Léim ar aghaidh chuig an bpríomhábhar
Gnáthamharc

Heritage Projects

Dáil Éireann Debate, Tuesday - 19 May 2026

Tuesday, 19 May 2026

Ceisteanna (637)

Albert Dolan

Ceist:

637. Deputy Albert Dolan asked the Minister for Housing, Local Government and Heritage the current and planned development works at the Martello Tower at Meelick, County Galway; the proposals to extend the existing public walkway to provide safe and direct access to the Martello Tower; the plans to provide an accessible viewing point of the River Shannon from the top of the tower; the current status of design drawings or feasibility studies for these works; the anticipated timelines for delivery of these projects; and if he will make a statement on the matter. [37637/26]

Amharc ar fhreagra

Freagraí scríofa

Waterways Ireland is a North South Implementation Body established under the British Irish Agreement of 10 April 1998. It is funded by my Department and the Department for Infrastructure in Northern Ireland.

The detailed information requested in relation the development works planned by Waterways Ireland at the Martello Tower at Meelick is not held in my Department. Arrangements have been put in place by all bodies under the aegis of my Department to facilitate the provision of information directly to members of the Oireachtas. This provides a speedy, efficient and cost effective system to address queries directly to the relevant bodies. The contact email address for Waterways Ireland is oireachtas@waterwaysireland.org.

Question No. 638 answered with Question No. 183.
Roinn