Ceisteanna (174)

Martin Browne

Ceist:

174. Deputy Martin Browne asked the Minister for Education the measures being taken to address the capacity constraints at a school in Cashel (details supplied); when the Department intends to assist in providing additional premises on land owned by the school; if the Department will commit to ensuring the portacabins being used at the school are replaced through the establishment of permanent structures as previously discussed; and if she will make a statement on the matter. [43685/24]

Amharc ar fhreagra

Freagraí scríofa

I can confirm to the Deputy, that the school in question has submitted an application for capital funding, under my Department's Additional School Accommodation (ASA) Scheme.

Enabling children with special educational needs to receive an education is a priority for this government. It is also a key priority for my department and for the National Council for Special Education (NCSE).

The vast majority of children with special educational needs are supported to attend mainstream classes with their peers. Where children with more complex needs require additional supports, special classes and special school places are provided.

For 2024, €2.7 billion is being spent on special education, an increase of €113 million, and this is dedicated to providing supports for children with special educational needs. This will allow for, amongst other things, the opening of up to 400 new special classes in mainstream schools and 300 additional special school places.

This level of educational funding and support is unprecedented and represents in excess of 27% of the Department of Education’s total allocation for 2023.

The National Council for Special Education (NCSE) has responsibility for coordinating and advising on the education provision for children nationwide. The Department and the NCSE are working closely on a more streamlined and joined up planning process to ensure a targeted approach to meet demand for special needs placements ahead of each new school-year and is committed to delivering an inclusive educational environment for all pupils. The Department and the NCSE continue to work closely in planning for the delivery of new places required to meet forecasted demand. The forward planning for special education includes a new circular letter 0080/2024 setting out new measures to support the forward planning of special education provision. This was issued in early October by the Department to all schools, following intensive stakeholder engagement.

Under Project Ireland 2040, the education sector will receive a total of approximately €4.4 billion capital investment over the period 2021-2025. This significant investment allows us to move forward with certainty on our ambitious plans and deliver high quality building projects, with a real focus on sustainability, for school communities across Ireland. This investment will build on the good progress being made on adding capacity to cater for demographic changes and provision for children with special educational needs. This investment will also facilitate an increased focus on the modernisation of existing school stock and help transition the school system for an era of net zero carbon by 2050.

Since 2020 over 50 school building projects have been completed in special schools delivering over circa. 220 new classrooms and over 760 new classrooms for SEN provision have been built in mainstream schools.

I can confirm to the Deputy that the Department is currently assessing options with a view to identifying the optimum solution for the long-term accommodation needs of the school. In this regard the Department approved the provision of modular accommodation of 4 classrooms for Scoil Aonghusa to cater for immediate needs. This project has since been completed.

My officials are also currently engaging with the school as part of the assessment process for the school’s longer-term accommodation needs with a view to making the most appropriate provision possible for the school and for its current and future students.

Special Educational Needs

Ceisteanna (175)

Martin Browne

Ceist:

175. Deputy Martin Browne asked the Minister for Education to outline the manner in which the Department ascertains secondary special school places needed through the demand experienced in primary level; the level to which that need is being met; and if she will make a statement on the matter. [43686/24]

Amharc ar fhreagra

Freagraí scríofa

Enabling children with special educational needs to receive an education is a priority for this government. It is also a key priority for me as Minister for Special Education & Inclusion, for my department and for the National Council for Special Education (NCSE).

The vast majority of children with special educational needs are supported to attend mainstream classes with their peers. Where children with more complex needs require additional supports, special classes and special school places are provided.

The NCSE has responsibility for coordinating and advising on the education provision for children with special educational needs nationwide. The NCSE have recruited additional special education needs organisers (SENOs), advisors and team managers. The total number of SENOs has increased from 65 to 120. SENOs play an important role in ensuring there is adequate special educational provision within local areas. These SENOs are currently visiting schools to conduct planning meetings. The NCSE plan to conduct up to 800 of these visits by the end of this month.

Parents seeking special class placements for their children are advised to contact the NCSE locally so that their needs can be taken into account for planning purposes. Local SENOs are available to assist and advise parents on their options and the supports available.

I would like to outline the progress my department and the NCSE are making to ensure there is adequate special educational placements and support services for children with complex needs.

Almost 1,700 classes have been sanctioned by the NCSE in the last 5 years, and in this time 11 new special schools have also been established and many more expanded. For this school year alone over 400 new special classes have been sanctioned bringing the total number of special classes nationwide to 3,336.

Budget 2025 provides funding for another 400 special classes and 300 special school places nationwide and it is estimated that a similar level of provision will be needed each year for the next 3 years. Particularly, demand for new special classes at post-primary level is expected to increase significantly over the next few years. This is due to increasing demographics and increasing prevalence rates. My department and the NCSE have engaged with post-primary stakeholders in this regard.

In October 2022, my department wrote to all post-primary schools requesting that each school begin planning to provide for up to four special classes to meet the needs of children progressing from primary school. Just this month my department issued a circular to all schools setting out new measures to support the forward planning of special education provision. Included in this circular was a reminder of the need for post primary schools to continue planning for this level of provision.

My department and the NCSE are engaging with schools and school management bodies in relation to the provision of future special classes and are committed to ensuring that sufficient special education placements will be available for children for this school year and future years.

Question No. 176 answered with Question No. 173.
Question No. 177 answered with Question No. 173.
Question No. 178 answered with Question No. 173.
Question No. 179 answered with Question No. 173.
Question No. 180 answered with Question No. 173.

School Staff

Ceisteanna (181)

John McGuinness

Ceist:

181. Deputy John McGuinness asked the Minister for Education if an increase in the hourly rate being paid to school bus escorts has been sanctioned; and if so, when will the increase be applied and when arrears will be paid; and if she will make a statement on the matter. [43710/24]

Amharc ar fhreagra

Freagraí scríofa

The School Transport Scheme is a significant operation managed by Bus Éireann on behalf of the Department of Education. In the 2023/24 school year over 163,800 children, including over 136,000 pupils travelling on primary and post primary services, 20,200 pupils with special educational needs, and 7,400 pupils who have arrived to Ireland from Ukraine were transported on a daily basis to primary and post-primary schools throughout the country.

The total cost of the scheme in 2023 was €382.02m.

Over 140,000 mainstream tickets have issued for the 2024/2025 school year, which is already 3% more than the total tickets issued for the full 2023/2024 school year.

There is a facility within the Special Educational Needs Transport Scheme for the appointment of a School Transport Escort where a child’s care and safety needs while on school transport are such as to require the support of a School Transport Escort.

The Department of Education provides grant funding for the employment of the School Transport Escort and sets the rate of pay. The Board of Management/ETB are responsible for the employment of the School Transport Escort.

It is recognised that School Bus Escorts play a vital role in supporting children with Special Educational Needs in their journey to and from school.

A review of the School Transport Scheme has been completed. This review was conducted with a view to examining the current scheme, its broader effectiveness, and sustainability and to ensure it services students and their families adequately. As a recommended action arising from the review, the Department committed to carrying out a comprehensive analysis of matters as they relate to the escort's pay, and the information provided to schools as the employer of the escort.

An information pack for schools was recently completed and has now issued to schools. The pay rate for School Bus Escorts is currently being reviewed. The pay rate for School Bus Escorts is currently being reviewed and communication will issue to schools shortly. It is planned that this action will be completed before the end of Q4 2024.

Departmental Budgets

Ceisteanna (182)

Gary Gannon

Ceist:

182. Deputy Gary Gannon asked the Minister for Education following the recent announcement regarding the additional €1 billion in funding for education, to provide clarity on the way in which this funding will be allocated; the specific changes that will be made to the education budget; to provide a detailed breakdown regarding the areas this extra funding will cover; and if she will make a statement on the matter. [43718/24]

Amharc ar fhreagra

Freagraí scríofa

I can confirm to the Deputy that Budget 2025 provides an increase of €712 million in core current funding to my Department's Vote, as well as over €360 million in core capital funding. An additional €120 million is also being provided as part of Cost of Living supports and €140 million in Ukraine related supports. These additional funds build on significant increases in recent budgets and further enhance the investment in Ireland’s primary and post-primary education system. The significant increased investment is the largest Education budget in the history of the state and reflects the government’s commitment to a quality inclusive school system and improved learning outcomes for every student.

The key features of Budget 2025 include:

• Some €51 million funding to extend the free schoolbooks scheme to students in transition and senior cycle years, meaning it will now support 940,000 pupils and students in primary, special and post-primary schools in the free scheme.

• Significant increase in school funding with state funding per pupil – known as the capitation rate – increasing from €200 to €224 per student in primary schools and from €345 to €386 per student in post-primary schools. This 12 per cent increase to assist schools with increased day-to-day running costs will cost €30 million.

• An additional €45 million in cost of living supports for all primary, special and post-primary schools in the free scheme to help them deal with increased costs.

• An additional 768 special education teachers and 1,600 special needs assistants (SNAs) to support children across mainstream, special classes and special schools. This is the highest ever number of SNAs allocated and so in 2025 we will have over 23,000 in our education system. This is in recognition of the growing needs of children across all settings. In total there will be over 44,000 dedicated staff to support children with special educational needs in our schools.

• A new well-being initiative designed to support schools to implement bans on the use of mobile phones by post-primary school students during the school day.

• A package of measures to ensure that our schools continue to have a supply of excellent teachers, including a bursary for student teachers to increase the number of qualified Science, Technology, Engineering and Maths teachers in post-primary schools, and continued funding for free upskilling courses for teachers in high-demand subject areas.

• Additional funding to tackle educational disadvantage, with more educational supports available for children in alternative school settings and the roll-out of the Traveller and Roma Education Strategy.

• Over €50 million in additional funding for the School Transport Scheme to provide more places for children with special educational needs and to cover bus contractor costs.

• Reduced school transport scheme fees are being kept in place for families next year. They will remain at €50 for primary students, €75 for post-primary students and €125 for a family ticket.

• Funding for the roll out of school transport pilot projects and to increase the Special Transport grant rate.

• An additional 1,000 school posts of responsibility allocated to assist the leadership and management in schools commencing in the 2025/26 school year.

• Increased funding will be provided for Senior Cycle Redevelopment and the new Primary Curriculum.

• Junior Cycle and Leaving Certificate students will be exempted again from the usual exam fees of over €100 next summer.

• The capital budget will increase by over €360 million compared to the original NDP allocation for 2024 to €1.3 billion in 2025. This will support around 350 building projects that are currently at construction and over 200 other projects proceeding to construction during 2025 and early 2026. Under Project Ireland 2040 some €6 billion will be invested in the education sector over the period 2021-2025.

• Funding for the expansion of the Active School Flag programme in primary schools to increase the number of flags awarded and progress from pilot phase to a full roll-out of the post-primary programme.

Pupil-Teacher Ratio

Ceisteanna (183)

Cathal Crowe

Ceist:

183. Deputy Cathal Crowe asked the Minister for Education the average class size at primary level in each school year since 2015-2016, in tabular form; and if she will make a statement on the matter. [43719/24]

Amharc ar fhreagra

Freagraí scríofa

Please find attached requested information for the years 2015–2023 inclusive, 2023 being the latest year we have available class size data.

The figures are based on mainstream classes in mainstream schools and were collated from the relevant Class Size tables. The tables are published on the Departments of Education's website and can be found at the link below;

gov.ie - Class Size Information at Individual Primary School Level (www.gov.ie)

Academic Year (Enrolment)

Average Class Size

2015

24.9

2016

24.6

2017

24.5

2018

24.3

2019

24.1

2020

23.3

2021

22.8

2022

22.8

2023

22.5

Special Educational Needs

Ceisteanna (184)

Cathal Crowe

Ceist:

184. Deputy Cathal Crowe asked the Minister for Education the number of special needs assistants in primary schools in each school year since 2015-2016, in tabular form; and if she will make a statement on the matter. [43720/24]

Amharc ar fhreagra

Freagraí scríofa

Enabling children with special educational needs to receive an education is a priority for this government. It is also a key priority for me as Minister for Special Education & Inclusion, for my department and for the National Council for Special Education (NCSE).

The vast majority of children with special educational needs are supported to attend mainstream classes with their peers. Where children with more complex needs require additional supports, special classes and special school places are provided.

The NCSE has the responsibility for planning and coordinating school supports for children with special educational needs including the allocation of special needs assistants (SNA). Allocations are provided to schools on the basis of the school's overall profile of need. As a result, the number of students supported by SNAs varies from school to school.

As of the end of June 2024 there were over 21,000 SNAs allocated to schools nationwide.

The NCSE have provided details of the number of SNAs posts allocated to primary schools since 2015 (mainstream and special classes) and these are set out in the table below. The remaining allocations are to post-primary schools and special schools.

End of Year

Whole Time Equivalent SNA posts

22/10/2024

14,069 – Current figure

2023

13,137

2022

12,181

2021

11,422

2020

10,796

2019

10,018

2018

9,342

2017

8,624

2016

7,871

2015

7,846

School Staff

Ceisteanna (185)

Cathal Crowe

Ceist:

185. Deputy Cathal Crowe asked the Minister for Education the number of approved teacher posts in primary schools in each school year since 2015-2016, in tabular form; and if she will make a statement on the matter. [43721/24]

Amharc ar fhreagra

Freagraí scríofa

Just over 43,000 teachers have been allocated in respect of the current school year 2024/25, for which the allocation process has not completed yet.

In previous budgets, I have prioritised reducing the pupil teacher ratios in primary schools which has brought the teacher allocation ratio to an average of 1 classroom teacher for every 23 pupils in all primary schools, the lowest level ever seen at primary level. A three point reduction in the retention schedule, which I introduced in 2021, assists schools that would otherwise be at risk of losing teaching posts. I also improved teacher allocations for DEIS Urban Band 1 schools which now stand at an average of 17:1, 21:1 and 19:1 for junior, senior and vertical schools respectively.

The 2023/24 educational statistical report shows that the average pupil teacher ratio at primary level last year was 12.8:1, while the average class size was 22.5. These ratios, brought about by recent budget improvements, are the lowest averages across the last 20 years.

www.gov.ie/en/publication/055810-education-statistics/#latest-statistical-reports

Indicator Description

Unit of Measure

Level

2015

2016

2017

2018

2019

2020

2021

2022

2023

Number of primary Teachers

Number

Primary

34,576

35,669

36,773

37,341

37,839

38,604

40,351

41,623

42,680

of which mainstream teaching teachers

Number

Primary

21,724

22,152

22,430

22,747

22,970

23,460

23,572

23,596

23,818

of which other teachers

Number

Primary

12,852

13,517

14,343

14,594

14,869

15,144

16,779

18,027

18,862

Schools Building Projects

Ceisteanna (186)

Paul Kehoe

Ceist:

186. Deputy Paul Kehoe asked the Minister for Education for an update on a building project (details supplied); and if she will make a statement on the matter. [43723/24]

Amharc ar fhreagra

Freagraí scríofa

The school referred to by the Deputy was approved to enter the Department’s pipeline of school buildings for a project to provide 2 Mainstream classroom, 1 Technology room and a Preparation Area, 1 Science Laboratory and Preparation area, 1 Art room and Project Store and a 2 Classroom Special Education Needs Base under the Additional School Accommodation Scheme.

A Stage 1 Design Report for the project was received by my department in August 2024 and is being reviewed from both a technical and cost perspective in accordance with the requirements of the public Infrastructure Guidelines. All projects, including this one, undergo the necessary due diligence outlined in the public Infrastructure Guidelines. Once this review has been completed the Department will contact the school authorities with the outcome for the progression of this much needed project.

Schools Building Projects

Ceisteanna (187)

Gino Kenny

Ceist:

187. Deputy Gino Kenny asked the Minister for Education in terms of the ongoing delays with the promised new buildings at schools (details supplied), when she hopes that the construction of the new schools will commence; and if she will make a statement on the matter. [43748/24]

Amharc ar fhreagra

Freagraí scríofa

The joint major building project for the schools referred to by the Deputy is currently at the initial stage of Architectural Planning, Stage 1 – Preliminary Design, where the Design Team assess the site and current school buildings and prepare their initial sketch schemes. A preferred design option, including the scope and extent of works to be carried out, will be established during this early stage.

Following the Stage 1 Stakeholders meeting, the Stage 1 Addendum report was received from the Design Team, and is currently under review.

Upon completion of the Departments due diligence review, the school authorities and its design team will be advised of the further progression of the project.

Schools Building Projects

Ceisteanna (188)

Gino Kenny

Ceist:

188. Deputy Gino Kenny asked the Minister for Education her Department’s plans with lands owned by the State that are adjacent to a school (details supplied); and if she will make a statement on the matter. [43749/24]

Amharc ar fhreagra

Freagraí scríofa

The Department of Education is in discussions with a developer on a potential disposal of the lands to the rear of the school referred to by the Deputy for the development of a public park and housing. These discussions to date have allowed for lands to be retained for the benefit of the aforementioned school.

The sustainable development plan of a settlement area and the planned use of the available development land is set out in County and Local Area Development Plans.

The land to the South of the school is zoned to provide for new residential communities in the South Dublin County Development Plan 2022-2028. There is also a Specific Local Objective (SLO) on these lands to identify and set aside land for a Public Park.

The future demand for school places in an area is directly linked to the number of existing and planned residential units. This department works closely with Local Authorities to ensure sufficient lands are zoned for educational use to meet the projected demand. To that end, a specific objective to provide school facilities has been provided on lands within the Newcastle development area in the South Dublin County Development Plan 2022-2028. These lands are adjacent to a large public park and public play facilities.

Any agreement to transfer lands for the development of housing and public park will include providing access to these specific lands for the development of the required school facilities.

The current negotiations include the transfer of land in the Newcastle area to the department for educational use. The purpose of these negotiations is to facilitate the development of Newcastle in a sustainable manner in keeping with the existing County & Local Development Plans.

Schools Building Projects

Ceisteanna (189)

Cathal Crowe

Ceist:

189. Deputy Cathal Crowe asked the Minister for Education the total capital funding provided for new school buildings and the refurbishment of existing school buildings in each school year since 2015/16, in tabular form; the number of projects completed in each year; and if she will make a statement on the matter. [43750/24]

Amharc ar fhreagra

Freagraí scríofa

Since 2020, my Department has invested over €5 billion in our schools throughout the country, involving the completion of over 950 school building projects and with construction currently underway at approximately 350 other projects, which includes 37 new school buildings. These 350 projects currently at construction involve a total State investment of over €1.5bn.

The department announced earlier this year that close to 90 projects, including 28 new school buildings, would be authorised to proceed from tender stage to construction over the course of 2024 and early 2025. In total, around €800 million will be invested in these projects under the department’s Large Scale Capital Programme and Additional Accommodation Scheme for essential classroom accommodation.

Between projects currently under construction and projects moving to construction in this latest phase, investments by the Department of Education are adding over 550,000 square metres of new and modernised capacity to our school estate.?

This is a record level of investment in school buildings. It will expand the number of school places, significantly increase provision for special education and upgrade and modernise our school infrastructure.? The impact of this will be felt in communities right around the country.

The key drivers of capital investment in the schools sector include:

• demographic growth, particularly at post primary level

• increased demand for special educational needs provision

• alignment of school place provision with new housing development

• climate action objectives including deep energy retrofit.

The table below details capital expenditure across the Department from 2015 to date in 2024.

Capital Expenditure (€m)

2024 to Date

2023

2022

2021

2020

2019

2018

2017

2016

2015

990.57m

1263.52m

1119.95m

989.21m

924.01m

796.58m

645.86m

611.7m

609.65m

525.76m

School Accommodation

Ceisteanna (190)

Pádraig O'Sullivan

Ceist:

190. Deputy Pádraig O'Sullivan asked the Minister for Education how a school (details supplied) can submit an application for an SEN room; and if she will make a statement on the matter. [43798/24]

Amharc ar fhreagra

Freagraí scríofa

As you are aware enabling children with special educational needs to receive an education is a priority for this government. It is also a key priority for my department and for the National Council for Special Education (NCSE).

The vast majority of children with special educational needs are supported to attend mainstream classes with their peers. Where children with more complex needs require additional supports, special classes and special school places are provided.

I appreciate and commend the efforts taken by boards of management in expressing their interest to open a special class. The NCSE has the responsibility for planning and coordinating school supports for children with special educational needs and can be contacted directly in this regard. They actively encourage expressions of interest from schools to open special classes.

When assessing the needs in the local area, the NCSE identify schools in the neighbouring vicinity with available special class vacancies and assess their capability with consideration to demographical and statistical data. My department will ask the NCSE to engage directly with the school referred to by the Deputy to provide advice on this matter.

The NCSE have recruited additional special education needs organisers (SENOs), advisors and team managers. SENOs play an important role in ensuring there is adequate special educational provision within local areas. The total number of SENOs has increased from 65 to 120. These SENOs are currently visiting schools to conduct planning meetings. The NCSE plan to conduct up to 800 of these visits by the end of this month.

Over 1,700 classes have been sanctioned by the NCSE in recent years, in this time 11 new special schools have also been established and many more expanded. For this school year alone over 400 new special classes have been sanctioned bringing the total number of special classes nationwide to 3,336. Of these, 563 are in County Cork and 66 are new for the 2024/25 school year, 43 at primary level and 23 at post primary level. Budget 2025 provides funding for another 400 special classes and 300 special school places nationwide and it is estimated that a similar level of provision will be needed each year for the next 3 years.

My department will continue to support the NCSE and schools through the provision of the necessary funding and capital investment to ensure all children are successful in accessing an education.

Teaching Qualifications

Ceisteanna (191)

Pádraig O'Sullivan

Ceist:

191. Deputy Pádraig O'Sullivan asked the Minister for Education the number of unregistered and unqualified teachers that are currently teaching in primary and secondary schools; and if she will make a statement on the matter. [43799/24]

Amharc ar fhreagra

Freagraí scríofa

Ensuring that every child's experience in school is positive and that they have qualified, engaged teachers available to support them in their learning is a priority area of action for the Government.

The recruitment and appointment of teachers to fill teaching posts is a matter for individual school authorities. There are more than 3,700 individual employers (boards of management of primary schools and post-primary schools, as well as ETBs) who recruit and appoint teachers subject to the relevant legislation

As many of the absences that arise in schools are filled locally by schools, without a requirement for an application to be made to my Department, my Department therefore cannot provide definitive figures as to the number of unfilled vacancies, or substitutable absences which were unfilled, in any given period of time, or as to the number of vacancies covered by an unregistered person during that time.

While most teaching positions are filled, some schools face significant recruitment challenges. To address teacher supply issues, the Department, with stakeholder support, has implemented several actions.

As of March 2024, a record 78,646 teachers are employed. From 2017/18 to 2023/24, the number of teaching posts in primary schools increased by 13.3% and 16.7% in post-primary schools. The reduced pupil-teacher ratio has resulted in more teaching positions being allocated relative to student enrolment.

Projections show that primary school enrolments will decline until 2036 while it is expected post-primary enrolments will peak in 2026/27 easing back to current levels by 2031/32. The Department is finalising an analysis of how this will impact the teaching workforce. The upcoming report, "Developing a Teacher Supply and Demand Model for Ireland," will detail these findings. Despite the projected enrolment decrease, it is not expected to resolve the recruitment challenges faced by some schools.

There are less than 1% resignations in the Primary sector every year and 1.6% in Post Primary. The number of teachers who retired over the past number of years has varied, with 932 in 2013 and 1,074 in 2023.

In circumstances where posts are unfilled for a period of time, or where a vacancy arises in a school due to a teacher taking leave, such vacancies may be filled by substitute teachers, on either a casual or non-casual contract basis.

Substitutable leave absences may be filled by schools in several ways. A substitute teacher may be recruited locally by a school, and a claim for payment for the teacher may be submitted to my Department, via the Online Claims System. Alternatively, the absence may be covered by schools under a number of schemes, which are managed locally by schools.

The Supervision and Substitution Scheme allows for the supervision of students in primary and post-primary schools during breaks and before and after school and allows for substitution to cover certain categories of teacher absences. Schools therefore provide cover for a number of substitutable absences, arising over the school year, through the Supervision and Substitution scheme.

For primary schools, substitute teacher supply panels are also in place. For the 2024/25 school year, 591 substitute teacher supply posts have been allocated to 167 panels, covering 2,900 schools. This scheme provides substitute cover for teachers employed in primary schools who are absent on short-term leave. Absences covered by the teacher supply panels are recorded locally by the schools and the schools are not required to claim for the substitutable leave to my Department.

For post-primary schools, Circular 0066/2024 provides for the continuation of the Teaching Hours Extension scheme to the 2024/25 school year. This scheme provides post-primary schools with an alternative means of sourcing appropriately qualified substitute teaching cover to support teaching and learning in schools. Teachers on full teaching contracts of 22 hours can provide additional substitution cover, of up to 35 additional hours, for each term designated under the scheme. Absences covered under this scheme are also recorded locally by the schools and the schools are not required to claim for the substitutable leaves covered by this scheme to my Department.

Recent Budgets contain a range of measures that demonstrate my commitment to continued investment in our education system.

• Budget 2025 included a bursary for student teachers to increase the number of qualified STEM (including science, maths, chemistry, physics, engineering) teachers in post-primary schools. The bursary, a €2k payment each year for the final two years of their undergraduate initial teacher education programme, is contingent on a commitment to complete a minimum 2 years post-qualification teaching service in a recognised post primary school.

• Budget 2024 also included the expansion of upskilling programmes, free to teachers, aimed at increasing the number of qualified teachers in high-demand subjects and reducing out-of-field teaching. Budget 2025 continued funding for free upskilling courses for teachers in high-demand subject areas (Irish, French, Spanish, maths, computer science, physics, politics & society).Trinity College Dublin will deliver the new Irish upskilling programme in post-primary.

• Budget 2024 introduced a new bursary-type, fee refund scheme for teachers graduating with a PME (professional master of education) in 2024. This €2,000 payment will be made in 2025 to eligible primary and post-primary teachers. The purpose of this scheme is to encourage newly qualified teachers who have completed a PME in 2024 to take up teaching roles.

These new measures are in addition to a range of targeted measures that I have introduced in recent times, including:

• at primary level, 610 additional places on initial teacher education programmes were approved.

• over 3,700 student teachers were registered under Route 5 with the Teaching Council to substitute in June 2024, up from 2,700 that were registered in the previous school year. Continuing these flexibilities allows student teachers to support schools during their placements or as substitutes.

• Restrictions on job-sharing teachers and those on a career break from working as substitutes have been reduced.

• encouraging retired teachers to work as substitute teachers; in the 2023/24 school year, over 1,700 retired teachers provided substitute cover, an increase of 12% on the previous year,and

• the Teaching Transforms campaign continues to promote the teaching profession and encourage students to follow a career in teaching.

Teaching remains an attractive career choice.

• Over 3,700 newly qualified teachers registered with the Teaching Council in 2024 with over 123,000 now on the register.

• Analysis of CAO applications spanning from 2017 to 2024 indicates a sustained and robust demand for undergraduate teaching programmes. On average, 6% of first preference applications during the period from 2017 to 2024 were for either primary or post-primary teaching programmes.

• The new pay deal will mean that teachers’ starting salary will increase to €46,000 rising to a maximum of €85,000 per year which compares well internationally.

The Department frequently consults stakeholders on issues such as teacher supply through industrial relations forums, sectoral meetings, and direct discussions with teacher unions. A new project, supported by UNESCO and the EU Directorate-General for Structural Reform Support, will begin on Friday 25 October, focusing on strategic workforce planning for teachers in Ireland.

School Staff

Ceisteanna (192)

Pádraig O'Sullivan

Ceist:

192. Deputy Pádraig O'Sullivan asked the Minister for Education the number of vacant posts in primary schools and secondary schools nationwide; and if she will make a statement on the matter. [43800/24]

Amharc ar fhreagra

Freagraí scríofa

Ensuring that every child's experience in school is positive and that they have qualified, engaged teachers available to support them in their learning is a priority area of action for the Government. The recruitment and appointment of teachers to fill teaching posts is a matter for individual school authorities, subject to procedures agreed under Section 24 of the Education Act 1998 (as amended by the Education (Amendment) Act 2012). In that regard, there are more than 3,700 individual employers (boards of management of primary schools and post-primary schools, as well as ETBs). My Department does not currently have data on the number of vacant posts at both primary and post-primary level as schools are continuing to recruit.

While most teaching positions are filled, some schools face significant recruitment challenges. To address teacher supply issues, the Department, with stakeholder support, has implemented several actions.

As of March 2024, a record 78,646 teachers are employed. Projections show that primary school enrolments will decline until 2036 while it is expected post-primary enrolments will peak in 2026/27 easing back to current levels by 2031/32. The Department is finalising an analysis of how this will impact the teaching workforce. The upcoming report, "Developing a Teacher Supply and Demand Model for Ireland," will detail these findings. Despite the projected enrolment decrease in primary, it is not expected to resolve the recruitment challenges faced by some schools.

There are less than 1% resignations in the Primary sector every year and 1.6% in Post Primary. The number of teachers who retired over the past number of years has varied, with 932 in 2013 and 1,074 in 2023.Measures introduced have led to

• an increase of 20% in Initial Teacher Education graduates (student teachers)between 2018 and 2023, and a 30% increase in the number registered with the Teaching Council since 2017, and

• a 16.7% increase in the number of teaching posts allocated to post-primary, and an increase of 13.3% allocated to primary between 2017/18 and 2023/24.

Recent Budget measures introduced reflect this Government’s commitment to ongoing investment in the education system to address teacher supply issues. Key initiatives include:

• Budget 2025 included a bursary for student teachers to increase the number of qualified STEM (including science, maths, chemistry, physics, engineering) teachers in post-primary schools. The bursary, a €2k payment each year for the final two years of their undergraduate initial teacher education programme, is contingent on a commitment to complete a minimum 2 years post-qualification teaching service in a recognised post primary school.

• Budget 2024 also included the expansion of upskilling programmes, free to teachers, aimed at increasing the number of qualified teachers in high-demand subjects and reducing out-of-field teaching. New programmes in Irish, French, politics & society, and computer science will complement existing programmes in maths, physics, and Spanish. Trinity College Dublin will deliver the new Irish upskilling programme for post-primary.

• Budget 2025 continued funding for free upskilling courses for teachers in high-demand subject areas (Irish, French, Spanish, maths, computer science, physics, politics & society).

• Budget 2024 introduced a €2,000 bursary-style fee refund for teachers graduating with a Professional Master of Education (PME) in 2024. This payment, to be made in 2025, aims to encourage newly qualified primary and post-primary teachers to take up teaching roles.

In addition to these recently introduced measures, as Minister I have developed further initiatives to address teacher supply challenges, including:

• at primary level, 610 additional places on initial teacher education programmes were approved,

• newly qualified teachers (NQTs) employed in primary schools can complete the Droichead process while employed on a Supply Panel or Principal Release Time Post,

• over 3,700 student teachers were registered under Route 5 with the Teaching Council to substitute in June 2024, up from 2,700 that were registered in the previous school year. Continuing these flexibilities allows student teachers to support schools during their placements or as substitutes.

• increasing the pool of teachers available to undertake substitute work, through the continued suspension of the usual limits on career break and job-sharing schemes and the continuation of the teaching hours’ extension scheme in post-primary schools to 2024/25 school year,

• encouraging retired teachers to work as substitute teachers; in the 2023/24 school year, over 1,700 retired teachers provided substitute cover, an increase of 12% on the previous year, and

• the Teaching Transforms campaign continues to promote the teaching profession and encourage students to follow a career in teaching. Promotion campaigns have been developed to coincide with the CAO closing date and change of mind deadline in recent years.

Teaching is an attractive career choice:

• Over 3,700 newly qualified teachers registered with the Teaching Council in 2024 with over 123,000 now on the register.

• Analysis of CAO applications spanning from 2017 to 2024 indicates a sustained and robust demand for undergraduate teaching programmes. On average, 6% of first preference applications during the period from 2017 to 2024 were for either primary or post-primary teaching programmes.

• The new pay deal will mean that teachers’ starting salary will increase to €46,000 rising to a maximum of €85,000 per year which compares well internationally.

The Department frequently consults stakeholders on issues such as teacher supply through industrial relations forums, sectoral meetings, and direct discussions with teacher unions. A new project, supported by UNESCO and the EU Directorate-General for Structural Reform Support, will begin on Friday 25 October, focusing on strategic workforce planning for teachers in Ireland.

Schools Building Projects

Ceisteanna (193)

Darren O'Rourke

Ceist:

193. Deputy Darren O'Rourke asked the Minister for Education for an update on building works at a school (details supplied). [43810/24]

Amharc ar fhreagra

Freagraí scríofa

The large scale capital project at the school referred to by the Deputy, for the construction of a new 16 classroom school, a general purpose hall and classrooms for children with special educational needs is at an advanced stage of Architectural Planning Stage 3 – Tender Action and Award.

The next steps for the project will be the issuing of a Letter Of Acceptance to the successful tenderer, the completion of the tender process and progression to Stage 4 – Construction. The project has an estimated contract duration of 20 months.