amendment) Bill 2025 was published in May 2025. The purpose of this legislation is to consolidate and amend the existing legislative provisions regarding the Triple Lock, taking account of the changed geo-political environment in which the Defence Forces now operate.

The proposed legislation continues to preserve Ireland's policy of military neutrality, while affording the Government greater autonomy on the deployment or despatch of more than 12 troops overseas. It is anticipated that the full text of the Bill go to government for approval by the end of Q2 2026.

Continue to increase investment in Defence, providing the funding and political support necessary to achieve Level of Ambition 2 Enhanced Capability, and move as quickly as possible to Level of Ambition 3 with commensurate investment as appropriate.

Following a record investment of €1.35 billion for the Defence Vote in Budget 2025, Budget 2026 provided a further increased allocation of €1.49 billion for the Defence sector.

An additional €1.7 billion was also allocated for capital investment under the National Development Plan 2025-2030.

Deliver continued reform of the military leadership structures, including the changes necessary to establish a new Chief of Defence (CHOD) role.

Approval to draft Heads of Bill on these complex legislative provisions was agreed in 2025. It is expected that the General Scheme of the proposed legislation to establish the role of Chief of Defence, in line with the recommendations of the Commission on the Defence Forces, will be brought to government for approval in 2026.

Ensure full delivery of the new Joint Cyber Defence Command strategy published by the last Government.

A dedicated Joint Cyber Defence Command has been established, led at a new senior position of Brigadier General rank, taking over cyber operations previously led by Communications and Information Services (CIS) Corps. Additional staff have been approved to resource this new Command in achieving its initial operational capacity.

Prioritise the regeneration and growth of Ireland’s Naval Service, including the Naval Reserve, with a focus on protecting our significant and expanding sub-sea data cabling infrastructure and emerging offshore energy sector.

Following the establishment of a force design team for the Naval Service, work continues apace on the regeneration of the Naval Service, with targeted recruitment and retention campaigns executed throughout 2025. In addition, renovation works at Haulbowline are ongoing and have already increased the number and quality of accommodation available at the Base.

The strength of the Naval Service grew in 2025 from 719 at the beginning of the year, to 784 personnel at year end. Finalisation and actioning of a Naval Service Regeneration Plan will take place during 2026.

In June 2025, a contract was awarded to Thales France for towed sonar capability, which heralds new and growing opportunities for the Naval Service in the coming years.

Review our military intelligence structures to ensure that our intelligence services are optimised to protect national security.

A General Scheme of a Bill is currently being drafted so that the roles and functions of Military Intelligence will be underpinned by legislation.

The rollout of Defence Attaché network is being progressed.

Plan for the interoperability of specialist Defence Forces with specialist units of An Garda Siochana on national defence matters.

Significant engagement was conducted between the Defence Forces and An Garda Siochana throughout 2025, with a focus on interoperability between Special Operations Forces and the Emergency Response Unit of An Garda Siochana. Agreement was reached on the continued alignment of processes and procedures between the DF and AGS.

Continue to drive forward modernisation and cultural change, fully supporting the External Oversight Board in its work, implementing outstanding IRG recommendations and making our military a modern, effective and attractive employer of choice

The Department of Defence recognises the External Oversight Board as a critical element in driving the necessary changes in workplace culture and behaviour in the Defence Forces, and in increasing transparency and accountability. The Body oversees and monitors the management of human resources of the Defence Forces, by the Defence Forces, and provides advice to the Minister on any matters arising from these oversight functions.

The External Oversight Board submitted its first report as a Statutory Entity to the Minister for Defence in July 2025. It published a public consultation on its Strategy Statement in Q3 2025.

The Body appointed a Military Subject Matter Expert to support the work of the Body.

Cooperate fully with the Tribunal of Inquiry into Certain Matters relating to the complaints processes in the Defence Forces.

The Tribunal issued Orders for Discovery against the Minister for Defence on 27 January 2025 and the Chief of Staff on 28 January 2025 requiring the discovery of documents held in the Department of Defence / Defence Forces which come within the Terms of Reference for the Tribunal. This significant discovery exercise, covering four decades of documents, was completed in Q4 2025. The Department continues to cooperate fully with the Tribunal of Inquiry.

Continue the process of improving pay and conditions for serving personnel, while also continuing to build on improvements in the recruitment process including a nationwide programme for Transition Year and Third Level students, with a view to achieving the target of 11,500 personnel and better representation of women at all levels of the Defence Forces.

Following the significant progress that has been made on pay and benefits for the Defence Forces, the most recent pay increase awarded in August 2025 resulted in the application of the following starting salaries:

(i) Recruits on completion of training are paid:

€41,880 Year 1 (€14,121 or a 51% increase since 2019)

(ii) A school leaver Cadet on commissioning is paid €45,795 (representing an increase of €14,911 or 48% from 2019). After 2 years, their pay rises to €51,184.

(iii) The pay rate for a graduate entrant on commissioning begins at €51,184. All pay rates are inclusive of the Military Service Allowance.

In addition, the following matters were instigated and continued throughout 2025:

• The Service Commitment Scheme previously available to pilots in the Air Corps was extended to Air Traffic Controllers.

• The extension of private medical care to all ranks in the Defence Forces.

• A doubling of the Patrol Duty allowance, effective from 1 January 2024.

• Extension of the Naval Service tax credit for a further five years.

• The implementation of a payment to Officer Instructors in the Defence Forces (this was 2025).

• The application of the Working Time Directive across the Defence Forces in January 2025 subject to certain exemptions.

As of the 31 December 2025, the strength of the Permanent Defence Force (PDF) stood at 7,756 personnel; an increase of almost 200 personnel on the total of 7,557 recorded at the end of 2024 and 206 on the 7,550 end of year strength in 2023.

The outsourcing of elements of the recruitment process for the Naval Service including the targeting of skilled individuals required by the Naval Service. 23 Direct Entry Naval Service specialists were recruited in 2025 as of 30 November, the largest amount in over 5 years.

Continue to examine incentives and structural changes to make a military career accessible to a wider range of candidates, and to encourage existing personnel to extend their military careers, including Rewarding Long Service and broadening eligibility criteria.

Since the mandatory retirement age for Defence Force members increased from 60 to 62 on 19 August 2024, currently 20 officers and 83 enlisted personnel in this age group are still serving who would have had to retire at 60 under the mandatory retirement age regulations in place prior to that date. A further 19 personnel remained in service past the age of 60 since 19 August 2024, who since retired. Therefore, in total, 122 personnel availed of the opportunity to continue their careers after the age of 60 since August 2024.

In 2023, 755 members retired/discharged from the Defence Forces, in 2024 that number was 674 and 583 personnel retired or discharged in 2025.

A number of very positive retention measures have been introduced in recent years for members of the Defence Forces. The reduction in the numbers leaving is due to a multitude of factors. Given the numbers who are continuing their military careers past the previous retirement age, the increased mandatory retirement age would appear to be a contributory factor.

Establish a properly resourced Office of Veterans Affairs, based within the Department of Defence and working across Government to assist with the needs of our veterans.

In line with this government's commitment in the Programme for Government, and the recommendations of the Commission on the Defence Forces, the Department of Defence established the dedicated Office of Veterans Affairs in Q4 2025.

Ensure the further development of our Reserve Defence Force, ensuring that the newly established Office of Reserve Affairs and the Regeneration and Development Plan is fully resourced and equipped and take all steps to increase the number of reserves.

The Department of Defence continues to implement the initiatives contained in the RDF Regeneration and Development Plan, which was published in 2024 and has already resulted in positive changes for the RDF.

The Department is carrying out a review of the Reserve Defence Force, which started in Q2 2025 and will continue through the first half of 2026. This includes a review of the relevant legal and policy frameworks.

Specialist recruitment for the RDF continues, with increased upper recruitment and mandatory retirement ages introduced, the implementation of new and improved onboarding and induction processes and initiatives aimed at female participation among the changes implemented.

Implement the ‘Civil Defence – Towards 2030’ policy, including delivery of a new centralised volunteer and equipment management system.

Each of the 28 Civil Defence Units across the country carried out a review of its Development Plan throughout 2025 for the current multi-annual planning process.

The Civil Defence also continues to invest in the online Volunteer and Equipment Management System, which brings together all key Civil Defence volunteer, duty and equipment management information on one platform.

Ensure effective implementation of the Working Time Directive.

The blanket exclusion of the Defence Forces from the Organisation of Working Time Act 1997 was removed, subject to the derogations permitted by the Working Time Directive.

Deliver enhanced radar capability for the country, with an integrated Monitoring and Surveillance System across Maritime, Land and Air domains.

In line with the assessment of the joint civil-military Project Team, a Government-level approach was deemed to be the most effective way for Ireland to develop the required radar capabilities. This approach guarantees the use of the experience and knowledge of a trusted partner country which cannot be provided through any other option, particularly as we need to procure a new capability in order to develop a complete Recognised Air Picture.

The Preliminary Business Case concluded that the French proposal substantially fulfils Ireland’s capability requirements under this Programme and provides a high level of confidence in their overall ability to deliver across all aspects. The first phase of the Military Radar Project is currently being rolled out, including the acquisition of Counter UAS capabilities in advance of Ireland assuming the Presidency of the EU.

Upgrade the military transport fleet, deliver additional Air Corps capacity, and deliver next generation radio communications and signal equipment.

Air Corps capability was strengthened considerably with the following additions to the existing fleet:

A third C295 aircraft was delivered in October 2025, which is capable of troop transport, as well as maritime patrol operations.

The Strategic Reach Aircraft was delivered in December 2025, providing greater range (in distance and mission type) for the Air Corps.

Progress the Naval Service Vessel Renewal and Replacement Programme, replacing secondary armament across the fleet and enhancing our subsea capabilities

2025 was the first full year of operations of the L.E. Aoibhinn (P71)- one of two Inshore Patrol Vessels purchased from New Zealand, and commissioned in 2024. This increased the Naval Service patrol and monitoring presence in the Irish Sea.

The programme of works for the midlife refit and upgrade of the P50 class vessels, the LÉ Róisín and the LÉ Niamh, has been completed. Both ships are currently in operational reserve.

A contract was signed with Thales France to develop Ireland's subsea capability in June 2025.

We will continue to develop our maritime support infrastructure, investing to future proof Haulbowline Naval Base, and establishing an additional East Coast Base for the Naval Service.

We will audit the existing military estate and examine the feasibility of developing new accommodation on the estate for military personnel.

Building on the Infrastructure Development Plan, the Government approved the development of a series of Masterplans for each military installation in the state, including Haulbowline Naval Base. Each masterplan will:

- identify the future development of Defence sites

- future proof infrastructure to achieve LOA2 and LOA3

- identify the need for any restrictions on areas in proximity to installations.

In addition in 2025 the Upgrade of Block 4 Accommodation in Haulbowline Naval Base was completed providing accommodation for some 74 personnel and the refurbishment of Block 9 at a contract value of over €9m continued with a projected completion in mid 2026

We will continue the transformational investment in the military estate and the upgrading of barracks across the country, including major upgrade of Casement Aerodrome, Baldonnel.

The Airside Masterplan for Casement Aerodrome was completed in 2025, with development options equivalent to over €200 million in investment. By end of year 2025, eight capital investment projects had been completed at Casement Aerodrome, with a further project under construction.

Vehicle Registration

Ceisteanna (368)

Barry Ward

Ceist:

368. Deputy Barry Ward asked the Minister for Transport the number of new cars sold in Ireland in each of the years 2024, 2025 and to date in 2026, broken down by fuel type; and if he will make a statement on the matter. [27887/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister of State with responsibility for International and Road Transport, Logistics, Rail and Ports, I wish to clarify that the Department of Transport has no role in the sale of vehicles. Vehicle registration details are supplied by the Revenue Commissioners to the Department and form the point of entry to the National Vehicle and Driver File (NVDF).

The table below shows the number of newly registered vehicles on the NVDF in 2024, 2025 and 2026 (to date), by fuel type.

Fuel Type

2024

2025

2026

DIESEL

17,028

15,813

9,122

DIESEL/ELECTRIC

797

1,147

1,169

DIESEL/PLUG-IN HYBRID

242

287

281

ELECTRIC

11,942

18,558

12,555

PETROL

23,223

22,800

11,906

PETROL/ELECTRIC

17,557

21,121

15,752

PETROL/PLUG-IN HYBRID

7,505

14,810

8,368

Total

78,294

94,536

59,153

Vehicle Registration

Ceisteanna (369)

Barry Ward

Ceist:

369. Deputy Barry Ward asked the Minister for Transport the number of new cars sold in Ireland in each of the years 2024, 2025 and to date in 2026, broken down by their country of origin; and if he will make a statement on the matter. [27888/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister of State with responsibility for International and Road Transport, Logistics, Rail and Ports, I wish to clarify that the Department of Transport has no role in the sale of vehicles. Vehicle registration details are provided to the Department by the Revenue Commissioners, who act as the point of entry to the National Vehicle and Driver File (NVDF).

It is understood that the Deputy’s question relates to imported vehicles and, on this basis, the table below sets out the number of newly registered imported private vehicles recorded on the NVDF in 2024, 2025 and 2026 (to date). It should be noted that, for most of these vehicles, the NVDF does not record the country of origin.

Import Year

Number of Imported Vehicles

2024

60,998

2025

70,465

2026

22,995

Vehicle Registration

Ceisteanna (370)

Barry Ward

Ceist:

370. Deputy Barry Ward asked the Minister for Transport the number of second-hand cars purchased in Ireland in each of the years 2024, 2025 and to date in 2026, broken down by fuel type; and if he will make a statement on the matter. [27889/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister of State with responsibility for International and Road Transport, Logistics, Rail and Ports, I wish to clarify that the Department of Transport has no role in the sale of vehicles. Vehicle registration details are supplied to the Department by the Revenue Commissioners, who act as the point of entry to the National Vehicle and Driver File (NVDF). The Department’s role is limited to the recording of vehicle taxation and changes of vehicle ownership.

While it is not possible to provide the Deputy with figures relating specifically to second-hand car sales, information is available in respect of vehicles that have undergone a change of ownership. It should be noted that a change of ownership does not necessarily constitute a sale, as a vehicle may undergo multiple changes of ownership within a single calendar year, for example from a motor dealer to a company, and subsequently from a company to a private individual.

The table below shows the number of private vehicles that have recorded a change of ownership on the NVDF in 2024, 2025 and 2026 (to date) categorised by fuel type.

Fuel Type

2024

2025

2026

DIESEL

537,353

529,757

154,010

DIESEL/ELECTRIC

3,654

4,371

1,890

DIESEL/PLUG-IN HYBRID

1,038

1,471

638

ELECTRIC

24,464

33,744

13,970

ETHANOL/PETROL

2,469

2,223

666

GAS

490

544

127

PETROL

328,644

328,353

100,671

PETROL/ELECTRIC

53,955

65,262

25,025

PETROL/PLUG-IN HYBRID

22,538

33,060

13,174

Total

974,605

998,785

310,171

Bus Services

Ceisteanna (371)

Cathy Bennett

Ceist:

371. Deputy Cathy Bennett asked the Minister for Transport whether he or his Department and the National Transport Authority will consider the introduction of a local link service in Corcaghan, Beaghkearns and Stranooden areas in County Monaghan; and if he will make a statement on the matter. [27910/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister of State at the Department of Transport with special responsibility for Rural Transport, I have responsibility for policy and overall funding in relation to rural public transport service provision; however, I am not involved in the day-to-day operations.

The National Transport Authority (NTA) has statutory responsibility for securing the provision of public passenger transport services nationally including the Connecting Ireland Rural Mobility Plan and TFI Local Link services. In light of the NTA responsibilities I have referred your question to the NTA for direct reply to you. Please advise my private office if you do not receive a reply within ten working days.

Bus Services

Ceisteanna (372)

Tom Brabazon

Ceist:

372. Deputy Tom Brabazon asked the Minister for Transport if he is aware of the absence of a direct public bus service to Dublin Airport for residents of Fairview, Clontarf, Marino, Raheny and the surrounding north Dublin coastal areas; his views that many residents currently must travel into Dublin city centre to get a bus service or rely on costly taxi services in order to access the airport; if the National Transport Authority has assessed the transport needs of these communities in this regard; whether consideration has been given to introducing a direct airport bus service serving these areas; and if he will make a statement on the matter. [27928/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for policy and overall funding in relation to public transport; however, I am not involved in the day-to-day operations of public transport. The National Transport Authority (NTA) has statutory responsibility for securing the provision of public passenger transport services nationally and for the scheduling and timetabling of these services in conjunction with the relevant transport operators.

In light of the NTA’s responsibility in this area, I have forwarded the Deputy's question to the NTA for direct reply. Please advise my private office if you do not receive a response within ten working days.

A referred reply was forwarded to the Deputy under Standing Orders.

Driver Test

Ceisteanna (373)

Pearse Doherty

Ceist:

373. Deputy Pearse Doherty asked the Minister for Transport the current wait times for driving tests in Donegal, by test centre; if any plans are in place to bring the length of waiting times down; and if any consideration has been given to native Irish speakers in Gaeltacht areas who need a car for work but are being forced to move out of the area due to the long wait times and lack of public transport, in tabular form; and if he will make a statement on the matter. [27930/26]

Amharc ar fhreagra

Freagraí scríofa

Under the Road Safety Authority Act 2006, the Road Safety Authority (RSA) has statutory responsibility for the National Driver Testing Service. Given the RSA's responsibility in this matter, I have referred the Deputy's questions to the RSA for direct response. Please contact my office if a reply is not received within ten days. The Deputy may also wish to note that the statistics for waiting times for individual test centres are made available on the CSO website on a monthly basis and can be accessed via the following link: https://data.cso.ie/table/ROA36.

Pending this response, the latest information provided to me by the RSA indicates that as at 4 April the national average waiting time for a driving test is 11.9 weeks with the Donegal driver test centres as follows - Buncrana at 11-weeks, Donegal at 13-weeks, and Letterkenny at 13-weeks. The Deputy may wish to note that this marks a significant improvement on the waiting times of a year ago. I am informed by the RSA that it is continuing its work to reduce waiting times to meet the 10 week target.

The long-term solution to driver test waiting times lies in the recruitment of additional driver testers. In September 2024, my Department conveyed sanction for 70 additional driver testing posts on a permanent basis, bringing the permanent sanction for driver testers to 200. This represents a doubling of permanent posts since June 2022. As of 4 April, 193 testers were in place, which marks a significant increase on the 151 available at the beginning of 2025. The RSA is working to reach its full sanctioned complement of 200 testers later this year subject to training and onboarding of new recruits.

The Deputy might wish to note that the driver testing booking system now makes available cancelled test slots for candidates to take up at short notice. I would encourage learner drivers awaiting a test to monitor this channel, which may provide an opportunity to book an earlier testing date.

It should be noted that the service continues to see increased demand, with 20% more applications for a driving test received at end March when compared to the same period last year. I am told that a contributing factor to this higher demand is the tightening of restrictions on multiple learner permits, as drivers seek tests before the new regulations come into effect from 1 November this year.

As the Deputy will be aware, from a road safety perspective, it is vital that drivers complete the learning to drive process and become fully qualified, safety aware drivers, and that drivers do not hold learner permits without ever taking a driving test.

A referred reply was forwarded to the Deputy under Standing Orders.

Road Traffic Accidents

Ceisteanna (374, 375)

Barry Ward

Ceist:

374. Deputy Barry Ward asked the Minister for Transport the position regarding the criteria for designating a road traffic accident black spot; and if he will make a statement on the matter. [27931/26]

Amharc ar fhreagra

Barry Ward

Ceist:

375. Deputy Barry Ward asked the Minister for Transport the position regarding the national list of road traffic accident black spots, by local authority area; and if he will make a statement on the matter. [27932/26]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 374 and 375 together.

In accordance with the provisions of Section 13 of the Roads Act 1993, each local authority has statutory responsibility for the improvement and maintenance of their regional and local roads. Works on those roads are funded from local authorities' own resources and are supplemented by State grants.

My Department funds Network Safety Analysis of the Regional and Local Road Network across the country. Using available collision datasets high collision locations are identified and Locations of Interest (LoIs) reports are produced.

These LoI reports are then issued to the relevant local authority and form the basis for application for funding under the Safety Improvement Schemes Grant. In 2026 my Department allocated €14 million in Safety Improvement Schemes Grant to the sector which is funding over 330 low cost safety schemes nationally which is an 8% increase over the 2025 allocation.

As Minister for Transport, I have responsibility for overall policy and exchequer funding in relation to the National Roads Programme. Under the Roads Acts 1993-2015 and in line with the National Development Plan (NDP), the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals. In this context, TII is best placed to advise you in relation to road traffic accident black spots on National Roads.

Noting the above position, I have referred your question to TII for a direct reply. Please advise my private office if you do not receive a reply within 10 working days.

A referred reply was forwarded to the Deputy under Standing Orders.
Question No. 375 answered with Question No. 374.

Dublin Airport Authority

Ceisteanna (376, 377, 378, 379, 380, 381)

Barry Ward

Ceist:

376. Deputy Barry Ward asked the Minister for Transport his views on whether there is sufficient provision for passengers with mobility issues travelling via Dublin Airport; and if he will make a statement on the matter. [27933/26]

Amharc ar fhreagra

Barry Ward

Ceist:

377. Deputy Barry Ward asked the Minister for Transport his views on whether there is sufficient provision for passengers with mobility issues travelling via Shannon Airport; and if he will make a statement on the matter. [27934/26]

Amharc ar fhreagra

Barry Ward

Ceist:

378. Deputy Barry Ward asked the Minister for Transport his views on whether there is sufficient provision for passengers with mobility issues travelling via Cork Airport; and if he will make a statement on the matter. [27935/26]

Amharc ar fhreagra

Barry Ward

Ceist:

379. Deputy Barry Ward asked the Minister for Transport the position regarding the staff in Dublin Airport t tasked with supporting passengers that have mobility issues; if it is required that these staff have full access on both land and air side of the airport; and if he will make a statement on the matter. [27936/26]

Amharc ar fhreagra

Barry Ward

Ceist:

380. Deputy Barry Ward asked the Minister for Transport the position regarding the staff in Shannon Airport that are tasked with supporting passengers that have mobility issues; if it is required that these staff have full access on both land and air side of the airport; and if he will make a statement on the matter. [27937/26]

Amharc ar fhreagra

Barry Ward

Ceist:

381. Deputy Barry Ward asked the Minister for Transport the position regarding the staff in Cork Airport that are tasked with supporting passengers that have mobility issues; if it is required that these staff have full access on both land and air side of the airport; and if he will make a statement on the matter. [27938/26]

Amharc ar fhreagra

Freagraí scríofa

I propose to take Questions Nos. 376, 377, 378, 379, 380 and 381 together.

Airport managing bodies are responsible for providing free assistance to persons with reduced mobility (PRMs) under Regulation (EC) 1107 of 2006 on the rights of disabled persons and persons with reduced mobility when travelling by air.

This includes assistance to enable PRMs to proceed from designated arrival points through registration, security and border control, to board and disembark aircraft, retrieve baggage, and proceed to designated exit points within the airport terminal.

The Irish Aviation Authority is the competent authority with responsibility for monitoring and enforcing airport compliance with the Regulation and investigating complaints where passengers believe their rights have not been upheld.

The Irish Aviation Authority (IAA) carries out annual inspections on the 6 commercial airports in Ireland as part of the IAA’s remit under Regulation (EC) 1107/2006.The inspection reports are published on the IAA website and can be viewed on their website (www.iaa.ie) with the 2025 reports due to be published shortly.

The issues raised by Deputy as regards provision for disabled persons and PRMs are operational matters for Dublin, Cork and Shannon airports. I have referred the Deputy's question to them for direct reply. Please advise my private office if you do not receive a reply within ten working days.

Question No. 377 answered with Question No. 376.
Question No. 378 answered with Question No. 376.
Question No. 379 answered with Question No. 376.
Question No. 380 answered with Question No. 376.
Question No. 381 answered with Question No. 376.

Road Projects

Ceisteanna (382)

Paula Butterly

Ceist:

382. Deputy Paula Butterly asked the Minister for Transport the methods used by his Department in allocating funding for national, regional and local roads; whether allocations are based on population, geographic size, road network length or other criteria; and the way in which his Department adjudicates and determines the level of funding provided to each county. [27963/26]

Amharc ar fhreagra

Freagraí scríofa

As Minister for Transport, I have responsibility for the overall policy and exchequer funding in relation to our National Roads Programme. Under the Roads Acts 1993 to 2015, and in line with our National Development Plan, the operation and management of individual national roads is a matter for Transport Infrastructure Ireland (TII), in conjunction with the local authorities concerned. This is also subject to the Infrastructure Guidelines and the necessary statutory approvals.

Information on the 2026 grant allocations to local authorities for national roads can be found at this link: www.tii.ie/media/luma0wdk/2026-tii-la-national-roads-allocations-booklet.pdf.

As regards the methodology applied by TII on grant allocations, I have referred your question to them for a direct reply. Please advise my private office if you do not receive a response within 10 working days.

My Department's grant funding for the maintenance of regional and local roads is allocated on as fair and equitable a basis as possible to eligible local authorities. In the main protection and renewal grant categories, allocations are based on the length of the road network within a local authority's area of responsibility, with some account taken of the level of traffic. It is envisaged that grants will continue to be allocated on this basis.

For regional and local roads, any improvement projects proposed by local authorities for consideration for funding, under the Specific or Strategic Grant Programmes, are assessed by the Department on a case-by-case basis. All such projects put forward by local authorities for consideration must comply with the requirements of the Infrastructure Guidelines and the Department's Transport Appraisal Framework. Given the limited funding available for improvements, it is important for local authorities to prioritise projects within their overall area of responsibility, with the above-mentioned requirements in mind.

It should be noted that grant funding for regional and local roads is intended as a supplement to the realistic contributions from local authorities’ own resources.

A referred reply was forwarded to the Deputy under Standing Orders.
Roinn