Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Planning Issues

Dáil Éireann Debate, Thursday - 23 April 2026

Thursday, 23 April 2026

Ceisteanna (93)

Paula Butterly

Ceist:

93. Deputy Paula Butterly asked the Minister for Education and Youth if there are any plans, proposals, or considerations to establish an Educate Together primary school in Dundalk, County Louth, given the growing parental demand for multi-denominational education in the region (details supplied); and if she will make a statement on the matter. [28230/26]

Amharc ar fhreagra

Freagraí scríofa

I wish to advise the Deputy that requirement for school places is kept under on-going review in the context of available information on population, enrolments and residential development activity.

In order to plan for school provision and analyse the relevant demographic data, my department divides the country into 314 school planning areas and uses a geographical information system, using data from a range of sources, including CSO census data, child benefit and school enrolment data, to identify where the pressure for school places across the country will arise and where additional school accommodation is needed at primary and post-primary level.

Major new residential developments have the potential to alter the demand for school places at a local level. In that regard, as part of the demographic demand analysis, my department monitors planning and construction activity in the residential sector. This involves the analysis of data sources from local authorities and the CSO along with the engagement with local authorities and the construction sector. In this way, up-to-date information on significant new residential developments is obtained and factored into the demographic analysis exercise. This is necessary to ensure that schools infrastructure planning is keeping pace with demographic changes, at a local level, where there is a constantly evolving picture with planned new residential development.

Where demographic data indicates that additional provision is required, the delivery of such additional provision is dependent on the circumstances of each case and may, be provided through:

• Utilising existing unused capacity within a school or schools,

• Extending the capacity of a school or schools,

• Provision of a new school or schools.

If additional accommodation is required, the aim to try and facilitate this, as much as possible, by way of expansion of existing schools rather than establishing new schools. The expansion of existing schools is consistent with wider Government objectives under Project Ireland 2040 for an increased emphasis on compact growth. In respect of post primary schools, new post primary schools must have a student enrolment capacity of 600-1,000 students and must be co-educational. A lower threshold of 400 students may apply to gaelcholáistí, having regard to the alternative of establishing an Irish-medium unit (aonad) in an English-medium school.

New schools are only established in areas of demographic growth as the resources available for school infrastructure have to be prioritised to meet the needs of areas of significant population increase so as to ensure that every child has a school place.

The Programme for Government commits to seeking to increase choice for parents by ensuring that families can access both multi/non-denominational and faith-based education.

The schools reconguration process, supporting transfers of schools to multi-denominational patrons in response to the wishes of local communities, has been developed in order to meet demand from parents and to accelerate the delivery of multi-denominational schools.

When a school transfers from the patronage of one patron to another, the school remains open with the same roll number, operating from the same school property and with the same school staff and pupils.

Further information for school communities regarding transfers of patronage can be found on the schools reconfiguration page at the following link: www.gov.ie/schoolsreconfiguration

On 4 November 2025, my department published a 'Framework and action plan for delivery of increased choice for parents on education provision at primary level'. The main focus of this framework and action plan was an online, school-specific survey. The survey ran from 4 November to 16 December 2025.

Through the survey, my department is obtaining clear information on the preferences of parents and guardians about the primary schools which their children currently attend, or will attend in coming years, on a number of important areas of primary school provision, including patronage/ethos, co-education or single-sex school provision and language of instruction (English or Irish).

The results of the survey will help my department to plan how education at primary level is provided.

I recently announced the high-level national and county summary results in respect of the preferences of parents with children currently in primary school. My department is continuing its detailed analysis of the survey data and is preparing finalised school-specific reports. These school reports will also include the preferences of parents and guardians of children who are not yet in primary school and will be issued to all primary schools in May.

Demand for change, or continuity, will vary from school to school. A good response rate at individual school level will also be relevant in assessing the parental preferences.

Roinn