Darren O'Rourke
Ceist:194. Deputy Darren O'Rourke asked the Minister for Education for an update on building works at a school (details supplied). [43811/24]
Amharc ar fhreagraWritten Answers Nos. 194-228
194. Deputy Darren O'Rourke asked the Minister for Education for an update on building works at a school (details supplied). [43811/24]
Amharc ar fhreagraThe school to which the Deputy refers was approved to enter the department’s pipeline of school buildings for a project under the Additional School Accommodation (ASA) Scheme. The project will provide 2 mainstream classrooms, 2 classroom Special Education Needs base and 2 Special Education Tuition rooms. The project was devolved to the school authority for delivery.
Following receipt of the school authority's Design Team's early (stage 1) architectural design report, officials in my department advised the school authority in January 2024 to submit a revised report to address various recommendations. This revised Stage 1 addendum report was received in September 2024 and this is currently being reviewed from both a technical and cost perspective in accordance with the requirements of the public Infrastructure Guidelines. Once this review is complete my department will be in touch with the school authority directly on how best to progress this important project. All projects, including this one, undergo the necessary due diligence outlined in the public Infrastructure Guidelines.
195. Deputy Darren O'Rourke asked the Minister for Education for an update on building works at a school (details supplied). [43812/24]
Amharc ar fhreagraThe project for the school referred to by the is part of my Department's construction programme and will be delivered as part of a campus project which will provide a new 8 classroom primary school and accommodation, including 2 classrooms for children with special educational needs for Dunshaughlin CNS and a new 1,000 pupil post-primary school and accommodation, including 4 classrooms, for children with special educational needs for Coláiste Rioga.
The project currently has planning permission and is, along with a number of other projects, being brought to the level of employer-led design with a Design Team assigned to do so under the supervision of my Department’s project manager. The process of appointing the Design Team from the Department’s Frameworks of Consultants was completed in September 2023 and the project is currently close to completion of Stage 2(b) of the architectural design process. Stage 2(b) involves detailed design and the preparation of tender documentation. The next stage, subject to relevant Stage 2(b) approvals, will be Stage 3, tender stage.
Planning permission for Dunshaughlin CNS was granted on the 04/11/2020. In the event that an extension to the current planning permission is required, my Department's project manager will arrange for the preparation of the necessary documentation for same in due course.
The project is currently anticipated to progress to tender in Q4 2024 subject to relevant Stage 2B approvals. Projects are subject to relevant due diligence at each stage in the process, within the context of overall programme and budgetary parameters.
My Department will continue to liaise with the school and patron body in relation to interim accommodation requirements and provide any updates in relation to progress on the school building project.
196. Deputy Darren O'Rourke asked the Minister for Education for an update on building works at a school (details supplied). [43813/24]
Amharc ar fhreagraThe major building project for the school referred to by the Deputy is currently at an advanced stage of Architectural Planning - Stage 2(b) - Detailed Design, where the design team secure all statutory approvals and prepare the suite of tender documents.
The Design Team have recently made a revised application for statutory approvals and are completing any necessary revisions to the Stage 2b report, which will then be submitted to my Department for review.
Upon receipt and review of the Stage 2(b) Submission, the Design Team will then be requested to confirm to my Department in writing that their tender documents are in order and comply with all current Building and Procurement regulatory guidelines, and Department Technical Guidance documents, before the project is eligible to progress to tender stage.Department officials and the Programme Manager will keep the school authority informed in relation to project progression.
197. Deputy Niamh Smyth asked the Minister for Education to review an urgent case (details supplied); if her Department can overturn this decision given the extenuating circumstances in this case; and if she will make a statement on the matter. [43814/24]
Amharc ar fhreagraThe key factor for determining the level of staffing resources provided at individual school level is the staffing schedule for the relevant school year and pupil enrolments on the previous 30 September. The staffing arrangements includes an appeals mechanism for schools to submit a staffing appeal under certain published criteria.
The school referred to by the Deputy was successful in their appeal to the March meeting of the Primary Staffing Appeals Board and was informed that the additional post was provisional on the school achieving an enrolment of 78 on 30 September 2024. The school did not achieve the required enrolment and so the school was informed that the post would be suppressed at the end of October, in accordance with the arrangements for provisional posts set out in the primary staffing arrangements.
The school submitted a further appeal to the October meeting of the Primary Staffing Appeals Board but the appeal was deemed ineligible as the school’s appeal did not meet the eligibility criteria for appeal. The Primary Staffing Appeals Board operates independently of the Department and its decision is final.
The primary staffing schedule is a long-standing feature of the primary allocation system which ensures fairness and transparency in the allocation of mainstream class teachers across our primary schools. It is an important feature of the primary schedule that staffing levels remain aligned with actual student numbers in schools. The staffing appeals process is in place to allow schools the opportunity to appeal their teacher allocation, ensuring fairness and consistency.
198. Deputy Alan Kelly asked the Minister for Education the total unit cost for the provision of education in alternative education settings within the State, excluding Youthreach provision; how this compares to the total unit cost for the provision of education in traditional mainstream education settings; the level of additional onsite supports, such as counselling for students, within alternative education settings compared to traditional mainstream education settings; and if she will make a statement on the matter. [43815/24]
Amharc ar fhreagraWhile my Department primarily supports mainstream schools, it also provides funding for a small number of alternative education settings that provide education for a small cohort of children and young people, who for various reasons, have disengaged from mainstream education.
This provision is an alternative, when all other supports, options and pathways have been tried and have not proved successful in maintaining the young person’s engagement with mainstream education. These settings vary in structure and design and children and young people are referred from a range of sources including the Education Welfare Service, the child or young person’s mainstream school and parents or guardians.
In 2023, my Department provided the following funding to alternative education settings:
|
Name of Setting |
Non-Pay Grant |
Pay Grant/ETB Co-operation hours from Department |
|
Cork Life Centre |
€177,500.00 |
2,600 hrs |
|
City Motor Sports, Dublin 8 |
€118,475.00 |
Pay Grant - € 112.053.00 to end of September |
|
Carline Learning Centre, Lucan |
€175,000.00 |
Pay Grant - € 133,860.00 to end of September |
|
Inspire, Dublin 8 |
€29,611.00 |
3,306 hrs |
|
Colaiste Sliabh na mBan, Clonmel |
€ 56,000.00 |
15,043 hrs |
|
St Anthony’s Athlone |
€ 19,500.00 |
3,000 hrs |
|
St John's Glasnevin |
€ 51,376.00 |
Nil |
It is not possible to provide a total unit cost for the provision of education in these alternative education settings as many have additional funding sources.
In addition to the above , there are 5 Youth Encounter Projects, located in Dublin (3), Cork (1) and Limerick (1). Youth Encounter Projects are recognised primary special schools by my Department and cater for up to 25 children and young people who have disengaged from mainstream education.
199. Deputy Claire Kerrane asked the Minister for Education if she is aware of the SENO recommendation for two ASD classes in a school (details supplied); and if she will make a statement on the matter. [43817/24]
Amharc ar fhreagraEnabling children with special educational needs to receive an education is a priority for this government. It is also a key priority for me as Minister for Special Education & Inclusion, for my department and for the National Council for Special Education (NCSE).
The vast majority of children with special educational needs are supported to attend mainstream classes with their peers. Where children with more complex needs require additional supports, special classes and special school places are provided.
The NCSE has responsibility for coordinating and advising on the education provision for children with special educational needs nationwide and have advised that the school opened two autism classes in September 2023. I can also confirm that the school have submitted an Additional School Accommodation (ASA) application to my department's Planning and Building Unit. This application is currently under consideration and officials in my department have been liaising with the school regarding their application.
Over 1,700 classes have been sanctioned by the NCSE in recent years, in this time 11 new special schools have also been established and many more expanded. For this school year alone over 400 new special classes have been sanctioned bringing the total number of special classes nationwide to 3,336.
48 of these classes are in County Roscommon, 7 are new for the 2024/25 school year, 6 at primary level and 1 at post-primary level.
Budget 2025 provides funding for another 400 special classes and 300 special school places nationwide and it is estimated that a similar level of provision will be needed each year for the next 3 years.
The NCSE have recruited additional special education needs organisers (SENOs), advisors and team managers. SENOs play an important role in ensuring there is adequate special educational provision within local areas. The total number of SENOs has increased from 65 to 120. These SENOs are currently visiting schools to conduct planning meetings. The NCSE plan to conduct up to 800 of these visits by the end of this month. These visits will be key in terms of forward planning for the 2025/26 school year.
My department and the NCSE are engaging with schools and school management bodies in relation to the provision of future special classes and are committed to ensuring that sufficient special education placements will be available for children for this school year and future years.
200. Deputy Brendan Smith asked the Minister for Education if she will ensure that a school (details supplied) will not lose a teaching post in view of the extreme difficulties such a loss would create for the arrangement of classes, resulting in a very high pupil-teacher ratio; and if she will make a statement on the matter. [43820/24]
Amharc ar fhreagraThe key factor for determining the level of staffing resources provided at individual school level is the staffing schedule for the relevant school year and pupil enrolments on the previous 30 September. The staffing arrangements includes an appeals mechanism for schools to submit a staffing appeal under certain published criteria.
The school referred to by the Deputy was successful in their appeal to the March meeting of the Primary Staffing Appeals Board and was informed that the additional post was provisional on the school achieving an enrolment of 78 on 30 September 2024. The school did not achieve the required enrolment and so the school was informed that the post would be suppressed at the end of October, in accordance with the arrangements for provisional posts set out in the primary staffing arrangements.
The school submitted a further appeal to the October meeting of the Primary Staffing Appeals Board but the appeal was deemed ineligible as the school’s appeal did not meet the eligibility criteria for appeal. The Primary Staffing Appeals Board operates independently of the Department and its decision is final.
The primary staffing schedule is a long-standing feature of the primary allocation system which ensures fairness and transparency in the allocation of mainstream class teachers across our primary schools. It is an important feature of the primary schedule that staffing levels remain aligned with actual student numbers in schools. The staffing appeals process is in place to allow schools the opportunity to appeal their teacher allocation, ensuring fairness and consistency.
201. Deputy Brendan Smith asked the Minister for Education if she will ensure that a proposal is progressed without further delay which would ensure the best school provision for an area (details supplied); and if she will make a statement on the matter. [43821/24]
Amharc ar fhreagraI can confirm to the Deputy that the Department has received a request from the patrons of the schools in question, to amalgamate the two schools.
In November 2023, the Department issued a letter of approval to the Patron for the amalgamation to proceed.
The Department’s technical team have carried out an assessment of the schools and the proposed new site. The consideration of the accommodation requirements for the schools in question forms part of the Planning and Building Unit’s overall assessment of its work programme and priorities in the context of available capital funding.
As the Deputy will be aware the decision making authority for school amalgamations belongs to the patron or trustees of a school, and this is subject to the approval of the Minister for Education. Any proposed change must involve extensive negotiations at local level and must be well planned and managed in a manner that accommodates the interests of students, parents, teachers, local communities and contributes to an inclusive education system.
The provision of required school places, including for children with special educational needs, is a priority for the Department. Officials are working to ensure that there is sufficient provision to meet the school place needs in the schools in question and the wider area for 2024/25 and future years.
Officials from the Department are available to discuss the proposed amalgamation with the Patron body.
202. Deputy Bernard J. Durkan asked the Minister for Education her views on a matter (details supplied); and if she will make a statement on the matter. [43848/24]
Amharc ar fhreagraMy Department's main responsibility is to ensure that schools in an area can, between them, cater for all pupils seeking school places in the area. In relation to school admissions, it is the responsibility of the managerial authorities of all schools to implement an enrolment policy in accordance with the Education Act, 1998.
The Educational Welfare Services of the Child and Family Agency (Tusla) is the statutory agency that can assist parents who are experiencing difficulty in securing a school place for their child. The local service is delivered through the national network of Educational Welfare Officers.
A Senior Educational Welfare Officer has contacted the parent and the parent has confirmed that the student has a school place. The parent has been advised that there are closer schools to where they are residing, and relevant application forms have been forwarded to the parent for completion. The parent has advised that it is their preference to continue with the current arrangements until such time as a place becomes available in their locality.
203. Deputy Bernard J. Durkan asked the Minister for Education to indicate the preparations currently in hand or anticipated in respect of the provision of additional school places and new accommodation as required in respect of the primary and post-primary schools in Maynooth, County Kildare, including a Gaelcholáiste; and if she will make a statement on the matter. [43888/24]
Amharc ar fhreagraI can assure the Deputy that the provision of school places to meet the needs of children and young people at primary and post primary level, including children and young people with special educational needs is an absolute priority for the Department of Education.
In order to plan for school place needs, my Department divides the country into 314 school planning areas and utilises a Geographical Information System to anticipate school place demand. Information from a range of sources, including Child Benefit data, school enrolment data and information on residential development activity is used for this purpose. Additionally, Project Ireland 2040 population and housing targets inform my Department's projections of school place requirements.
In line with the Department's demographic projections of post primary school place requirements, there has been a continued growth in enrolments throughout many School Planning Areas in North Kildare. In response, the Department has invested significantly in schools in County Kildare over recent years. Since 2020, over €310m has been invested in schools in County Kildare. This investment has focused on provision of additional capacity to cater for its increasing population and there are further significant projects in our pipeline including for the North Kildare area.
At a national level, Ireland has been experiencing growth in overall post primary enrolments and this is projected to continue in many parts of the country for the next number of years before beginning to decline. However, first year enrolments nationally are expected to have peaked in the 2023/24 school year and are now beginning to decline. Across North Kildare there are almost 250 more first year places available for the 2025/26 school year than sixth class children.
Nevertheless, the Department has been putting in place a number of measures to support parents and post-primary schools in North Kildare, including Maynooth, with a view to helping the admissions process for 2025/26 run as smoothly as possible.
Firstly, the Department has written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
Secondly, the Department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
Furthermore, the successful data-sharing arrangements that were implemented for the 2024/25 admissions process in areas of enrolment pressure will be put in place again for the 2025/26 process, including for areas in North Kildare. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the Department will work with schools to put the necessary solutions in place.
My department is progressing a number of primary and post primary school building projects in the Maynooth School Planning Area. These projects include new school building projects for Gaelcholáiste Maynooth, to provide for 350 pupils and two Special Educations classroom, which is currently at Stage 1 and Gaelscoil Ruairí, to provide eight mainstream classrooms and two Special Education classrooms, currently at Stage 2b. In addition, the extension project at Presentation Girls Primary and recently completed projects will increase capacity in primary and post primary schools in Maynooth. As the Deputy will be aware, new school buildings for Maynooth CC and Maynooth Post Primary School have also recently been completed.
The Capital Programme details the school projects that are being progressed under Project Ireland 2040. The current status of large-scale projects being delivered under Project Ireland 2040, may be viewed on the Department's website at, www.gov.ie and this information is updated regularly. In addition, a list of large-scale projects completed from 2010 to date may also be viewed on the website.
My department will continue to keep the school place requirements in Maynooth, as with other areas across the country, under review.
204. Deputy Bernard J. Durkan asked the Minister for Education to indicate the preparations currently in hand or anticipated in respect of the provision of additional school places and new accommodation as required in respect of the primary and post-primary schools in Celbridge, County Kildare including the three schools project (details supplied); and if she will make a statement on the matter. [43889/24]
Amharc ar fhreagraI can assure the Deputy that the provision of school places to meet the needs of children and young people at primary and post primary level, including children and young people with special educational needs is an absolute priority for the Department of Education.
In order to plan for school place needs, my Department divides the country into 314 school planning areas and utilises a Geographical Information System to anticipate school place demand. Information from a range of sources, including Child Benefit data, school enrolment data and information on residential development activity is used for this purpose. Additionally, Project Ireland 2040 population and housing targets inform my Department's projections of school place requirements.
In line with the Department's demographic projections of post primary school place requirements, there has been a continued growth in enrolments throughout many School Planning Areas in North Kildare. In response, the Department has invested significantly in schools in County Kildare over recent years. Since 2020, over €310m has been invested in schools in County Kildare. This investment has focused on provision of additional capacity to cater for its increasing population and there are further significant projects in our pipeline including for the North Kildare area.
At a national level, Ireland has been experiencing growth in overall post primary enrolments and this is projected to continue in many parts of the country for the next number of years before beginning to decline. However, first year enrolments nationally are expected to have peaked in the 2023/24 school year and are now beginning to decline. Across North Kildare there are almost 250 more first year places available for the 2025/26 school year than sixth class children.
Nevertheless, the Department has been putting in place a number of measures to support parents and post-primary schools in North Kildare, including Celbridge, with a view to helping the admissions process for 2025/26 run as smoothly as possible.
Firstly, the Department has written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
Secondly, the Department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
Furthermore, the successful data-sharing arrangements that were implemented for the 2024/25 admissions process in areas of enrolment pressure will be put in place again for the 2025/26 process, including for areas in North Kildare. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the Department will work with schools to put the necessary solutions in place.
Scoil Naomh Padraig, Celbridge, Co Kildare has been approved for a large-scale project on a greenfield site to enter the Department’s pipeline of new school buildings to provide for a 16 classroom school plus provision for Special Education Needs classrooms. The project has been devolved to the National Development Finance Agency (NDFA) for delivery. The project is located on a shared education campus and is part of a bundled school building programme. The NDFA have appointed a Design Team and the Department is awaiting the submission of the initial architectural designs.
The Capital Programme details the school projects that are being progressed under Project Ireland 2040. The current status of large-scale projects being delivered under Project Ireland 2040, may be viewed on the Department's website at, www.gov.ie and this information is updated regularly. In addition, a list of large-scale projects completed from 2010 to date may also be viewed on the website.
My department will continue to keep the school place requirements in Celbridge, as with other areas across the country, under review.
205. Deputy Bernard J. Durkan asked the Minister for Education the preparations currently in hand or anticipated in respect of the provision of additional school places and new accommodation as required in respect of the primary and post-primary schools in Naas, County Kildare (details supplied); and if she will make a statement on the matter. [43890/24]
Amharc ar fhreagraI can assure the Deputy that the provision of school places to meet the needs of children and young people at primary and post primary level, including children and young people with special educational needs is an absolute priority for the Department of Education.
In order to plan for school place needs, my Department divides the country into 314 school planning areas and utilises a Geographical Information System to anticipate school place demand. Information from a range of sources, including Child Benefit data, school enrolment data and information on residential development activity is used for this purpose. Additionally, Project Ireland 2040 population and housing targets inform my Department's projections of school place requirements.
In line with the Department's demographic projections of post primary school place requirements, there has been a continued growth in enrolments throughout many School Planning Areas in North Kildare. In response, the Department has invested significantly in schools in County Kildare over recent years. Since 2020, over €310m has been invested in schools in County Kildare. This investment has focused on provision of additional capacity to cater for its increasing population and there are further significant projects in our pipeline including for the North Kildare area.
At a national level, Ireland has been experiencing growth in overall post primary enrolments and this is projected to continue in many parts of the country for the next number of years before beginning to decline. However, first year enrolments nationally are expected to have peaked in the 2023/24 school year and are now beginning to decline. Across North Kildare there are almost 250 more first year places available for the 2025/26 school year than sixth class children.
Nevertheless, the Department has been putting in place a number of measures to support parents and post-primary schools, including in North Kildare, with a view to helping the admissions process for 2025/26 run as smoothly as possible.
Firstly, the Department has written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
Secondly, the Department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
Furthermore, the successful data-sharing arrangements that were implemented for the 2024/25 admissions process in areas of enrolment pressure will be put in place again for the 2025/26 process, including for areas in North Kildare. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the Department will work with schools to put the necessary solutions in place.
My Department is progressing a number of primary and post primary school building projects in the Naas SPA. Including new school building projects for Mercy Convent and St. Corban's NS. These projects are currently Stage 4 and Stage 2b. In addition, there is an extension project for St. Mary's Girls Post Primary to increase capacity to LTPE of 1,000. This project is at Stage 2b. New school buildings have also recently been completed for Naas CC and Piper's Hill CC.
The Capital Programme details the school projects that are being progressed under Project Ireland 2040. The current status of large-scale projects being delivered under Project Ireland 2040, may be viewed on the Department's website at, www.gov.ie and this information is updated regularly. In addition, a list of large-scale projects completed from 2010 to date may also be viewed on the website.
My Department will continue to keep the school place requirements in Naas, as with other areas across the country, under review including by advancing required school building projects.
206. Deputy Bernard J. Durkan asked the Minister for Education to indicate the preparations currently in hand or anticipated in respect of the provision of additional school places and new accommodation as required in respect of the primary and post-primary schools in Clane, County Kildare, given the urgent necessity to ensure adequate provision for school enrolments in September 2025; and if she will make a statement on the matter. [43891/24]
Amharc ar fhreagraI can assure the Deputy that the provision of school places to meet the needs of children and young people at primary and post primary level, including children and young people with special educational needs is an absolute priority for the Department of Education.
In order to plan for school place needs, my Department divides the country into 314 school planning areas and utilises a Geographical Information System to anticipate school place demand. Information from a range of sources, including Child Benefit data, school enrolment data and information on residential development activity is used for this purpose. Additionally, Project Ireland 2040 population and housing targets inform my Department's projections of school place requirements.
In line with the Department's demographic projections of post primary school place requirements, there has been a continued growth in enrolments throughout many School Planning Areas in North Kildare. In response, the Department has invested significantly in schools in County Kildare over recent years. Since 2020, over €310m has been invested in schools in County Kildare. This investment has focused on provision of additional capacity to cater for its increasing population and there are further significant projects in our pipeline including for the North Kildare area.
At a national level, Ireland has been experiencing growth in overall post primary enrolments and this is projected to continue in many parts of the country for the next number of years before beginning to decline. However, first year enrolments nationally are expected to have peaked in the 2023/24 school year and are now beginning to decline. Across North Kildare there are almost 250 more first year places available for the 2025/26 school year than sixth class children.
Nevertheless, the Department has been putting in place a number of measures to support parents and post-primary schools in North Kildare, including Clane, with a view to helping the admissions process for 2025/26 run as smoothly as possible.
Firstly, the Department has written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
Secondly, the Department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
Furthermore, the successful data-sharing arrangements that were implemented for the 2024/25 admissions process in areas of enrolment pressure will be put in place again for the 2025/26 process, including for areas in North Kildare. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the Department will work with schools to put the necessary solutions in place.
My department is progressing a number of primary and post primary school building projects in the Prosperous_Clane School Planning Area. These projects include a new school building project for St. Farnan’s Post Primary school to increase capacity to 1000 pupils, existing PE hall to be refurbished and four Special Education classrooms which is currently at Stage 2b. Additional modular accommodation is also being provided at this school to address short-term capacity requirements in the area. The project at Scoil Mhuire Community School to provide two Science labs and shared preparation area, five mainstream classrooms and four Special Education classrooms is also at Stage 2b. In addition, the new school building for St. Patrick's BNS will increase capacity.
The Capital Programme details the school projects that are being progressed under Project Ireland 2040. The current status of large-scale projects being delivered under Project Ireland 2040, may be viewed on the Department's website at, www.gov.ie and this information is updated regularly. In addition, a list of large-scale projects completed from 2010 to date may also be viewed on the website.
My department will continue to keep the school place requirements in Clane, as with other areas across the country, under review.
207. Deputy Bernard J. Durkan asked the Minister for Education to indicate the preparations currently in hand or anticipated in respect of the provision of additional school places and new accommodation as required in respect of the primary and post-primary schools in Kilcock, County Kildare, given the urgent necessity to ensure adequate provision for school enrolments in September 2025; and if she will make a statement on the matter. [43892/24]
Amharc ar fhreagraI can assure the Deputy that the provision of school places to meet the needs of children and young people at primary and post primary level, including children and young people with special educational needs is an absolute priority for the Department of Education.
In order to plan for school place needs, my Department divides the country into 314 school planning areas and utilises a Geographical Information System to anticipate school place demand. Information from a range of sources, including Child Benefit data, school enrolment data and information on residential development activity is used for this purpose. Additionally, Project Ireland 2040 population and housing targets inform my Department's projections of school place requirements.
In line with the Department's demographic projections of post primary school place requirements, there has been a continued growth in enrolments throughout many School Planning Areas in North Kildare. In response, the Department has invested significantly in schools in County Kildare over recent years. Since 2020, over €310m has been invested in schools in County Kildare. This investment has focused on provision of additional capacity to cater for its increasing population and there are further significant projects in our pipeline including for the North Kildare area.
At a national level, Ireland has been experiencing growth in overall post primary enrolments and this is projected to continue in many parts of the country for the next number of years before beginning to decline. However, first year enrolments nationally are expected to have peaked in the 2023/24 school year and are now beginning to decline. Across North Kildare there are almost 250 more first year places available for the 2025/26 school year than sixth class children.
Nevertheless, the Department has been putting in place a number of measures to support parents and post-primary schools, including in North Kildare, with a view to helping the admissions process for 2025/26 run as smoothly as possible.
Firstly, the Department has written to all parents and guardians of children in sixth class with advice and guidance regarding the admissions process for post-primary for the 2025/26 school year. This letter advised parents to apply to multiple schools in areas where there is high demand and requested parents to take steps to avoid holding multiple places.
Secondly, the Department has improved the central Post-Primary On-line Database IT system that schools use to register student enrolments. This is an important improvement and is available to assist schools to manage the enrolment process and provide real-time notification to schools where a new student has accepted a school place in more than one school. This will help identify duplicate enrolments at a very early stage.
Furthermore, the successful data-sharing arrangements that were implemented for the 2024/25 admissions process in areas of enrolment pressure will be put in place again for the 2025/26 process, including for areas in North Kildare. It is expected that, as in previous years, the data sharing will provide confidence that there is sufficient school place availability in the majority of areas. However, if a shortfall of places is identified in an area, the Department will work with schools to put the necessary solutions in place.
My Department is progressing a number of primary and post primary school building projects in the Kilcock SPA. Including a new school building project for Enfield Post Primary to provide for mainstream capacity of 1,000 and four SEN classrooms. This project is at Stage 3. In addition, there are extension projects in progress for Scoil Dara, Scoil Ui Riada and Scoil Choca Naofa which will increase capacity.
The Capital Programme details the school projects that are being progressed under Project Ireland 2040. The current status of large-scale projects being delivered under Project Ireland 2040, may be viewed on the Department's website at, www.gov.ie and this information is updated regularly. In addition, a list of large-scale projects completed from 2010 to date may also be viewed on the website.
My Department will continue to keep the school place requirements in Kilcock, as with other areas across the country, under review.
208. Deputy Aengus Ó Snodaigh asked the Minister for Education the reason building works for a school (details supplied), due to commence on 19 August, have still not commenced; if it can be ensured that there are no further delays in beginning this work; and if the relevant officials can make contact with the school with an update on when the works will actually start. [43895/24]
Amharc ar fhreagraThe large scale capital project at the school referred to by the Deputy, is included in my Department’s Construction Programme which will be delivered under the National Development Plan (NDP) as part of Project Ireland 2040 framework.
My department’s planning and building unit issued the authorisation to issue the Letter of Acceptance for the successful tenderer, in May 2024. However, the lowest tenderer subsequently withdrew from the tender process prior to the Letter of Acceptance issuing as they could not stand over their tender.
My department officials are currently working through the tender process and will be in a position to update the school shortly.
209. Deputy Aengus Ó Snodaigh asked the Minister for Education if she accepts that a school (details supplied) is in a poor state of disrepair and that elements pose a health and safety risk; if she can confirm that the Department received photographs of the conditions; and if she will make a statement on the matter. [43896/24]
Amharc ar fhreagra210. Deputy Aengus Ó Snodaigh asked the Minister for Education the reason the Department has spent €90,000 annually on portacabins, which are not fit for purpose, at a school (details supplied); and if she will make a statement on the matter. [43897/24]
Amharc ar fhreagraI propose to take Questions Nos. 209 and 210 together.
My Department can confirm the rented prefabricated temporary units to which the Deputy refers are currently being used as an interim solution to meet the accommodation needs of the school. These units will be removed from site upon completion of the extension and refurbishment major project which is at an advanced stage of the tender process.
I can confirm receipt of photographs of the condition of the temporary accommodation. As these are rented prefabs, the school authority should contact the prefab supplier in relation to any necessary repairs that may be required pending completion of the major project.
212. Deputy Bernard J. Durkan asked the Minister for Tourism, Culture, Arts, Gaeltacht, Sport and Media to indicate the current progress in regard to a swimming pool for Maynooth, County Kildare, which has a very wide catchment area and population, in addition to a transient population of 20,000 students; and if she will make a statement on the matter. [43880/24]
Amharc ar fhreagraThe National Sports Policy, which was published in 2018, provided for the establishment of a Large Scale Sport Infrastructure Fund (LSSIF). The aim of the LSSIF is to provide Exchequer support for larger sports facility projects where the Exchequer investment would be greater than the maximum amount available under the Community Sport Facilities Fund (CSFF), formerly known as the Sports Capital and Equipment Programme (SCEP).
The first call for proposals under the LSSIF closed in 2019 with applications confined to local authorities and National Governing Bodies of Sport. New swimming pool projects and the refurbishment of existing swimming pools were eligible to apply for LSSIF grant funding subject to published guidelines and regulations. All applications were assessed in accordance with the published Evaluation Procedures and Guidelines with the first allocations announced in January 2020.
An application was received from Kildare County Council for design funding towards a new swimming pool in Maynooth with €1 million sought. The total funding applied for under the scheme significantly exceeded the amount available to allocate and the swimming pool project in Maynooth did not score sufficiently highly to be awarded a grant.
Earlier this year, Minister Martin and I announced funding of up to €120 million under the new 2024 round of the LSSIF.
The application period for LSSIF 2024 closed on 1 July 2024. A total of 96 applications were submitted and valid applications are now being assessed by my officials. No application was received in respect of funding for a swimming pool in Maynooth.
213. Deputy Colm Brophy asked the Minister for Housing, Local Government and Heritage the cost to the State of extending the first home scheme to first time buyers of second hand properties, based on the same criteria applying to the existing scheme, the same average equity stake and on the basis that 4,000, 5,000, 6,000 and 7,000 homes per year (new and second hand) would be approved under the scheme in each of the years 2026 to 2030. [43742/24]
Amharc ar fhreagraThe First Home Scheme, which launched in July 2022, is a shared equity scheme, designed to help bridge the gap for eligible first-time buyers, eligible homebuyers, and self-builders, between their deposit and mortgage, and the price of their new home (within price ceilings established across the country). Full details are available on the First Home Scheme website, www.firsthomescheme.ie/.
The First Home Scheme Designated Activity Company is responsible for the operation and management of the First Home Scheme on behalf of its shareholders - the State, Allied Irish Bank, Bank of Ireland and Permanent TSB.
On 6 October, the First Home Scheme published its Q3 2024 report, stating that over 5,560 First Home Scheme approvals have issued since its launch in July 2022 across all local authorities.
The report stated the average purchase price for purchases supported through FHS as €381,634, with the average equity support being provided by the First Home Scheme per home being €66,000 (17% of the average purchase price).
As such, the cost per additional 1,000 homes would be €66m. It should be noted however, that this does not account for any potential increase in the amount of equity share that a customer avails of.
Any additional funding would need to be provided collectively from the State and participating mortgage lenders, i.e. a 50:50 division of funding. Furthermore, as the First Home Scheme is demand driven, funds will be drawn down as and when required.
214. Deputy Richard O'Donoghue asked the Minister for Housing, Local Government and Heritage to provide a copy of public submissions made to the draft 2019 wind energy development guidelines, specifically those made by MAS Environmental, the Institute of Acoustics, Wind Energy Ireland, the Environmental Protection Agency, Department of Health, HSE Environmental Health Office, the Office of Planning Regulator, Eirgrid, the CRU any and all local authorities; and if he will make a statement on the matter. [43805/24]
Amharc ar fhreagraMy Department is currently undertaking a focused review of the 2006 Wind Energy Development Guidelines. The review is addressing a number of key aspects of the Guidelines including noise, setback distance, shadow flicker, community obligation, community dividend and grid connections.
As part of the review process, a ten-week public consultation on the draft revised Wind Energy Development Guidelines was held from 12 December 2019 to 19 February 2020. Almost 500 submissions were received as part of the public consultation, many of which are extremely detailed and technical in nature. Further to this public consultation, the Department of the Environment, Climate and Communications (DECC), in light of its environmental noise remit, appointed expert noise consultants to inform any amendments to the noise aspect of the Guidelines in line with existing standards and international best practice.
My Department, in conjunction with DECC and its expert noise consultants, will make any further changes to the draft Guidelines which are deemed necessary or appropriate in the wake of this work to ensure that the finalised Guidelines, once issued, are fit for purpose to provide guidance in line with renewable energy and climate targets, whilst having appropriate regard to the impacts of wind energy development, including in relation to noise annoyance.
As things stand, the review of the Wind Energy Development Guidelines is ongoing and the submissions received as part of the 2019 public consultation remain under consideration in this regard. As such, my Department is not in a position to release the submissions at this time while they form part of the ongoing review process. However, it is my intention to release all submissions associated with 2019 public consultation at the appropriate juncture.
215. Deputy Anne Rabbitte asked the Minister for Housing, Local Government and Heritage the status of an application for capital assistance scheme funding for a service (detail supplied); the date on which it will be sanctioned; and if he will make a statement on the matter. [43576/24]
Amharc ar fhreagraThe application for funding under the Capital Assistance Scheme in this instance, is in respect of the capital costs for a new construction development. Regrettably, it appears that there was a significant delay from when the group undertook the construction tender, before my Department received the required post-tender cost proposal.
My Department is now examining the proposed construction costs, bearing in mind the time lapse since the group undertook the tendering process, and will be in contact with the local authority shortly on this.
216. Deputy Martin Kenny asked the Minister for Housing, Local Government and Heritage if his Department will publish the bird surveys that was a condition attached to the granting of planning approval for a wind farm (details supplied); and if he will make a statement on the matter. [43595/24]
Amharc ar fhreagraThe National Parks and Wildlife Service (NPWS) of my Department monitors, conducts and commissions ecological surveys for a wide range of species, including birds, linked with a suite of statutory requirements, such as reporting as required under Article 12 of the Birds Directive (Directive 2009/147/EC). It is not routine for NPWS to carry out monitoring surveys for private planning applications. The publication of such surveys is a matter for the consenting authority.
The Minister for Housing, Local Government and Heritage is a statutory consultee in the planning and development system and competent authorities responsible for granting consent may request the NPWS to provide a submission on such proposals in relation to impacts on nature conservation. When the Minister is referred such cases via the Development Applications Unit, staff within the NPWS may provide relevant observations to the competent authority.
Further information can be found at: www.npws.ie/development-consultations#The%20role%20of%20the%20Minister%20in%20relation%20to%20development%20applications
217. Deputy David Stanton asked the Minister for Housing, Local Government and Heritage to outline the funding, if any, allocated under any scheme administered by his Department to a building (details supplied), from 2019 to 2024 inclusive; and if he will make a statement on the matter. [43603/24]
Amharc ar fhreagraMy Department is not funding the project referred to through the Urban Renewal and Development Fund (URDF). Any queries in relation to library funding should be directed to the Libraries Unit of the Department of Rural and Community Development.
218. Deputy Cian O'Callaghan asked the Minister for Housing, Local Government and Heritage the amount of additional funding, if any, allocated for the capital assistance scheme in budget 2025; and if he will make a statement on the matter. [43665/24]
Amharc ar fhreagraI refer to the reply to Question No. 458 of 22 October 2024, which sets out the position in this matter.
219. Deputy Cian O'Callaghan asked the Minister for Housing, Local Government and Heritage the amount of additional funding allocated for the housing adaptation grant for people with a disability; the amount of additional funding allocated for implementation of the recommendations of the adaptation grant review in budget 2025; and if he will make a statement on the matter. [43666/24]
Amharc ar fhreagra221. Deputy Cian O'Callaghan asked the Minister for Housing, Local Government and Heritage to detail additional funding allocated to support the implementation of the Housing Strategy for Disabled People 2022-2027 in budget 2025; and if he will make a statement on the matter. [43668/24]
Amharc ar fhreagra223. Deputy Claire Kerrane asked the Minister for Housing, Local Government and Heritage to advise when the household limit thresholds will rise for the housing adaptation grants for persons with a disability; and if he will make a statement on the matter. [43705/24]
Amharc ar fhreagraI propose to take Questions Nos. 219, 221 and 223 together.
I refer to the reply to Question No. 461 of 22 October 2024, which sets out the position in this matter.
220. Deputy Cian O'Callaghan asked the Minister for Housing, Local Government and Heritage the amount of additional funding allocated in budget 2025 to support adaptation works on local authority social homes; and if he will make a statement on the matter. [43667/24]
Amharc ar fhreagraI refer to the reply to Question No. 460 of 22 October 2024, which sets out the position in this matter.
222. Deputy Pearse Doherty asked the Minister for Housing, Local Government and Heritage if he is considering changing the defective blocks scheme legislation for exceptional cases to allow side-by-side construction; if he is aware of the difficulties where disability is a factor affecting sourcing suitable temporary accommodation; and if he will make a statement on the matter. [43677/24]
Amharc ar fhreagraI commenced the Remediation of Dwellings Damaged by the Use of Defective Concrete Blocks Act 2022 (the Act) on 22 June 2023 which contains the enhanced grant scheme and adopted the related Regulations on 29 June 2023.
The scheme facilitates the remediation of existing houses that have been damaged by the use of defective concrete blocks. The construction of new separate additional houses is not grant funded.
I have been supportive of the role of facilitators in assisting homeowners through the enhanced grant scheme process. Facilitators are in place in Donegal and can assist homeowners in securing temporary accommodation with priority given to homeowners and families that are most vulnerable. Furthermore a grant is available to homeowners under the Scheme to help them source alternative accommodation. The Government raised this grant amount by 10% to €16,500 on 22 October 2024.
The 2022 DCB Act, as set down by the Oireachtas provides that exempt development status shall automatically apply to remediation works approved under the grant scheme subject to certain provisions set out in Section 28 of the Act. Importantly, remediation works shall only be exempt where on completion of remediation works the dwelling house is not inconsistent with or materially different from the appearance and character of the original dwelling house.
However, there is flexibility in terms of footprint of a rebuild and exact rebuild on the footprint is not required, subject to compliance with Building Regulations and compliance with planning. In such scenarios homeowners should engage with their Competent Building Professional to consider the possible impact on any energy retrofit work they may be considering and the effect a different footprint may have on such works and/or associated grants.
Section 51 of the Act mandates that I commence a review of the operation of the Act by June 2026 (three years after the Act's commencement) and make a report to each House of the Oireachtas regarding the findings and conclusions of such a review within a further 12 month period.
224. Deputy Alan Farrell asked the Minister for Housing, Local Government and Heritage the cost of extending the waiver of local authority ‘section 48’ development contributions, and the refunding of Uisce Éireann water and wastewater connection charges for one calendar year. [43778/24]
Amharc ar fhreagraI refer to the reply to Question No. 267 of 8 October 2024, which sets out the position in this matter.
225. Deputy Cian O'Callaghan asked the Minister for Housing, Local Government and Heritage if he will align the reckonable income for social housing and the local authority home loan to ensure that no family is unfairly excluded from both due to different income sources being considered for each; and if he will make a statement on the matter. [43796/24]
Amharc ar fhreagraThe income assessed for eligibility for both schemes are broadly similar. However while the Social Housing income limits are set in net income terms, the Local Authority Home Loan income limits are expressed in gross annual income terms.
Applications for social housing support are assessed by the relevant local authority, in accordance with the eligibility and need criteria set down in section 20 of the Housing (Miscellaneous Provisions) Act 2009 and the associated Social Housing Assessment Regulations 2011, as amended.
The 2011 Regulations, as amended, prescribe maximum net income limits for each local authority, in different bands according to the area concerned, with income being defined and assessed according to a standard Household Means Policy.
Under the Policy, net income for social housing assessment is defined as gross household income less income tax, PRSI, Universal Social Charge and Additional Superannuation Contribution. The Policy provides for a range of income disregards, and local authorities have discretion to decide to disregard income that is temporary, short-term or once-off in nature. However, with the exception of the specific payments listed in the Policy as being disregarded, all income from social insurance and social assistance payments, allowances and benefits, and maintenance payments received is assessable.
My Department is currently in the process of reviewing assessable and non-assessable income under the Household Means Policy in order to ensure it continues to be appropriate.
The Local Authority Home Loan is a Government-backed mortgage for creditworthy applicants who cannot get sufficient funding from commercial banks to purchase or build a home. Single applicants must not be earning greater than €70,000 annual gross income in the previous tax year, while joint applicants must not be earning greater than €85,000 annual combined gross income in the previous tax year.
For the Local Authority Home Loan, all taxable income with the exception of three payments from the Department of Social Protection, namely Carers Benefit, Carers Allowance and Community Employment Schemes are included in the calculation for eligibility for the scheme.
Given that the Local Authority Home Loan income limits are notably higher than the social housing income limits, it is unlikely that an applicant who, on income grounds, is eligible for social housing would not be eligible for the loan.
There are no plans at present to change the income eligibility criteria for the Local Authority Home Loan.
226. Deputy Brendan Griffin asked the Minister for Social Protection for assistance with a matter regarding a national school in County Kerry (details supplied); and if she will make a statement on the matter. [43752/24]
Amharc ar fhreagraThere are some 2,200 primary schools currently eligible for hot school meals for the 2024-2025 school year. As announced in Budget 2025, Hot School Meals will be extended to all remaining primary schools in 2025 meaning that there will be 3,200 eligible schools in respect of 550,000 children.
Schools are responsible for choosing their own School Meals supplier on the open market in a fair and transparent manner in accordance with Public Procurement rules. My Department provides the funding directly to the schools, who are then required to procure the provision of the food in compliance with Government procurement rules and with relevant Hazard Analysis and Critical Control Point, Food Safety regulations and the Nutritional Standards for School Meals.
In circumstances where a school is unable to secure a hot meals supplier due to its location or facilities and space, I would suggest they reach out to local caterers or supermarkets within its area. If a school is still unsuccessful in securing a supplier, they should then try to source a local supplier that could instead provide a lunch with drink as an alternative to a hot meal.
If the school referred to by the Deputy has any questions in relation to this matter, they can contact officials of my Department, at school.meals@welfare.ie, and they will clarify any queries that the school may have and advise them of the options available to them.
I trust this clarifies the matter.
227. Deputy Jackie Cahill asked the Minister for Social Protection if a person born before 1946 can get credit for caring for family members in order to qualify for the contributory pension, similar to the home caring periods scheme; and if she will make a statement on the matter. [43619/24]
Amharc ar fhreagraFrom September 2012, the rates of State Pension (Contributory) paid to those who had a yearly average of less than 40 contributions was lowered.
In recognition that these rate changes may have negatively impacted certain cohorts, in January 2018, the Government announced an Interim Total Contributions Approach (TCA) to calculate the entitlement of pensioners who reached State pension age on or after 1 September 2012 (i.e., those born on or after 1 September 1946) and who had a reduced rate pension entitlement based on those post Budget 2012 rate bands. As part of the Total Contributions Approach, HomeCaring Periods were introduced for the first time which allowed those who cared for children, or other dependent relatives, claim up to 20 years in lieu of contributions.
People whose pensions were decided under the 2000-2012 rate bands (i.e., those born before 1 September 1946) were subject to a significantly more generous payment regime than those who qualified before or afterwards, as a Yearly Average of only 20 contributions per year (out of a possible maximum of 52) could attract a 98% pension. If pre-2012 pensioners were also allowed avail of the interim Total Contributions Approach, including HomeCaring Periods, their arrangements, as a group, would be significantly more generous than those of post-2012 pensioners.
It should be noted that since January 2024, long-term carer's contributions can be awarded to a person who has cared for an incapacitated person for a period of 20 years or more. These contributions will be treated the same as paid contributions for State Pension (Contributory) entitlement only and can be used to fill any gaps in a person's contribution record, including satisfying the minimum 520 contributions required for eligibility. Individuals born before 1946 are eligible for long-term carer's contributions where they have been caring for an incapacitated dependent. Such a person can apply for long-term carer's contributions and receive a State Pension (Contributory) or an enhanced rate of pension if already in receipt of less than the maximum rate from 1st January 2024 where eligible.
I trust this clarifies the matter for the Deputy.
228. Deputy Pearse Doherty asked the Minister for Social Protection the processing time for carer's allowance reviews for each month in 2023 and to date in 2024, in tabular form; and if she will make a statement on the matter. [43680/24]
Amharc ar fhreagra229. Deputy Pearse Doherty asked the Minister for Social Protection the processing times for carer's allowance applications for each month in 2023 and to date in 2024, in tabular form; and if she will make a statement on the matter. [43681/24]
Amharc ar fhreagraI propose to take Questions Nos. 228 and 229 together.
Carer's Allowance (CA) is a means-tested social assistance payment made to a person who is habitually resident in the State and who is providing full-time care and attention to a child or an adult who has such a disability that, as a result, they require that level of care.
The table below shows the average processing times for CA applications by month for 2023:
|
January |
9 weeks |
|
February |
6 weeks |
|
March |
6 weeks |
|
April |
7 weeks |
|
May |
7 weeks |
|
June |
7 weeks |
|
July |
6 weeks |
|
August |
6 weeks |
|
September |
6 weeks |
|
October |
6 weeks |
|
November |
6 weeks |
|
December |
5 weeks |
The table below shows the average processing times for CA by month to date in 2024:
|
January |
6 weeks |
|
February |
4 weeks |
|
March |
5 weeks |
|
April |
6 weeks |
|
May |
6 weeks |
|
June |
6 weeks |
|
July |
7 weeks |
|
August |
7 weeks |
|
September |
7 weeks |
The data requested on Carer's Allowance Reviews is not available in the format requested. The time taken to conduct a review is dependent on the type of review being carried out and the information available at the time of the request. Some reviews require more detailed investigation and interaction with the customer and this can lengthen the timeframe of the review.
However, at all times every effort is made to complete reviews as quickly as possible.
I hope this clarifies the position for the Deputy.